Back to bathroom remodel contractors
D Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2016 to Jun 2026
- Last 24 months
- 9 permits filed
107 permits since 2000: 86 completed, 9 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
49 bathroom remodel permits: 43 completed, 4 in progress, 1 never finaled, 1 expired or cancelled. Typically 21 days from filing to permit and 318 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2026 | In progress issued Jun 2026 | 3680 20th St | unit 3680 1/2: kitchen and bathroom remodel like for like, relocate (e) tankless water heater to 1st flr of bldg.Details
unit 3680 1/2: kitchen and bathroom remodel like for like, relocate (e) tankless water heater to 1st flr of bldg. | $70,000 |
| Jan 15, 2026 | In progress issued Jan 2026 | 727 33rd Av | 1/f: infill rear. add 1 bedroom. family room, den and 1.5 baths. 2/f: remodel (e) kitchen and bathroom. add 1 full bathroom. reconfigure interior stairs.Details
1/f: infill rear. add 1 bedroom. family room, den and 1.5 baths. 2/f: remodel (e) kitchen and bathroom. add 1 full bathroom. reconfigure interior stairs. | $300,000 |
| Jun 9, 2025 | In progress issued May 2026 | 3680 20th St | 1/f: remodel (e) commerical space to new adu per planning code section 207.1 (3680 20th st). new adu include bedroom, bathroom, kitchen, and dining room.Details
1/f: remodel (e) commerical space to new adu per planning code section 207.1 (3680 20th st). new adu include bedroom, bathroom, kitchen, and dining room. | $98,000 |
| Nov 22, 2023 | In progress issued Oct 2024 | 201 14th Av | interior remodel 1st, 2nd and 3rd fls. 1st floor (201): new bedroom and additon of space within building envelope. 2nd fl 203: 2 new bedrooms, 2 n ew baths and new kitchen. 3rd fl 205: 2 new bdrms,2 new baths, new kitchen. common egress stairs to be rebuilt to comply with building codeDetails
interior remodel 1st, 2nd and 3rd fls. 1st floor (201): new bedroom and additon of space within building envelope. 2nd fl 203: 2 new bedrooms, 2 n ew baths and new kitchen. 3rd fl 205: 2 new bdrms,2 new baths, new kitchen. common egress stairs to be rebuilt to comply with building code | $88,000 |
| Nov 1, 2023 | Completed final sign-off Mar 2024 | 851 Edinburgh St | 2/f: resize existing bedroom and add new bathroom.Details
2/f: resize existing bedroom and add new bathroom. | $15,000 |
| Oct 20, 2023 | Completed final sign-off Dec 2024 | 882 42nd Av | 1/f: add 1 bedroom, 1 den, family room, media room, 1 office, and 2 full baths. new 40" high wall at rearDetails
1/f: add 1 bedroom, 1 den, family room, media room, 1 office, and 2 full baths. new 40" high wall at rear | $65,000 |
| Sep 7, 2023 | Completed final sign-off Aug 2024 | 234 Ottawa Av | 1st floor: add 2 bed room, 1 full bath a nd media room with wetbar. 2nd floor: add 1 new bedroom and relocate kitchenDetails
1st floor: add 2 bed room, 1 full bath a nd media room with wetbar. 2nd floor: add 1 new bedroom and relocate kitchen | $75,000 |
| Sep 7, 2023 | Completed final sign-off Jan 2025 | 2367 32nd Av | 1st fl relocate bedrm/laundry. add family rm, 2 baths, wetbar. 2nd fl reconfig interior layout. remodel kitchen, (revision to 202306139997) dining rm, liv rm, bath,bdrms,inter stair. add 8 skylights.rear deck/stairs.replace 6 windows at front with alum clad wood windowsDetails
1st fl relocate bedrm/laundry. add family rm, 2 baths, wetbar. 2nd fl reconfig interior layout. remodel kitchen, (revision to 202306139997) dining rm, liv rm, bath,bdrms,inter stair. add 8 skylights.rear deck/stairs.replace 6 windows at front with alum clad wood windows | $250,000 |
