Back to kitchen remodel contractors
Cynthia G Cotter
- Based in
- San Rafael
- On San Francisco permits
- Jul 2008 to Aug 2013
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 10, 2012 | Completed final sign-off Feb 2013 | 461 02nd St | remodel kitchen, new cabinets, counter tops, appliances 50% kitchen lighting will be high efficiency, electrical panel update, 2 bathrms, new vanity, sink, faucet, toilet, lighting with occupancy sensors, remodel existing showers, new bath fans to connect to (e) ductsDetails
remodel kitchen, new cabinets, counter tops, appliances 50% kitchen lighting will be high efficiency, electrical panel update, 2 bathrms, new vanity, sink, faucet, toilet, lighting with occupancy sensors, remodel existing showers, new bath fans to connect to (e) ducts | $54,050 |
| Feb 8, 2011 | Completed final sign-off Jan 2014 | 2090 Pacific Av | unit # 702: rewiring kitchen; new cabinets, new appliances, counter tops; no structural work; at least 50% high efficacy lighting (by wattage). no change to exhaust system.Details
unit # 702: rewiring kitchen; new cabinets, new appliances, counter tops; no structural work; at least 50% high efficacy lighting (by wattage). no change to exhaust system. | $38,600 |
| Jul 17, 2008 | Completed final sign-off Mar 2009 | 1958 Vallejo St | in unit #5, remodel kitchen and 4 bathroom. remove partition walls in kitchen. remove door and patch walls in bathroom #2. new fixtures in bathrooms. install new lights in kchn. closing closet walls in bedroom closet #2. new lighting in kchn and hall and new outletsDetails
in unit #5, remodel kitchen and 4 bathroom. remove partition walls in kitchen. remove door and patch walls in bathroom #2. new fixtures in bathrooms. install new lights in kchn. closing closet walls in bedroom closet #2. new lighting in kchn and hall and new outlets | $35,850 |