D Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2016 to Jun 2026
- Last 24 months
- 9 permits filed
107 permits since 2000: 86 completed, 9 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
12 deck permits: 11 completed, 1 never finaled. Typically 20 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2023 | Completed final sign-off Jan 2025 | 2367 32nd Av | 1st fl relocate bedrm/laundry. add family rm, 2 baths, wetbar. 2nd fl reconfig interior layout. remodel kitchen, (revision to 202306139997) dining rm, liv rm, bath,bdrms,inter stair. add 8 skylights.rear deck/stairs.replace 6 windows at front with alum clad wood windowsDetails
1st fl relocate bedrm/laundry. add family rm, 2 baths, wetbar. 2nd fl reconfig interior layout. remodel kitchen, (revision to 202306139997) dining rm, liv rm, bath,bdrms,inter stair. add 8 skylights.rear deck/stairs.replace 6 windows at front with alum clad wood windows | $250,000 |
| Nov 2, 2022 | Completed final sign-off Dec 2022 | 421 Point Lobos Av | revision to 202010176780. 2nd fl: reconfigure master bath layout and new glass railing at interior stairs. rear deck: new steel cable railing and covered ceiling under deck. new rear siding and new garage door.Details
revision to 202010176780. 2nd fl: reconfigure master bath layout and new glass railing at interior stairs. rear deck: new steel cable railing and covered ceiling under deck. new rear siding and new garage door. | |
| Jul 1, 2022 | Completed final sign-off Dec 2022 | 249 Amherst St | new exterior 2/f deck with stairscase to rear yard.Details
new exterior 2/f deck with stairscase to rear yard. | $30,000 |
| Jan 13, 2022 | Completed final sign-off Dec 2022 | 65 Delano Av | 1/f: replace (e) foundation, new bathroom, relocate washer/dryer, water heater/furnace. replace garage door at rear side of building. 2/f: new deck and stairway to rear yard. new bathroom at kitchen, reconfigure (e) bathroom as per plan.Details
1/f: replace (e) foundation, new bathroom, relocate washer/dryer, water heater/furnace. replace garage door at rear side of building. 2/f: new deck and stairway to rear yard. new bathroom at kitchen, reconfigure (e) bathroom as per plan. | $46,000 |
| Nov 6, 2020 | Completed final sign-off Jul 2022 | 148 Chilton Av | revision to pa# 202001081475. infill window at 1/fl master bathroom and relocate plumbing fixtures at master bathroom. enlarge laundry area at 1/fl. infill window at 2/f office. relocate windows on 2/f kitchen and dining area.relocate rear wooden steps at deck (n) vaulted ceiling and skylight on 2/fDetails
revision to pa# 202001081475. infill window at 1/fl master bathroom and relocate plumbing fixtures at master bathroom. enlarge laundry area at 1/fl. infill window at 2/f office. relocate windows on 2/f kitchen and dining area.relocate rear wooden steps at deck (n) vaulted ceiling and skylight on 2/f | |
| Jan 8, 2020 | Completed final sign-off Jul 2022 | 148 Chilton Av | proposed new deck on 2nd floor. 1)relocate extg laundry machines. relocate & upgrade extg heating furnace and water heater on 1st floor per plan. redesign interior staircase. 2) rlocate & remodel kitchen, enlarge extg dining area. reconfigure bedroom & convert one to m. bedroom.Details
proposed new deck on 2nd floor. 1)relocate extg laundry machines. relocate & upgrade extg heating furnace and water heater on 1st floor per plan. redesign interior staircase. 2) rlocate & remodel kitchen, enlarge extg dining area. reconfigure bedroom & convert one to m. bedroom. | $100,000 |
| Jan 11, 2019 | Completed final sign-off Jul 2019 | 2350 30th Av | revision to app#201811065173 on 2nd floor. reconfigure deck at rear and relocate 2 skylights. new side wndow at recessed entrance.Details
revision to app#201811065173 on 2nd floor. reconfigure deck at rear and relocate 2 skylights. new side wndow at recessed entrance. | $200 |
| Jan 3, 2019 | Completed final sign-off Dec 2019 | 635 42nd Av | 1/f: add 2 bedrooms, 2 full bathroom, family room with wet bar, office and laundry, new interior stairs and new deck at rear. 2nd floor: remodel kitchen and bathroom. add 1 full bathr new roof deck.Details
1/f: add 2 bedrooms, 2 full bathroom, family room with wet bar, office and laundry, new interior stairs and new deck at rear. 2nd floor: remodel kitchen and bathroom. add 1 full bathr new roof deck. | $120,000 |
| Oct 25, 2018 | Never finaled issued Jan 2019, no final | 5525 Diamond Heights Bl | infill under building overhang to add family room, add shearwalls around new familty room. reinforce (e) contilever decksDetails
infill under building overhang to add family room, add shearwalls around new familty room. reinforce (e) contilever decks | $30,000 |
| Jun 19, 2018 | Completed final sign-off Mar 2019 | 2542 42nd Av | revision to 201801057983 to add scope: add deck at rearDetails
revision to 201801057983 to add scope: add deck at rear | $5,000 |
| Oct 17, 2017 | Completed final sign-off Mar 2018 | 4127 Ulloa St | 1st floor: infill at rear, add 2 bedrooms, 1 full bath, and family room. 2nd floor: remodel kitchen and bath, add 1 full bath, and new deck at rear. less than 75% existing interior walls demo.Details
1st floor: infill at rear, add 2 bedrooms, 1 full bath, and family room. 2nd floor: remodel kitchen and bath, add 1 full bath, and new deck at rear. less than 75% existing interior walls demo. | $75,000 |
| Feb 10, 2016 | Completed final sign-off Nov 2019 | 177 Oxford St | to comply with nov 201562181 to replace rear deck, stairs & landing & posts at second floor. turn back to original.Details
to comply with nov 201562181 to replace rear deck, stairs & landing & posts at second floor. turn back to original. | $4,500 |