Back to bathroom remodel contractors
Custom Construction Enterprises
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Sep 2026
- Last 24 months
- 15 permits filed
159 permits since 2000: 138 completed, 8 in progress, 3 never finaled, 10 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 41 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 11 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2025 | In progress issued Dec 2025 | 650 Laguna Honda Bl | 1st fl: add new laundry closet, remodel existing bathroom. 2nd fl remove wall between rear bedroom and kitchen to create a dining/kitchen area. relocate existing window on south facade. remodel kitchen; remodel existing bathroom. 3rd fl: remodel existing bathroom,Details
1st fl: add new laundry closet, remodel existing bathroom. 2nd fl remove wall between rear bedroom and kitchen to create a dining/kitchen area. relocate existing window on south facade. remodel kitchen; remodel existing bathroom. 3rd fl: remodel existing bathroom, | $110,000 |
| Jul 23, 2025 | In progress issued Nov 2025 | 814 Grove St | partial foundation replacement;legalizing an unauthorized dwelling unit (udu) on the g/f into adu (1 bed/1 bath) using the state adu program;replace (e) unpermitted rear yard deck and stair w/ (n) conforming structures;widen driveway and garage door;rebuilding the (e) dry-rotted exterior wood entryDetails
partial foundation replacement;legalizing an unauthorized dwelling unit (udu) on the g/f into adu (1 bed/1 bath) using the state adu program;replace (e) unpermitted rear yard deck and stair w/ (n) conforming structures;widen driveway and garage door;rebuilding the (e) dry-rotted exterior wood entry | $400,000 |
| Mar 19, 2025 | Completed final sign-off Jul 2025 | 441 Teresita Bl | rev to bpa#2022-0815-0549: modifications to basement and 1st/fl: bath layout revised, fireplace omitted, stairs revised, garage/residence door omitted, framing/foundation revision based on existing site conditions.Details
rev to bpa#2022-0815-0549: modifications to basement and 1st/fl: bath layout revised, fireplace omitted, stairs revised, garage/residence door omitted, framing/foundation revision based on existing site conditions. | |
| Apr 24, 2024 | Completed final sign-off Jun 2025 | 55 Loraine Ct | interior remodel w/ fl reconfiguraton at both lvls. replace windows, n) electrical, appliances & fixtures. voluntary seismic upgrade of lower lvl. no work in public row, convert lvl 1 study to bedroom, expand e) bath,expansion of 495 sf within bldg envelope.mamorialize rooms down at ground level 938Details
interior remodel w/ fl reconfiguraton at both lvls. replace windows, n) electrical, appliances & fixtures. voluntary seismic upgrade of lower lvl. no work in public row, convert lvl 1 study to bedroom, expand e) bath,expansion of 495 sf within bldg envelope.mamorialize rooms down at ground level 938 | $345,000 |
| Feb 12, 2024 | Completed final sign-off May 2025 | 55 Loraine Ct | in-kind downtstairs bathroom remodel, out to studs. new electrical, new plumbing and new tile.Details
in-kind downtstairs bathroom remodel, out to studs. new electrical, new plumbing and new tile. | $20,000 |
| Oct 13, 2023 | Completed final sign-off Dec 2025 | 531 06th Av | three story horizontal addition on rear of bldg. add a new adu at ground floor facing rear yard under state program. remodel (e) kitchens & bathrooms at 2nd & 3rd floors. add new bathrooms at 2nd flr & 3rd flrs. replacing (e) furnaces & water heaters.Details
three story horizontal addition on rear of bldg. add a new adu at ground floor facing rear yard under state program. remodel (e) kitchens & bathrooms at 2nd & 3rd floors. add new bathrooms at 2nd flr & 3rd flrs. replacing (e) furnaces & water heaters. | $1,000,000 |
| Nov 10, 2022 | Completed final sign-off Dec 2023 | 61 Garcia Av | convert basement storage to living area. partial foundation replacement for lowered slab in basement. new bathroom and bedroom.Details
convert basement storage to living area. partial foundation replacement for lowered slab in basement. new bathroom and bedroom. | $320,000 |