| Jun 13, 2023 | Completed final sign-off Jan 2025 | 2367 32nd Av | remodel kitchen and bathroom at 2nd floor. in kindDetails
remodel kitchen and bathroom at 2nd floor. in kind | $42,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 201 14th Av | comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit.Details
comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit. | $67,000 |
| Nov 2, 2022 | Completed final sign-off Dec 2022 | 421 Point Lobos Av | revision to 202010176780. 2nd fl: reconfigure master bath layout and new glass railing at interior stairs. rear deck: new steel cable railing and covered ceiling under deck. new rear siding and new garage door.Details
revision to 202010176780. 2nd fl: reconfigure master bath layout and new glass railing at interior stairs. rear deck: new steel cable railing and covered ceiling under deck. new rear siding and new garage door. | |
| Jul 19, 2022 | Completed final sign-off Jul 2023 | 1902 18th Av | relocate (e) kitchen, bathroom. convert (e) kitchen space to bedroom. remodel 2 bathroom & replace (e) sheet rock w/ new. all work at ground floor (unit 1902 18th ave).Details
relocate (e) kitchen, bathroom. convert (e) kitchen space to bedroom. remodel 2 bathroom & replace (e) sheet rock w/ new. all work at ground floor (unit 1902 18th ave). | $86,000 |
| Jun 13, 2022 | Completed final sign-off Jul 2023 | 379 27th Av | revision to pa# 202112073897 including revision to floor layout of bathrooms. minor revision to foundation, 2nd & 3rd floor framing.Details
revision to pa# 202112073897 including revision to floor layout of bathrooms. minor revision to foundation, 2nd & 3rd floor framing. | $1,000 |
| May 26, 2022 | Completed final sign-off Apr 2025 | 875 36th Av | interior remodel to (e) 3-story, 2-family dwelling. kitchen and bath remodel to 2nd & 3rd floors. new bathroom to 2nd & 3rd floor units. adu under separate pa#202205265050.Details
interior remodel to (e) 3-story, 2-family dwelling. kitchen and bath remodel to 2nd & 3rd floors. new bathroom to 2nd & 3rd floor units. adu under separate pa#202205265050. | $128,108 |
| Jan 13, 2022 | Completed final sign-off Dec 2022 | 65 Delano Av | 1/f: replace (e) foundation, new bathroom, relocate washer/dryer, water heater/furnace. replace garage door at rear side of building. 2/f: new deck and stairway to rear yard. new bathroom at kitchen, reconfigure (e) bathroom as per plan.Details
1/f: replace (e) foundation, new bathroom, relocate washer/dryer, water heater/furnace. replace garage door at rear side of building. 2/f: new deck and stairway to rear yard. new bathroom at kitchen, reconfigure (e) bathroom as per plan. | $46,000 |
| Dec 7, 2021 | Completed final sign-off Jul 2023 | 379 27th Av | remodel of (e) bldg including removal of (e) lath & plaster, install insulation, refinish wall & ceiling. remodel all (e) kitchen & bathrooms. convert (e) storage in ground floor into living space including a family room, a full bathroom and a new kitchen with 2-burner stoveDetails
remodel of (e) bldg including removal of (e) lath & plaster, install insulation, refinish wall & ceiling. remodel all (e) kitchen & bathrooms. convert (e) storage in ground floor into living space including a family room, a full bathroom and a new kitchen with 2-burner stove | $250,000 |
| Sep 3, 2021 | Completed final sign-off Sep 2025 | 467 Pennsylvania Av | 1st floor: remodel family room and bedroom. add bedroom, 2 bath, wet bar, relocated washer and dryer. 2nd floor: relocated kitchen, dining, living room, bath, bedrooms and interior stair. add one bath and 4 skylights. replace all windows side and rear with vinyl windows. no work to front facade.Details
