Back to bathroom remodel contractors
Curran & Associates General Contractors
- Based in
- San Francisco
- On San Francisco permits
- Mar 2003 to Sep 2026
- Last 24 months
- 8 permits filed
226 permits since 2000: 137 completed, 8 in progress, 55 never finaled, 26 expired or cancelled.
Of the 55 never-finaled permits, 5 are 3 to 5 years old, 15 are 5 to 10 years old, 35 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 22 completed, 3 in progress, 6 never finaled, 7 expired or cancelled. Typically 1 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2026 | Completed final sign-off Jul 2026 | 387 Monterey Bl | to comply w/ nov# 202548639, items# 10, upgrade (e) bathroom, replace cabinet, fixtures, in-kind. no change to (e) layout or structural changes.Details
to comply w/ nov# 202548639, items# 10, upgrade (e) bathroom, replace cabinet, fixtures, in-kind. no change to (e) layout or structural changes. | $1,800 |
| Mar 10, 2025 | Completed final sign-off Apr 2025 | 627 Frederick St | in-kind remodeling of 2 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 2nd fl with 0 shower pan(s). | $35,000 |
| Dec 17, 2024 | In progress issued Aug 2025 | 80 Linares Av | raise (e) roof to increase ceiling height to 9'-0", thereby increasing the roof ridge line 7'-0" from (e), add (2) bedrooms, (1) bathroom & living space. replace all windows w/ alum-clad wood casement with mullionsDetails
raise (e) roof to increase ceiling height to 9'-0", thereby increasing the roof ridge line 7'-0" from (e), add (2) bedrooms, (1) bathroom & living space. replace all windows w/ alum-clad wood casement with mullions | $350,000 |
| Aug 19, 2024 | In progress issued Dec 2024 | 333 Valley St | repair/replace dryrot damage studs and ceiling joist in kind. less than 50% at rear crawl space. remodeling existing bathroom and closet on basement. replace windows and french door in same opening on basement floor.Details
repair/replace dryrot damage studs and ceiling joist in kind. less than 50% at rear crawl space. remodeling existing bathroom and closet on basement. replace windows and french door in same opening on basement floor. | $50,000 |
| Jan 26, 2024 | In progress issued Jul 2025 | 80 Entrada Ct | (unit a) new adu on ground fl (972 sqft), per ca gov code sec 65852.2. add 2 bedrooms, 2 bathrooms, living room & kitchen on (e) ground fl. install plywood wall reinforcement for voluntary ground fl structural strengthening. partial new foundation, reinforce & underpinning (e) footing.Details
(unit a) new adu on ground fl (972 sqft), per ca gov code sec 65852.2. add 2 bedrooms, 2 bathrooms, living room & kitchen on (e) ground fl. install plywood wall reinforcement for voluntary ground fl structural strengthening. partial new foundation, reinforce & underpinning (e) footing. | $100,000 |
| Mar 3, 2023 | Completed final sign-off May 2023 | 1996 Palou Av | to comply with nov# 202301576: to repair 2 rooms and one bathroom by installing r-15 batt insulation in wals, r-19 batt insulation in floor/ceiling and r-30 batt insulation attic/crawl spae. install 5/8; fire rate sheetrock on walls and ceilings, purple sheetrock at wet locations. windows will haveDetails
to comply with nov# 202301576: to repair 2 rooms and one bathroom by installing r-15 batt insulation in wals, r-19 batt insulation in floor/ceiling and r-30 batt insulation attic/crawl spae. install 5/8; fire rate sheetrock on walls and ceilings, purple sheetrock at wet locations. windows will have | $8,000 |
| Aug 19, 2022 | Never finaled issued Aug 2022, no final | 3400 Vicente St | interior remodel gr gl. remoel e bath and e family room. replace all bath fixtures, tile, cabinet at e location. add new lights, switches. no e walls to be removed or altered on this permit.Details
interior remodel gr gl. remoel e bath and e family room. replace all bath fixtures, tile, cabinet at e location. add new lights, switches. no e walls to be removed or altered on this permit. | $20,000 |
