D & A Builders Inc

Contractor license
900258
State license record
Based in
San Francisco
On San Francisco permits
Dec 2009 to May 2025
Last 24 months
3 permits filed

30 permits since 2000: 24 completed, 1 never finaled, 5 expired or cancelled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllStairs 7Kitchen remodel 3Bathroom remodel 5

3 kitchen remodel permits: 3 completed. Typically 191 days from filing to permit and 363 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 2, 2020Completed
final sign-off Aug 2023
1343 Taraval Strevision to #2018.0509.8696 & 2018.0509.8711. to eliminate elevator which connects each floor. re-configure bedroom & kitchen layout @ the area where residential elevator to be eliminated. add bedroom on 4th floor. detail no change & shall follow previous pa #2018.0509.8696 & 2018.0509.8711.
Details
Permit
202012020045
Status
complete
Filed
Dec 2, 2020
Permit issued
Jul 26, 2021
Final sign-off
Aug 25, 2023
Address
1343 Taraval St

revision to #2018.0509.8696 & 2018.0509.8711. to eliminate elevator which connects each floor. re-configure bedroom & kitchen layout @ the area where residential elevator to be eliminated. add bedroom on 4th floor. detail no change & shall follow previous pa #2018.0509.8696 & 2018.0509.8711.

Open the permit page

Feb 23, 2011Completed
final sign-off Feb 2012
33 26th Avremodel kitchen, fam room, new int.circular stair, new master bath, new bathroom, new powder rm at 2nd fl. replace int. doors, windows, hand rail at entry, upgrade heating unit. no addition of living space or change to bldg envelope
Details
Permit
201102230808
Status
complete
Filed
Feb 23, 2011
Permit issued
Feb 24, 2011
Final sign-off
Feb 22, 2012
Declared cost
$240,000
Address
33 26th Av

remodel kitchen, fam room, new int.circular stair, new master bath, new bathroom, new powder rm at 2nd fl. replace int. doors, windows, hand rail at entry, upgrade heating unit. no addition of living space or change to bldg envelope

Open the permit page

$240,000
Aug 17, 2010Completed
final sign-off Feb 2012
937 Geary Stcomply with nov 201054336 dated 7/28/10. relocate front entry door, new 4' guardrail to basement, new kitchen wall partition, new cabinets, and countertop, remove stair.
Details
Permit
201008178958
Status
complete
Filed
Aug 17, 2010
Permit issued
Feb 24, 2011
Final sign-off
Feb 10, 2012
Declared cost
$1,500
Address
937 Geary St

comply with nov 201054336 dated 7/28/10. relocate front entry door, new 4' guardrail to basement, new kitchen wall partition, new cabinets, and countertop, remove stair.

Open the permit page

$1,500