Back to kitchen remodel contractors
D K I Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to Sep 2024
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 13 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2022 | Completed final sign-off Oct 2024 | 75 Fairfield Wy | 1st floor: add 1bedroom , family room, home office and 1.5 bathroom. 2nd floor: remodel kitchen, bathroom, add 1 full bathroom.Details
1st floor: add 1bedroom , family room, home office and 1.5 bathroom. 2nd floor: remodel kitchen, bathroom, add 1 full bathroom. | $110,000 |
| Nov 9, 2021 | Completed final sign-off Dec 2022 | 341 San Fernando Wy | alter (e) floor layout including demo and construction 2/f: remodel (e) bathroom, closet and kitchen. remove wall b/w kitchen and dining and install beam.Details
alter (e) floor layout including demo and construction 2/f: remodel (e) bathroom, closet and kitchen. remove wall b/w kitchen and dining and install beam. | $38,000 |
| May 5, 2017 | Completed final sign-off Aug 2017 | 425 01st St | replace (e) closet door, replace kitchen disposal and faucets, exchange (e) ceiling housing to led housing and adding new ceiling lights to the same circuits in the hallway, bathroom, and closet.Details
replace (e) closet door, replace kitchen disposal and faucets, exchange (e) ceiling housing to led housing and adding new ceiling lights to the same circuits in the hallway, bathroom, and closet. | $15,000 |
| Jan 11, 2016 | Completed final sign-off Mar 2016 | 1554 23rd Av | kitchen and bath remodel. 23 ceiling lights, relocate subpanelDetails
kitchen and bath remodel. 23 ceiling lights, relocate subpanel | $25,000 |
| Nov 16, 2015 | Completed final sign-off Aug 2016 | 185 Stonecrest Dr | at 1st floor - construct new partition walls for new media room & half toilet room. at 2nd floor - remodel (e) bathrooms & add new bathroom, new outlte & fix fixtures & remodel kitchen & remove walls.Details
at 1st floor - construct new partition walls for new media room & half toilet room. at 2nd floor - remodel (e) bathrooms & add new bathroom, new outlte & fix fixtures & remodel kitchen & remove walls. | $48,000 |