| Dec 2, 2021 | Expired or cancelled expired Jun 2024 | 1678 43rd Av | remove and replace sheetrock in 1st flr family room, living room and laundry room. provide 5/8" type x gyp in (e) garage. inkind remodel of 1 bathroom at 1st flr.Details
remove and replace sheetrock in 1st flr family room, living room and laundry room. provide 5/8" type x gyp in (e) garage. inkind remodel of 1 bathroom at 1st flr. | $7,000 |
| Jul 13, 2021 | Expired or cancelled expired May 2026 | 503 Congo St | 3/f addition for 1 bedroom & 1 bathroom. roof deck and green roof over front setback. kitchen remodel, opening kitchen wall to dining room. existing bathroom remodel on 2/f.Details
3/f addition for 1 bedroom & 1 bathroom. roof deck and green roof over front setback. kitchen remodel, opening kitchen wall to dining room. existing bathroom remodel on 2/f. | $100,000 |
| Nov 18, 2020 | Completed final sign-off Jun 2022 | 573 Pennsylvania Av | revision to pa 202002184746. remodel of lower unit. (n) windows and door at rear facade. new windows at south facade. interior remodel of kitchen, living room, bedroom and bath. addition of 1 bedroom.Details
revision to pa 202002184746. remodel of lower unit. (n) windows and door at rear facade. new windows at south facade. interior remodel of kitchen, living room, bedroom and bath. addition of 1 bedroom. | $47,550 |
| Feb 18, 2020 | Completed final sign-off Jun 2022 | 573 Pennsylvania Av | installation of roof deck, new rear yard access stair. new windows at rear facade, interior remodel including kitchen remodel, addition of on full bath and one half bath.Details
installation of roof deck, new rear yard access stair. new windows at rear facade, interior remodel including kitchen remodel, addition of on full bath and one half bath. | $120,000 |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 964 Howard St | interior room remodeling on 3 flrs. reframe entry door and add auto door opener to entry door. add (n) auto disable chair lift from entry to 1st flr and lobby. (n) stair at lobby. add new bathrooms.Details
interior room remodeling on 3 flrs. reframe entry door and add auto door opener to entry door. add (n) auto disable chair lift from entry to 1st flr and lobby. (n) stair at lobby. add new bathrooms. | $563,500 |
| Sep 4, 2018 | Never finaled issued Sep 2018, no final | 265 Corona St | add (n) bathroom and wet bar on 1st floor and remodel existing bathroom in same location on 2nd floor per plans. rear window @ bathroom (2nd floor) to be replaced (max u-factor .32) .Details
add (n) bathroom and wet bar on 1st floor and remodel existing bathroom in same location on 2nd floor per plans. rear window @ bathroom (2nd floor) to be replaced (max u-factor .32) . | $35,000 |
| Jun 27, 2017 | Completed final sign-off Aug 2018 | 2530 Fillmore St | kitchen & bathroom remodel (no structural work). demo kitchen & bathroom, replace all wall coverings, electrical & plumbing, no new service tie in to (e). same layout.Details
kitchen & bathroom remodel (no structural work). demo kitchen & bathroom, replace all wall coverings, electrical & plumbing, no new service tie in to (e). same layout. | $25,000 |
| Apr 5, 2017 | Completed final sign-off Jan 2020 | 174 Hearst Av | the proposal is to add a bedroom, bathroom, kitchen/dining area, open staircase & basement workroom by making a horizontal extension of 19 feet to the rear of the house. excavation of the basement will provide space for new storage/utility area.Details
the proposal is to add a bedroom, bathroom, kitchen/dining area, open staircase & basement workroom by making a horizontal extension of 19 feet to the rear of the house. excavation of the basement will provide space for new storage/utility area. | $250,000 |
| Feb 17, 2017 | Completed final sign-off Nov 2017 | 194 Valmar Tr | add master bedroom and bathroom on ground floor. remodel kitchen and bathroom on 2nd floor. replace extg dryrot windows with new aluminum wood clad window & patio door. new rear wood deck on 2nd floor. (height not to exceed 9'6")Details