| Aug 15, 2022 | Completed final sign-off Jul 2025 | 441 Teresita Bl | adding a 1-story addition with a roof deck to rear of (e) house. new space will contain an office & half bath. new interior stairs to connect new space to yard. new exterior stair for acces from new spaces to rear yard. existing bath on 2/f if reconfgured.Details
adding a 1-story addition with a roof deck to rear of (e) house. new space will contain an office & half bath. new interior stairs to connect new space to yard. new exterior stair for acces from new spaces to rear yard. existing bath on 2/f if reconfgured. | $140,000 |
| Oct 27, 2021 | Completed final sign-off Oct 2021 | 350 Claremont Bl | revision to 202003036030. permit desctiption did not included "3rd bath @ 3rd fl", but scope was included in approved plans. req by inspector to close permit.Details
revision to 202003036030. permit desctiption did not included "3rd bath @ 3rd fl", but scope was included in approved plans. req by inspector to close permit. | |
| Apr 8, 2021 | Completed final sign-off Oct 2022 | 53 Clifford Tr | foundation replacement, new roooms, bathroom down, new stairs 1st to 2nd flr. soft story upgrade.Details
foundation replacement, new roooms, bathroom down, new stairs 1st to 2nd flr. soft story upgrade. | $375,000 |
| Nov 13, 2020 | Completed final sign-off Apr 2022 | 220 San Leandro Wy | basement: (n) living room, bedroom, full bath, powder, laundry & media room. (n) interior stairs to connect 1st fl to basement. add (n) shower to 1st fl bathroom. (n) window openings on north & south facade. widen garage. replace windows at front with wood.Details
basement: (n) living room, bedroom, full bath, powder, laundry & media room. (n) interior stairs to connect 1st fl to basement. add (n) shower to 1st fl bathroom. (n) window openings on north & south facade. widen garage. replace windows at front with wood. | $175,000 |
| Aug 24, 2020 | Completed final sign-off Feb 2021 | 354 Highland Av | bathroom remodel. demo existing finishes & install new finishes + tile, in-kindDetails
bathroom remodel. demo existing finishes & install new finishes + tile, in-kind | $28,000 |
| Jun 30, 2020 | Completed final sign-off Sep 2021 | 33 Stoneman St | interior remodel to extg basement, extg bath & extg laundry. interior only. remodel to extg kitchen/powder/office & new rear windows/doors on extg 1st floor. remodel extg master bath/closet, add new bath, vault ceilings in extg roof, nw rear doors on extg 2nd floor. exterior work:Details
interior remodel to extg basement, extg bath & extg laundry. interior only. remodel to extg kitchen/powder/office & new rear windows/doors on extg 1st floor. remodel extg master bath/closet, add new bath, vault ceilings in extg roof, nw rear doors on extg 2nd floor. exterior work: | $330,000 |
| Mar 3, 2020 | Completed final sign-off Oct 2021 | 350 Claremont Bl | 1 new bath, new drywall in living room, new skylights, all window replacement in kind w wood clad finishesDetails
1 new bath, new drywall in living room, new skylights, all window replacement in kind w wood clad finishes | $50,000 |
| Feb 21, 2020 | Completed final sign-off Jan 2021 | 2504 Pacific Av | interior remodel - renovation of ground fl rooms including expansion of garage & remodel of (e) bathroom, laundry & family room. replacement windows in (e) openings & 2 (n) windows in rear yardDetails
interior remodel - renovation of ground fl rooms including expansion of garage & remodel of (e) bathroom, laundry & family room. replacement windows in (e) openings & 2 (n) windows in rear yard | $300,000 |
| Dec 12, 2019 | Completed final sign-off Oct 2024 | 61 Parker Av | new 3 story rear yard addition & interior remodel.1st fl: new bedroom, 2 baths, laundry room, living room, mud room, new interior stairs. 2nd fl: new kitchen, powder room, dining room, roar porch & stairs. 3rd fl: remodel (e) master bedroom, new master bathroom, hall bathroom, new office. 2 bedroomsDetails
new 3 story rear yard addition & interior remodel.1st fl: new bedroom, 2 baths, laundry room, living room, mud room, new interior stairs. 2nd fl: new kitchen, powder room, dining room, roar porch & stairs. 3rd fl: remodel (e) master bedroom, new master bathroom, hall bathroom, new office. 2 bedrooms | $650,000 |