1st floor: remodel family room and bedroom. add bedroom, 2 bath, wet bar, relocated washer and dryer. 2nd floor: relocated kitchen, dining, living room, bath, bedrooms and interior stair. add one bath and 4 skylights. replace all windows side and rear with vinyl windows. no work to front facade. | $120,000 |
| Nov 6, 2020 | Completed final sign-off Jul 2022 | 148 Chilton Av | revision to pa# 202001081475. infill window at 1/fl master bathroom and relocate plumbing fixtures at master bathroom. enlarge laundry area at 1/fl. infill window at 2/f office. relocate windows on 2/f kitchen and dining area.relocate rear wooden steps at deck (n) vaulted ceiling and skylight on 2/fDetails
revision to pa# 202001081475. infill window at 1/fl master bathroom and relocate plumbing fixtures at master bathroom. enlarge laundry area at 1/fl. infill window at 2/f office. relocate windows on 2/f kitchen and dining area.relocate rear wooden steps at deck (n) vaulted ceiling and skylight on 2/f | |
| Oct 28, 2020 | Completed final sign-off May 2021 | 172 Funston Av | revision to bpa# 201811156020 - 3/f: reconfigure 2 bathrooms and closet per planDetails
revision to bpa# 201811156020 - 3/f: reconfigure 2 bathrooms and closet per plan | |
| Oct 17, 2020 | Completed final sign-off Dec 2022 | 421 Point Lobos Av | 1/f: add 1 bedroom, play room, office and 2.5 bathrooms. 2/f: remodel (e) kitchen, bedrooms and bath, add 1 full bath. replace all windows with in-kind. relocate interior stairscase. infill light well.Details
1/f: add 1 bedroom, play room, office and 2.5 bathrooms. 2/f: remodel (e) kitchen, bedrooms and bath, add 1 full bath. replace all windows with in-kind. relocate interior stairscase. infill light well. | $65,000 |
| Sep 1, 2020 | Completed final sign-off Oct 2022 | 421 Point Lobos Av | remodel kitchen & 1 bathroom.Details
remodel kitchen & 1 bathroom. | $20,000 |
| Jun 29, 2020 | Completed final sign-off Mar 2021 | 2062 47th Av | 1st fl. remodel baths add 1 bedroom and office, 2nd fl. remodel bathroom, add 1 full bath, reconfigure interior stairsDetails
1st fl. remodel baths add 1 bedroom and office, 2nd fl. remodel bathroom, add 1 full bath, reconfigure interior stairs | $65,000 |
| Feb 27, 2020 | Completed final sign-off Mar 2022 | 1040 Treat Av | 1/f: add 2 bedrooms, 2 full baths, and family room; 2/f: remodel kitchen and bath, add (1) full bath, add roof deck, reconfigure interior stairs, new patio at rear, replace front windows in-kind with aluminum-wood clad.Details
1/f: add 2 bedrooms, 2 full baths, and family room; 2/f: remodel kitchen and bath, add (1) full bath, add roof deck, reconfigure interior stairs, new patio at rear, replace front windows in-kind with aluminum-wood clad. | $95,000 |
| Oct 24, 2019 | Completed final sign-off Aug 2020 | 1900 18th Av | 2nd floor: remodel kitchen and bath, add 1 full bath. infill center patio. add exterior stairs at rear.Details
2nd floor: remodel kitchen and bath, add 1 full bath. infill center patio. add exterior stairs at rear. | $50,000 |
| Sep 6, 2019 | Expired or cancelled expired Nov 2019 | 32 15th Av | kitchen and bath remodel, no wall removal.Details
kitchen and bath remodel, no wall removal. | $18,000 |
| Jun 25, 2019 | Completed final sign-off Aug 2020 | 4824 Geary Bl | interior renovation: 2nd fl - convert the (e) laundy into office. reconfigure (e) bath. relocate laundry room. remove wall between kitchen & living room. add a storage. 3rd fl - add one 3-fixture bathroom.Details
interior renovation: 2nd fl - convert the (e) laundy into office. reconfigure (e) bath. relocate laundry room. remove wall between kitchen & living room. add a storage. 3rd fl - add one 3-fixture bathroom. | $40,000 |