add master bedroom and bathroom on ground floor. remodel kitchen and bathroom on 2nd floor. replace extg dryrot windows with new aluminum wood clad window & patio door. new rear wood deck on 2nd floor. (height not to exceed 9'6") | $80,000 |
| Dec 8, 2016 | Completed final sign-off Apr 2018 | 278 Chenery St | gr fl change storage on gr fl to 2 master bedrooms, 2 master bath. partial foundation replacementDetails
gr fl change storage on gr fl to 2 master bedrooms, 2 master bath. partial foundation replacement | $60,000 |
| Jan 13, 2016 | Never finaled issued Jan 2016, no final | 575 O'farrell St | #202- reinforce kitchen & bath walls, structural work only, (n) reinforce concrete 6" walls in kitchen & bath per plan. no light change, remodeling under seperate permit. n/a ordinance #155-13Details
#202- reinforce kitchen & bath walls, structural work only, (n) reinforce concrete 6" walls in kitchen & bath per plan. no light change, remodeling under seperate permit. n/a ordinance #155-13 | $60,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 4200 17th St | voluntary seismic improvements, expansion of mezzanine by 142 sf. 20% ada improvements - entry, unisex bathroom & stair. new exterior doors on douglass side.Details
voluntary seismic improvements, expansion of mezzanine by 142 sf. 20% ada improvements - entry, unisex bathroom & stair. new exterior doors on douglass side. | $130,000 |
| Mar 10, 2015 | Completed final sign-off Aug 2019 | 525 Grafton Av | infill sideyard @ (e) bldg's ground floor: add bedroom, bathroom, & garage. 2nd floor: add bathroo, bedroom & family room.Details
infill sideyard @ (e) bldg's ground floor: add bedroom, bathroom, & garage. 2nd floor: add bathroo, bedroom & family room. | $60,000 |
| Jan 9, 2015 | Never finaled issued Jan 2015, no final | 4204 17th St | unit 4204 only. replace existing cabinets, counters, sinks and faucets in bathroom and kitchen. replace toilet and shower in bath. new fixutres. new floors in bathroom and kitchen. paining in bath and kitchen. no structural work in bath and kitchenDetails
unit 4204 only. replace existing cabinets, counters, sinks and faucets in bathroom and kitchen. replace toilet and shower in bath. new fixutres. new floors in bathroom and kitchen. paining in bath and kitchen. no structural work in bath and kitchen | $25,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2015 | 1334 Van Ness Av | install ventilation, light fixtures in 6 bathrooms, 1 bathroom on floors 2, 3, 4, 5 & 6 & 1 bathroom in managers dpt. (2/f) to comply with nov #201492322 item 2. lighting shall be high efficacy & exhaust termination 3' from pl & openings into building to lightwell. n/a ordinance #155-13Details
install ventilation, light fixtures in 6 bathrooms, 1 bathroom on floors 2, 3, 4, 5 & 6 & 1 bathroom in managers dpt. (2/f) to comply with nov #201492322 item 2. lighting shall be high efficacy & exhaust termination 3' from pl & openings into building to lightwell. n/a ordinance #155-13 | $5,000 |
| Aug 25, 2011 | Completed final sign-off Aug 2012 | 2015 20th Av | proposed installing 2 bedroms, 2 bathrooms, laundry room & foundation repair at ground floor.Details
proposed installing 2 bedroms, 2 bathrooms, laundry room & foundation repair at ground floor. | $78,000 |
| Apr 28, 2011 | Completed final sign-off Aug 2011 | 4195 17th St | add a bathroom in the master bedroom on the 2nd floor. replace roof beam in the kitchen.Details
add a bathroom in the master bedroom on the 2nd floor. replace roof beam in the kitchen. | $15,000 |
| Jan 27, 2011 | Completed final sign-off Aug 2011 | 4195 17th St | upgrade existing kitchen and bathroom with new fixtures cabinets appliances counters and flooring, no structural workDetails
upgrade existing kitchen and bathroom with new fixtures cabinets appliances counters and flooring, no structural work | $60,000 |
| Nov 3, 2010 | Expired or cancelled expired Dec 2012 | 1590 Alemany Bl | add half bathroom to ground floor. half bath will be 6'6"x3'6"Details
add half bathroom to ground floor. half bath will be 6'6"x3'6" | $4,000 |