| Jun 21, 2019 | Completed final sign-off Jul 2020 | 549 Union St | all work at 2nd fl level, unit 549: renovate kitchen & bathroom, add new bathroom. new furnace & water heater. no fire alarm system in building. now sprinkler system on 2nd floor.Details
all work at 2nd fl level, unit 549: renovate kitchen & bathroom, add new bathroom. new furnace & water heater. no fire alarm system in building. now sprinkler system on 2nd floor. | $75,000 |
| Jun 6, 2019 | Completed final sign-off Mar 2021 | 1777 16th Av | interior alterations- kitchen and bathroom. window replacements, new laundry room. ele/plm upgrades in areas altered. new 1st flr bathroomDetails
interior alterations- kitchen and bathroom. window replacements, new laundry room. ele/plm upgrades in areas altered. new 1st flr bathroom | $95,000 |
| Jun 4, 2019 | Completed final sign-off Aug 2019 | 718 Joost Av | add int stair to connect (e) conditioned space @ 1st & 2nd levels. seal ext door at lower level from int side only. excavate @ crawl space to add tub to (e) bath @ lower levelDetails
add int stair to connect (e) conditioned space @ 1st & 2nd levels. seal ext door at lower level from int side only. excavate @ crawl space to add tub to (e) bath @ lower level | $18,000 |
| Mar 25, 2019 | Completed final sign-off Mar 2020 | 551 Union St | all work at unit 551 (3rd flr) renovate kitchen and bathroom. add new bathroom, new furnance and w/hDetails
all work at unit 551 (3rd flr) renovate kitchen and bathroom. add new bathroom, new furnance and w/h | $58,000 |
| Feb 25, 2019 | Completed final sign-off Sep 2019 | 807 Faxon Av | remodel kitchen and bath, move half-flight internal stairway replace back yard stairsDetails
remodel kitchen and bath, move half-flight internal stairway replace back yard stairs | $250,000 |
| Sep 20, 2018 | Completed final sign-off Aug 2019 | 337 Teresita Bl | remodel to extg residential. addition of new bedroom in crawl space under house addition of powder room on main floor, addition of bathroom on 3rd floor. new deck in rear yard, new bay projection in rear yard. remodel of other spaces and window modification per scope.Details
remodel to extg residential. addition of new bedroom in crawl space under house addition of powder room on main floor, addition of bathroom on 3rd floor. new deck in rear yard, new bay projection in rear yard. remodel of other spaces and window modification per scope. | $625,000 |
| May 4, 2018 | Completed final sign-off Oct 2018 | 39 Rossmoor Dr | level one-convert 147sf of storage space into office, new electrical in office, level two remodel kitchen, and 1 bathroom, new electrical in these areas, level three- remodel 2 bathrooms and add washer & dryer in master bedroom closet, new electrical in the areasDetails
level one-convert 147sf of storage space into office, new electrical in office, level two remodel kitchen, and 1 bathroom, new electrical in these areas, level three- remodel 2 bathrooms and add washer & dryer in master bedroom closet, new electrical in the areas | $185,000 |
| Jan 18, 2018 | Completed final sign-off Jul 2020 | 547 Union St | to comply witn nov 201831271 - all work @ unit 547 - convert (e) basement to living space with new bath, media, office, laundry, new interior stair. relocate kitchen from 1st flo to basement. replace 3 through wall vents facing st with wood frame aluminum clad fixed windows. same size opening. addDetails
to comply witn nov 201831271 - all work @ unit 547 - convert (e) basement to living space with new bath, media, office, laundry, new interior stair. relocate kitchen from 1st flo to basement. replace 3 through wall vents facing st with wood frame aluminum clad fixed windows. same size opening. add | $141,000 |
| Sep 14, 2017 | Completed final sign-off May 2018 | 2209 Steiner St | interior renovation of 2 apartments at 2/f- renovate kitchen & bath, add new bath. at 3/f- relocate kitchen, renovate bath. replace 2 water heaters.Details
interior renovation of 2 apartments at 2/f- renovate kitchen & bath, add new bath. at 3/f- relocate kitchen, renovate bath. replace 2 water heaters. | $150,000 |
