D & A Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to May 2025
- Last 24 months
- 3 permits filed
30 permits since 2000: 24 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 191 days from filing to permit and 363 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2020 | Completed final sign-off Aug 2023 | 1343 Taraval St | revision to #2018.0509.8696 & 2018.0509.8711. to eliminate elevator which connects each floor. re-configure bedroom & kitchen layout @ the area where residential elevator to be eliminated. add bedroom on 4th floor. detail no change & shall follow previous pa #2018.0509.8696 & 2018.0509.8711.Details
revision to #2018.0509.8696 & 2018.0509.8711. to eliminate elevator which connects each floor. re-configure bedroom & kitchen layout @ the area where residential elevator to be eliminated. add bedroom on 4th floor. detail no change & shall follow previous pa #2018.0509.8696 & 2018.0509.8711. | |
| Feb 23, 2011 | Completed final sign-off Feb 2012 | 33 26th Av | remodel kitchen, fam room, new int.circular stair, new master bath, new bathroom, new powder rm at 2nd fl. replace int. doors, windows, hand rail at entry, upgrade heating unit. no addition of living space or change to bldg envelopeDetails
remodel kitchen, fam room, new int.circular stair, new master bath, new bathroom, new powder rm at 2nd fl. replace int. doors, windows, hand rail at entry, upgrade heating unit. no addition of living space or change to bldg envelope | $240,000 |
| Aug 17, 2010 | Completed final sign-off Feb 2012 | 937 Geary St | comply with nov 201054336 dated 7/28/10. relocate front entry door, new 4' guardrail to basement, new kitchen wall partition, new cabinets, and countertop, remove stair.Details
comply with nov 201054336 dated 7/28/10. relocate front entry door, new 4' guardrail to basement, new kitchen wall partition, new cabinets, and countertop, remove stair. | $1,500 |