Back to kitchen remodel contractors
Custom Concepts
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Dec 2020
- Last 24 months
- 0 permits filed
50 permits since 2000: 38 completed, 3 never finaled, 9 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 expired or cancelled. Typically 79 days from filing to permit and 319 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2020 | Completed final sign-off Jul 2022 | 1225 31st Av | voluntary seismic upgrade. add 2 bedroom, 2 baths, and laundry downstairs. remodel kitchen abd bath upstairs. replace plumbing & electrical. repair front stairs in kind.Details
voluntary seismic upgrade. add 2 bedroom, 2 baths, and laundry downstairs. remodel kitchen abd bath upstairs. replace plumbing & electrical. repair front stairs in kind. | $250,000 |
| Apr 7, 2015 | Completed final sign-off Mar 2016 | 1130 Taylor St | change cabinets and counter tops in kitchen in kind. insulate walls and ceiling. maintian 1-hour construction at area of work. min 50% wattage lighting high efficacyDetails
change cabinets and counter tops in kitchen in kind. insulate walls and ceiling. maintian 1-hour construction at area of work. min 50% wattage lighting high efficacy | $10,000 |
| Dec 26, 2013 | Completed final sign-off Jun 2014 | 1134 Taylor St | for minor dryrot and termite damage to siding, studs and plates. exterior work not street visible. in lightwell and kitchen areas. no winodwDetails
for minor dryrot and termite damage to siding, studs and plates. exterior work not street visible. in lightwell and kitchen areas. no winodw | $1,800 |
| Jul 22, 2013 | Completed final sign-off Jun 2014 | 1134 Taylor St | move kitchen to dining room, add toilet in bathroom & add sink to 1/4 bathrom, replace damage plaster replace with 5/8 sheetrock.Details
move kitchen to dining room, add toilet in bathroom & add sink to 1/4 bathrom, replace damage plaster replace with 5/8 sheetrock. | $25,000 |
| Nov 14, 2011 | Completed final sign-off Jun 2012 | 970 Chestnut St | work @ unit# 1 only. kitchen remodel & addition & add full bathroom & deck over basement.Details
work @ unit# 1 only. kitchen remodel & addition & add full bathroom & deck over basement. | $30,000 |
| Dec 27, 2006 | Completed final sign-off Nov 2008 | 517 45th Av | extend the sigle family building at rear side of building. extension will include a bedroom,2 baths on 2nd flr,remodel exist bath, kitchen/family rom and 1/2 bath on main floor, bedroom an d bath plus 1/2 bath on gr floor and entertainment roomDetails
extend the sigle family building at rear side of building. extension will include a bedroom,2 baths on 2nd flr,remodel exist bath, kitchen/family rom and 1/2 bath on main floor, bedroom an d bath plus 1/2 bath on gr floor and entertainment room | $500,000 |
| Oct 11, 2006 | Expired or cancelled expired Nov 2008 | 1630 25th Av | remodel upstairs and build out downstairs at rear of garage, 3 new baths, move kitchen downstairs. widen garage door at frontDetails
remodel upstairs and build out downstairs at rear of garage, 3 new baths, move kitchen downstairs. widen garage door at front | $200,000 |
| Jul 22, 2005 | Completed final sign-off Mar 2006 | 2127 29th Av | remodel kitchen and existing baths, add two bedrm and 2 baths, half bath 2nd flr, voluntary shearwalDetails
remodel kitchen and existing baths, add two bedrm and 2 baths, half bath 2nd flr, voluntary shearwal | $150,000 |
| Mar 28, 2003 | Completed final sign-off May 2004 | 2463 32nd Av | excavate floor at bedroom 2 for legal floor/ceiling hot, new deck, kitchen remodelDetails
excavate floor at bedroom 2 for legal floor/ceiling hot, new deck, kitchen remodel | $35,000 |
| Oct 1, 2002 | Expired or cancelled expired Mar 2010 | 1251 31st Av | rear addition to house.add 2 baths, 1 bedroom,remodel kitchen,extend hallway,add interior rear stairDetails
rear addition to house.add 2 baths, 1 bedroom,remodel kitchen,extend hallway,add interior rear stair | $100,000 |
| Jun 22, 2000 | Completed final sign-off Mar 2002 | 140 Point Lobos Av | rear addition to house and kitchen remodelDetails
rear addition to house and kitchen remodel | $100,000 |