D Kelly Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jan 2025
- Last 24 months
- 1 permit filed
167 permits since 2000: 126 completed, 1 in progress, 25 never finaled, 15 expired or cancelled.
Of the 25 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 12 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 in progress. Typically 40 days from filing to permit and 729 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2025 | In progress filed Jan 2025, not yet issued | 2201 Broadway | repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage.Details
repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage. | $25,000 |
| Mar 23, 2011 | Completed final sign-off Sep 2012 | 871 Sutter St | revision to application #2010-01-27-5406: revised rear stair direction/landing, additional structural per elevator contractor, beam removal at lower level, revise steal collector at lower level.Details
revision to application #2010-01-27-5406: revised rear stair direction/landing, additional structural per elevator contractor, beam removal at lower level, revise steal collector at lower level. | $18,950 |
| Jan 27, 2010 | Completed final sign-off Sep 2012 | 871 Sutter St | add wood framed, stucco finish elevator shaft to rear of (e) building. elevator cab to serve 1st./ground level floor and basement. modify existing window opening to accomodate new elevator. modify (e) stairs for code compliance upgrades.Details
add wood framed, stucco finish elevator shaft to rear of (e) building. elevator cab to serve 1st./ground level floor and basement. modify existing window opening to accomodate new elevator. modify (e) stairs for code compliance upgrades. | $87,465 |
| Apr 7, 2009 | Completed final sign-off Sep 2012 | 871 Sutter St | barrier removal: horizontal addition of new elevator at rear of building to provide clear access to both floors. reconfigure existing rear stairs for exiting requirements and to allow for new elevator housing.Details
barrier removal: horizontal addition of new elevator at rear of building to provide clear access to both floors. reconfigure existing rear stairs for exiting requirements and to allow for new elevator housing. | $98,700 |
| Aug 15, 2005 | Completed final sign-off Jan 2006 | 1799 Union St | repair (e)exterior stair.upgrade stair to cbc & ada cmplace 4th to third level.barrier removal onlyDetails
repair (e)exterior stair.upgrade stair to cbc & ada cmplace 4th to third level.barrier removal only | $10,000 |