D J Construction & Design
- Based in
- So. Sf
- On San Francisco permits
- Jul 2010 to May 2015
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 2 days from filing to permit and 46 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2011 | Completed final sign-off Oct 2011 | 30 Crestline Dr | dryrot repair on 6 decks and replace 6' of guardrail on each deck. less than 50 %, replace deck boards and 6' guardrail. no framing replacementDetails
dryrot repair on 6 decks and replace 6' of guardrail on each deck. less than 50 %, replace deck boards and 6' guardrail. no framing replacement | $6,000 |
| Mar 7, 2011 | Completed final sign-off May 2011 | 1069 14th St | to comply w/ nov #201194226 - replacement o fdecking & structural members due to dryrot in existing permitted deck. replace railing.Details
to comply w/ nov #201194226 - replacement o fdecking & structural members due to dryrot in existing permitted deck. replace railing. | $12,000 |