| Apr 30, 2019 | Completed final sign-off Aug 2020 | 4824 Geary Bl | remodel kitchen & bathroom. and paint. (residential)Details
remodel kitchen & bathroom. and paint. (residential) | $18,000 |
| Feb 11, 2019 | Completed final sign-off Sep 2019 | 2509 Irving St | interior remodle only: remodel existing kitchen, reconfigure bathroom to add new laundry. relocate and replace water heater.Details
interior remodle only: remodel existing kitchen, reconfigure bathroom to add new laundry. relocate and replace water heater. | $15,000 |
| Feb 7, 2019 | Completed final sign-off Mar 2019 | 11 Carpenter Ct | fixe bathroom tile from water leaking replace kitchen cabinet door & change to new counter topDetails
fixe bathroom tile from water leaking replace kitchen cabinet door & change to new counter top | $5,000 |
| Jan 9, 2019 | Completed final sign-off Apr 2019 | 205 07th Av | fix bathroom tiles, water leak. repair kitchen cabinets doors.Details
fix bathroom tiles, water leak. repair kitchen cabinets doors. | $2,500 |
| Jan 4, 2019 | Completed final sign-off Dec 2019 | 1374 28th Av | 2/f: relocate (e) kitchen & bedroom. add a mater bathroom per plans on 2/f.Details
2/f: relocate (e) kitchen & bedroom. add a mater bathroom per plans on 2/f. | $40,000 |
| Jan 3, 2019 | Completed final sign-off Dec 2019 | 635 42nd Av | 1/f: add 2 bedrooms, 2 full bathroom, family room with wet bar, office and laundry, new interior stairs and new deck at rear. 2nd floor: remodel kitchen and bathroom. add 1 full bathr new roof deck.Details
1/f: add 2 bedrooms, 2 full bathroom, family room with wet bar, office and laundry, new interior stairs and new deck at rear. 2nd floor: remodel kitchen and bathroom. add 1 full bathr new roof deck. | $120,000 |
| Dec 5, 2018 | Completed final sign-off Dec 2019 | 635 42nd Av | comply with nov 201807261 take out existing ceiling sheetrock & wall sheetrock 600 sf feet . remove existing ducting install hydronic heating. kitchen and bathroom remodel @ 2nd floor. in kind.Details
comply with nov 201807261 take out existing ceiling sheetrock & wall sheetrock 600 sf feet . remove existing ducting install hydronic heating. kitchen and bathroom remodel @ 2nd floor. in kind. | $9,500 |
| Nov 15, 2018 | Completed final sign-off May 2021 | 172 Funston Av | 3rd floor: remodel bath and add 1 bathDetails
3rd floor: remodel bath and add 1 bath | $20,000 |
| Nov 6, 2018 | Completed final sign-off Jul 2019 | 2350 30th Av | 1st fl: infill at rear. add 2 bedrooms, family room, and 1 full bath. 2nd fl: remodel kitchen & bath. add 1 full bath.Details
1st fl: infill at rear. add 2 bedrooms, family room, and 1 full bath. 2nd fl: remodel kitchen & bath. add 1 full bath. | $95,000 |
| Sep 20, 2018 | Completed final sign-off Jul 2019 | 2486 40th Av | 1st floor: add one family room, one bedroom, relocation of bathroom and add spiral stair to upper floor. 2nd floor: add one full bath, relocation of kitchen and spiral stair to 1st floor. add storage room to first floor; change (e) garage door.Details
1st floor: add one family room, one bedroom, relocation of bathroom and add spiral stair to upper floor. 2nd floor: add one full bath, relocation of kitchen and spiral stair to 1st floor. add storage room to first floor; change (e) garage door. | $98,000 |
| Aug 24, 2018 | Completed final sign-off Nov 2018 | 63 Forest View Dr | interior remodel, add 2 bedrooms, 1 baths, interior stair and 1 storage at gr flDetails
interior remodel, add 2 bedrooms, 1 baths, interior stair and 1 storage at gr fl | $80,000 |
| Aug 15, 2018 | Completed final sign-off Nov 2018 | 1522 Howard St | unit 4: remodel kitchen and bathroom. upgrade the electrical panel.Details
