Back to kitchen remodel contractors
D A M Construction(* Always *Ask For Id)
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Apr 2010
- Last 24 months
- 0 permits filed
27 permits since 2000: 15 completed, 6 never finaled, 6 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2008 | Completed final sign-off Sep 2011 | 540 Stockton St | unit #2 & #6 - 2 kitchen remodel. remodel & replace cabinets and plumbing fixtures. electrical wiring, sheetrocking. taping and painting. nov 200564008-ces.Details
unit #2 & #6 - 2 kitchen remodel. remodel & replace cabinets and plumbing fixtures. electrical wiring, sheetrocking. taping and painting. nov 200564008-ces. | $22,650 |
| Feb 21, 2008 | Completed final sign-off Sep 2008 | 540 Stockton St | we are to remodel (e) kitchen-new cabinets, new tile, new flooring and one bathroom. replace old fixtures for new ones. all work in unit #3Details
we are to remodel (e) kitchen-new cabinets, new tile, new flooring and one bathroom. replace old fixtures for new ones. all work in unit #3 | $15,000 |
| Sep 11, 2007 | Never finaled issued Sep 2007, no final | 540 Stockton St | unit#8. remodel (e) kitchen, new cab. new top new floors (granite) new appliances. one new bathroom , new panel electrical box , sheet rock and paint.Details
unit#8. remodel (e) kitchen, new cab. new top new floors (granite) new appliances. one new bathroom , new panel electrical box , sheet rock and paint. | $15,000 |
| Aug 31, 2007 | Completed final sign-off Sep 2008 | 540 Stockton St | unit#7.comply with nov 200711940 dated on 7/10/2007. remodel kitchen and bathroom. remove partition wall per plans. new location for apartment and sub panel.Details
unit#7.comply with nov 200711940 dated on 7/10/2007. remodel kitchen and bathroom. remove partition wall per plans. new location for apartment and sub panel. | $15,000 |
| Sep 20, 2005 | Completed final sign-off Dec 2005 | 1600 Funston Av | replace sheetrock in kitchen and bath with new cabinets and fixturesDetails
replace sheetrock in kitchen and bath with new cabinets and fixtures | $7,000 |
| Apr 10, 2003 | Completed final sign-off Jun 2003 | 1131 Gilman Av | shower tub,replace kitchen cab,repair crack in walls.prime @ paint.replace some steps on entranceDetails
shower tub,replace kitchen cab,repair crack in walls.prime @ paint.replace some steps on entrance | $8,310 |