Cutrufelli Construction Co.
- Based in
- Novato
- On San Francisco permits
- Jul 2000 to Jun 2006
- Last 24 months
- 0 permits filed
22 permits since 2000: 11 completed, 4 never finaled, 7 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2001 | Completed final sign-off Jun 2002 | 437 Douglass St | applied for a vairance to install a piral staircase to connect 2 decksDetails
applied for a vairance to install a piral staircase to connect 2 decks | $10,000 |
| Jan 16, 2001 | Expired or cancelled expired Apr 2002 | 437 Douglass St | add new retaining wall stairs railing in rear yard add to existing to reinforce existing wallDetails
add new retaining wall stairs railing in rear yard add to existing to reinforce existing wall | $15,000 |
| Aug 24, 2000 | Completed final sign-off Aug 2001 | 433 Douglass St | 1.revised foundation plans 2. revised stair interior bata design (revisions to pa 2000/07/076/4604 9Details
1.revised foundation plans 2. revised stair interior bata design (revisions to pa 2000/07/076/4604 9 |