| May 31, 2017 | Completed final sign-off Nov 2017 | 1215 27th Av | interior remodel - remodel 2nd floor kitchen & bath. remodel 3rd floor - bath, master suite. exterior remodel - replace rear facade windwos, 2 new skylightsDetails
interior remodel - remodel 2nd floor kitchen & bath. remodel 3rd floor - bath, master suite. exterior remodel - replace rear facade windwos, 2 new skylights | $75,000 |
| Jun 21, 2016 | Completed final sign-off Jul 2017 | 47 Rosewood Dr | basement level: excavate front portion and add bedroom bathroom, & laundry room. level one:remodel kitchen and powder room, add new stair down to basement. level two: remodel three extg bathrooms, move closets. excavating 23 cubic yards 18" deep.Details
basement level: excavate front portion and add bedroom bathroom, & laundry room. level one:remodel kitchen and powder room, add new stair down to basement. level two: remodel three extg bathrooms, move closets. excavating 23 cubic yards 18" deep. | $320,000 |
| Feb 19, 2016 | Completed final sign-off Oct 2016 | 71 Germania St | lower existing slab & add living space @ existing basement: new office, new full bath, new laundry closet, new stair, new foundation as necessary. remodel (e) 2nd floor bath. replace windows on rear facade, new radiant heat system.Details
lower existing slab & add living space @ existing basement: new office, new full bath, new laundry closet, new stair, new foundation as necessary. remodel (e) 2nd floor bath. replace windows on rear facade, new radiant heat system. | $110,000 |
| Feb 13, 2015 | Completed final sign-off Apr 2015 | 722 Central Av | to comply with physical inspection report cc-7562. item #8: return attic space to storage area only and remove bathroom plumbing and 2 walls. attic knee walls and flat ceiling to remain. skylights to remain.Details
to comply with physical inspection report cc-7562. item #8: return attic space to storage area only and remove bathroom plumbing and 2 walls. attic knee walls and flat ceiling to remain. skylights to remain. | $15,000 |
| Sep 23, 2014 | Completed final sign-off Jul 2015 | 10 Perine Pl | revsion to app#201403130622 - kitchen and bathroom remodel at units 10 & partial remodle of unit 12. n/a for the maher ordinance #155-13Details
revsion to app#201403130622 - kitchen and bathroom remodel at units 10 & partial remodle of unit 12. n/a for the maher ordinance #155-13 | $60,000 |
| May 1, 2014 | Never finaled issued May 2014, no final | 533 Noe St | renovation of existing single family house, renovate bathroom includes enclosing of (e) lightwell, not visible from adjacent properties, add a new bathroom at an (e) closet, enlarge (e) closet, new parapet adjacent to new skylight.Details
renovation of existing single family house, renovate bathroom includes enclosing of (e) lightwell, not visible from adjacent properties, add a new bathroom at an (e) closet, enlarge (e) closet, new parapet adjacent to new skylight. | $65,000 |
| Apr 21, 2014 | Completed final sign-off Sep 2014 | 1835 Franklin St | kitchen an 2 bathroom remodel plus laundry in existing closet in unit 1201. na for maher.Details
kitchen an 2 bathroom remodel plus laundry in existing closet in unit 1201. na for maher. | $95,000 |
| Apr 18, 2014 | Completed final sign-off Apr 2015 | 2550 Clay St | redo cabinets in kitchen, new appliances, add led lighting, new floor radiant floor in kitchen only. remodel bathroom at 2nd floor-new fixtures.Details
redo cabinets in kitchen, new appliances, add led lighting, new floor radiant floor in kitchen only. remodel bathroom at 2nd floor-new fixtures. | $30,000 |
| Mar 13, 2014 | Completed final sign-off Mar 2015 | 12 Perine Pl | kitchen and bathroom remodel at unit #12, install new 3'x5' skylight, partial foundation repair.Details
kitchen and bathroom remodel at unit #12, install new 3'x5' skylight, partial foundation repair. | $30,000 |
| Nov 27, 2013 | Completed final sign-off Apr 2014 | 1515 Lyon St | replace cabinets, fixtures & appliances in kitchen including lighting. replace fixtures & finishes in 2 bathrooms, lighting to comply with cec 150(k)Details
replace cabinets, fixtures & appliances in kitchen including lighting. replace fixtures & finishes in 2 bathrooms, lighting to comply with cec 150(k) | $27,320 |