unit 4: remodel kitchen and bathroom. upgrade the electrical panel. | $45,000 |
| Jul 31, 2018 | Completed final sign-off Aug 2020 | 439 Lakeshore Dr | 1st flr - add 1 bedrooms, 1.5 baths, family roomDetails
1st flr - add 1 bedrooms, 1.5 baths, family room | $65,000 |
| Jun 20, 2018 | Completed final sign-off Dec 2018 | 900 Grant Av | change of use from retail to limited restaurant, ti install new kitchen equipment, new finish, new plumbing. add ada bathroom.Details
change of use from retail to limited restaurant, ti install new kitchen equipment, new finish, new plumbing. add ada bathroom. | $90,000 |
| Mar 19, 2018 | Completed final sign-off Jun 2018 | 3838 26th St | kitchen & bathroom remodel, no shower pan. no alteration of wall, window and door.Details
kitchen & bathroom remodel, no shower pan. no alteration of wall, window and door. | $15,000 |
| Feb 15, 2018 | Completed final sign-off May 2019 | 1570 21st Av | 1)construct 2 bed room, 2 bath room and laundry room at ground floor. 2)construct one new bath room at 2nd floor.Details
1)construct 2 bed room, 2 bath room and laundry room at ground floor. 2)construct one new bath room at 2nd floor. | $48,000 |
| Jan 5, 2018 | Completed final sign-off Mar 2019 | 2542 42nd Av | remodel extg 2nd floor, add 720 sq ft living space on ground floor: new bedroom, bathroom, playroom, laundry, wet bar.Details
remodel extg 2nd floor, add 720 sq ft living space on ground floor: new bedroom, bathroom, playroom, laundry, wet bar. | $10,000 |
| Dec 26, 2017 | Completed final sign-off Jan 2020 | 746 45th Av | interior remodel: relocate a bath. adding two bathrooms. converting dining to bedroom at 2nd fl.Details
interior remodel: relocate a bath. adding two bathrooms. converting dining to bedroom at 2nd fl. | $20,000 |
| Oct 23, 2017 | Completed final sign-off Jan 2019 | 63 Forest View Dr | interior remodel: relocate 2 baths, adding a bath. convert dining room to bedroom at 2nd floorDetails
interior remodel: relocate 2 baths, adding a bath. convert dining room to bedroom at 2nd floor | $80,000 |
| Oct 17, 2017 | Completed final sign-off Mar 2018 | 4127 Ulloa St | 1st floor: infill at rear, add 2 bedrooms, 1 full bath, and family room. 2nd floor: remodel kitchen and bath, add 1 full bath, and new deck at rear. less than 75% existing interior walls demo.Details
1st floor: infill at rear, add 2 bedrooms, 1 full bath, and family room. 2nd floor: remodel kitchen and bath, add 1 full bath, and new deck at rear. less than 75% existing interior walls demo. | $75,000 |
| May 12, 2017 | Completed final sign-off Jul 2018 | 1271 Cayuga Av | interior remodel: adding (2) bedrooms, (2) bathrooms and storage at ground fl. adding (1) bathroom at second fl.Details
interior remodel: adding (2) bedrooms, (2) bathrooms and storage at ground fl. adding (1) bathroom at second fl. | $60,000 |
| Apr 7, 2017 | Completed final sign-off Jun 2017 | 1345 Sacramento St | remodeling kitchen and bathroom - replace exhaust fan.. upgrade the electrical subpanel. no changes to wall locations. all new lights shall be led. n/a maherDetails
remodeling kitchen and bathroom - replace exhaust fan.. upgrade the electrical subpanel. no changes to wall locations. all new lights shall be led. n/a maher | $15,000 |
| Apr 5, 2017 | Completed final sign-off Oct 2017 | 5930 California St | unit #4: remodel kitchen and bath, add 1 bath and relocate wall at front bedroom and living room. replace front 4 windows in kind with aluminum clad wood windows.Details
unit #4: remodel kitchen and bath, add 1 bath and relocate wall at front bedroom and living room. replace front 4 windows in kind with aluminum clad wood windows. | $30,000 |