Back to kitchen remodel contractors
D L Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to May 2026
- Last 24 months
- 3 permits filed
16 permits since 2000: 12 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2023 | Expired or cancelled expired Jan 2026 | 43 Diamond St | interior remodel only: convert (e) family room & bedroom to be a (n) adu at 1st flr. add (n) kitchen, convert half bath to be a (n) full bathroom. no structural changes, all other details shall refer to pa# 2003-0114-5180Details
interior remodel only: convert (e) family room & bedroom to be a (n) adu at 1st flr. add (n) kitchen, convert half bath to be a (n) full bathroom. no structural changes, all other details shall refer to pa# 2003-0114-5180 | $40,000 |
| Dec 24, 2019 | Completed final sign-off Mar 2020 | 1222 34th Av | 2nd fl kitchen and bath remodel, replace counter top, tiles, cabinets. no structural work.Details
2nd fl kitchen and bath remodel, replace counter top, tiles, cabinets. no structural work. | $20,000 |
| Sep 23, 2019 | Completed final sign-off Mar 2020 | 1337 Ortega St | remodel existing kitchen and bathroom. change cabinets and countertop. change tub, vanity, and toilet. no floor plan changeDetails
remodel existing kitchen and bathroom. change cabinets and countertop. change tub, vanity, and toilet. no floor plan change | $20,000 |
| Jan 25, 2019 | Completed final sign-off Jun 2019 | 101 Midcrest Wy | remodel existing kitchen and bathroom. change cabinets, counter top, tiles and tub/shower, vanity. kitchen 12x12. bathroom 5x8Details
remodel existing kitchen and bathroom. change cabinets, counter top, tiles and tub/shower, vanity. kitchen 12x12. bathroom 5x8 | $18,000 |
| May 10, 2017 | Completed final sign-off Oct 2017 | 132 Douglass St | bathroom addition at 2nd flr, closet reconstruction, close wall, and open doorway btwn kitchen and dining rm. remove staircase to attic and add drop down ladder.Details
bathroom addition at 2nd flr, closet reconstruction, close wall, and open doorway btwn kitchen and dining rm. remove staircase to attic and add drop down ladder. | $35,000 |