| Oct 25, 2013 | Completed final sign-off Apr 2014 | 2666 35th Av | convert 770 sf of garage to conditioned space including a new master suite sitting room and laundry at the first floor. note: (e) family room and bathroom at 1st floor are unwarranted.Details
convert 770 sf of garage to conditioned space including a new master suite sitting room and laundry at the first floor. note: (e) family room and bathroom at 1st floor are unwarranted. | $94,000 |
| Dec 11, 2012 | Completed final sign-off Jan 2014 | 1750 10th Av | rooms down - alteration to (e) basement/around level storage rooms to create (n) bedroom & bathroom. creation of (n) enclosed stairway from (e) kitchen to (n) ground floor rooms. remodel of (e) kitchen & powder room.Details
rooms down - alteration to (e) basement/around level storage rooms to create (n) bedroom & bathroom. creation of (n) enclosed stairway from (e) kitchen to (n) ground floor rooms. remodel of (e) kitchen & powder room. | $200,000 |
| Jul 25, 2012 | Completed final sign-off Oct 2012 | 285 Hazelwood Av | bathroom remodel. no structural work. changing tub to showerDetails
bathroom remodel. no structural work. changing tub to shower | $18,500 |
| May 7, 2012 | Completed final sign-off Mar 2015 | 2888 Jackson St | interior remodel to (e) flat/apartment-new kitchen & new bathroom. 2 new skylightsDetails
interior remodel to (e) flat/apartment-new kitchen & new bathroom. 2 new skylights | $36,567 |
| Dec 7, 2011 | Completed final sign-off Dec 2012 | 572 Liberty St | new vertical addition at existing kitchen -no square footage added - updated kitchen with new powder room at main (2nd) level. updated bathroom with new windows at upper level. vertical addition will not add to overall height.Details
new vertical addition at existing kitchen -no square footage added - updated kitchen with new powder room at main (2nd) level. updated bathroom with new windows at upper level. vertical addition will not add to overall height. | $70,000 |
| Aug 12, 2011 | Completed final sign-off Feb 2012 | 231 Greenwich St | remodel of 1 kitchen and 1 bathroom at unit 2Details
remodel of 1 kitchen and 1 bathroom at unit 2 | $30,000 |
| Mar 21, 2011 | Expired or cancelled expired Jun 2015 | 1388 Chestnut St | add bathroom,renovate extg bathroom, convert 1/2 bath to laundry room, rplce 11 single pane windows with dual pane, rplce 1 single pane wndw with dual pane french door.(none on front facade). voluntary strengthening to include add'l anchor bolts and plywood sheating at garage, upgrade plmg & elecDetails
add bathroom,renovate extg bathroom, convert 1/2 bath to laundry room, rplce 11 single pane windows with dual pane, rplce 1 single pane wndw with dual pane french door.(none on front facade). voluntary strengthening to include add'l anchor bolts and plywood sheating at garage, upgrade plmg & elec | $30,000 |
| Jan 8, 2010 | Completed final sign-off Jun 2012 | 663 Arkansas St | revision to pa# 2008-0819-9544-addition of sump pump, sewage lifting station & full bathroom at basement level storage areaDetails
revision to pa# 2008-0819-9544-addition of sump pump, sewage lifting station & full bathroom at basement level storage area | $15,000 |
| Sep 17, 2009 | Completed final sign-off Nov 2010 | 1462 14th Av | adding bedroom & bathroom at first level under existing sunroom. (no change to building footprint).Details
adding bedroom & bathroom at first level under existing sunroom. (no change to building footprint). | $38,000 |
| Feb 20, 2009 | Completed final sign-off Apr 2010 | 1779 Sanchez St | 80 sq ft second level addition at rear of house, new master suite and bath at first level, new interior stair, new deck at rear of house & new roof deck over area of addition, additional interior renovations include remodel kitchen & bath and replace windows on front facade.Details
80 sq ft second level addition at rear of house, new master suite and bath at first level, new interior stair, new deck at rear of house & new roof deck over area of addition, additional interior renovations include remodel kitchen & bath and replace windows on front facade. | $200,000 |