| Mar 16, 2010 | Completed final sign-off May 2010 | 832 Shrader St | replace (e) sink, countertop & cabinet in kitchen. replce (e) tub & stove valve in bathroom. install sub-panel in kitchen to bring additional power to unit. work on 3rd fl.complaint # 200876314 (his) for routine insp. patch sheetrock as necessary.Details
replace (e) sink, countertop & cabinet in kitchen. replce (e) tub & stove valve in bathroom. install sub-panel in kitchen to bring additional power to unit. work on 3rd fl.complaint # 200876314 (his) for routine insp. patch sheetrock as necessary. | $10,000 |
| Feb 18, 2010 | Completed final sign-off Dec 2010 | 112 Saturn St | 2 story addition to rear of existing house to include 2 bedrooms and 1 bathDetails
2 story addition to rear of existing house to include 2 bedrooms and 1 bath | $100,000 |
| Apr 2, 2009 | Completed final sign-off Oct 2010 | 90 Lagunitas Dr | adding bath into extg space on the ground floor. bath is 10'x6'. replace 6 extg wndw on ground floor.Details
adding bath into extg space on the ground floor. bath is 10'x6'. replace 6 extg wndw on ground floor. | $16,000 |
| Nov 6, 2008 | Completed final sign-off Feb 2009 | 1200 48th Av | add bedroom and bath on ground floor. remove post & reinforce beam on ground floor.Details
add bedroom and bath on ground floor. remove post & reinforce beam on ground floor. | $4,500 |
| Sep 4, 2008 | Completed final sign-off Jan 2009 | 859 31st Av | legalize & remodel 1 bedroom & 1 full bath; add 1 new bedroom & 1 full bath under (e) sunroom space on 1st floor. paint rooms & repalce windows on both floors at rear facade only, u factor <.67Details
legalize & remodel 1 bedroom & 1 full bath; add 1 new bedroom & 1 full bath under (e) sunroom space on 1st floor. paint rooms & repalce windows on both floors at rear facade only, u factor <.67 | $45,000 |
| Jan 8, 2008 | Completed final sign-off Mar 2009 | 526 Baker St | remodel kitchen and bathroom. relocate some non bearing partition walls (5) locations. all non-structural. eid compt #200560108 & #200453147.Details
remodel kitchen and bathroom. relocate some non bearing partition walls (5) locations. all non-structural. eid compt #200560108 & #200453147. | $60,000 |
| Oct 10, 2006 | Expired or cancelled expired Mar 2011 | 249 Chestnut St | new second floor with roof deck and bathroom. small addition to first floor kitchen.Details
new second floor with roof deck and bathroom. small addition to first floor kitchen. | $75,000 |
| Feb 7, 2005 | Expired or cancelled expired Aug 2017 | 366 Point Lobos Av | 175 sf study on ground floor, 50 sf bathroom on ground floorDetails
175 sf study on ground floor, 50 sf bathroom on ground floor | $20,000 |
| Jan 27, 2005 | Completed final sign-off Jan 2009 | 899 27th Av | coverting and addition to (e) single family residence.1st/fl-2 bedroom, bath &family room. 2nd/fl- 2 bedrooms, study, 2 bath. kitchen dining room living room. 3rd/fl-master bedroom, 1 bath.Details
coverting and addition to (e) single family residence.1st/fl-2 bedroom, bath &family room. 2nd/fl- 2 bedrooms, study, 2 bath. kitchen dining room living room. 3rd/fl-master bedroom, 1 bath. | $300,000 |
| Jan 10, 2005 | Expired or cancelled expired Dec 2007 | 148 Idora Av | revision to permit app 200106010524 to revise closet into a bathroom on top floorDetails
revision to permit app 200106010524 to revise closet into a bathroom on top floor | $10,000 |
| Jul 20, 2004 | Completed final sign-off Apr 2005 | 640 Castro St | demo, frame new walls & ceiling, create (n) bath out of (e) office on 2nd flr, relocate door to exteDetails
demo, frame new walls & ceiling, create (n) bath out of (e) office on 2nd flr, relocate door to exte | $20,000 |
| Jun 8, 2004 | Expired or cancelled expired Nov 2006 | 1701 Franklin St | new non-bearing walls,cabinets,plumb&elec fix. for staff kitchen.laundry,bathroom&guest rm alternatiDetails
new non-bearing walls,cabinets,plumb&elec fix. for staff kitchen.laundry,bathroom&guest rm alternati | $50,000 |