Block 0588, lot 015
2530 Fillmore St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 4
- Units
- 14
- Rooms
- 16 bathrooms
- Building
- 13,845 sq ft
- Lot
- 5,616 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2024 | Completed final sign-off Nov 2024 | 2530 Fillmore St | Hertz Electric | upscale fire alarm system by adding low frequency horns in the sleeping area.Details
upscale fire alarm system by adding low frequency horns in the sleeping area. | $12,300 |
| Feb 23, 2024 | Completed final sign-off Apr 2024 | 2530 Fillmore St | replace wood rails & slats repair outer rim joinst. repair less than 50% of stair (invisible from st) south landing of lower level stairs repair 2x12 stair stringers treads & risers, prep/paint deckingDetails
replace wood rails & slats repair outer rim joinst. repair less than 50% of stair (invisible from st) south landing of lower level stairs repair 2x12 stair stringers treads & risers, prep/paint decking | $5,000 | |
| Jan 27, 2022 | Completed final sign-off Mar 2022 | 2530 Fillmore St | Real Roofing Inc | reroofingDetails
reroofing | $96,000 |
| Feb 18, 2021 | Completed final sign-off Apr 2022 | 2530 Fillmore St | Control Fire Inc. | installation of overhead fire protection sprinkler system of 87 heads to nfpa 13. includes underground service + hydro calcs + water service + backflow. reference bldg permit #: 2016-1229-6165 r3Details
installation of overhead fire protection sprinkler system of 87 heads to nfpa 13. includes underground service + hydro calcs + water service + backflow. reference bldg permit #: 2016-1229-6165 r3 | $21,139 |
| Aug 11, 2020 | Never finaled issued Aug 2020, no final | 2530 Fillmore St | street spaceDetails
street space | ||
| Sep 10, 2018 | Completed final sign-off Apr 2022 | 2530 Fillmore St | revision to 201612134805 (mandatory soft story program)Details
revision to 201612134805 (mandatory soft story program) | ||
| Jul 19, 2018 | Completed final sign-off Aug 2018 | 2530 Fillmore St | Claros Construction | to obtain final inspection for work approved under pa#201706270496. all work is completeDetails
to obtain final inspection for work approved under pa#201706270496. all work is complete | |
| Jun 27, 2017 | Completed final sign-off Aug 2018 | 2530 Fillmore St | Curran & Associates General Contractors | kitchen & bathroom remodel (no structural work). demo kitchen & bathroom, replace all wall coverings, electrical & plumbing, no new service tie in to (e). same layout.Details
kitchen & bathroom remodel (no structural work). demo kitchen & bathroom, replace all wall coverings, electrical & plumbing, no new service tie in to (e). same layout. | $25,000 |
| Jun 6, 2017 | Completed final sign-off Dec 2017 | 2530 Fillmore St | Restoration Builders Inc | replace windows like for like no structural changes wood for wood existing frames left units 4,7,8 (10 windows each unit) & units 11,12 (8 windows each unit)Details
replace windows like for like no structural changes wood for wood existing frames left units 4,7,8 (10 windows each unit) & units 11,12 (8 windows each unit) | $50,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 2530 Fillmore St | Restoration Builders Inc | replace existing dbl hung windows (non-street-facing) with new wood dh units. 5 in unit 3; 8 in unit 2; 10 in unit 1; replace 2 doors in unit 2 and one in unit 1 with same as existing french door wood. replace 5 casement wood windows in front of unit 3, street-facing with wood windows same like/kindDetails
replace existing dbl hung windows (non-street-facing) with new wood dh units. 5 in unit 3; 8 in unit 2; 10 in unit 1; replace 2 doors in unit 2 and one in unit 1 with same as existing french door wood. replace 5 casement wood windows in front of unit 3, street-facing with wood windows same like/kind | $36,030 |
| Apr 14, 2017 | Completed final sign-off Apr 2017 | 2530 Fillmore St | Restoration Builders Inc | replace like for like. 10each windows and 1 each door on unit #6. replace like for like, 10 each windows and 1 each door for unit #9. existing opening. sizes to remain the sam. u factor - 0.32max. not visible form street.Details
replace like for like. 10each windows and 1 each door on unit #6. replace like for like, 10 each windows and 1 each door for unit #9. existing opening. sizes to remain the sam. u factor - 0.32max. not visible form street. | $20,000 |
| Mar 17, 2017 | Expired or cancelled cancelled Aug 2017 | 2530 Fillmore St | D C S Construction Services Inc | remove & replace kitchen cabinets, upgrade electrical, new plumbing fixtures, insulate drywall and paint.Details
remove & replace kitchen cabinets, upgrade electrical, new plumbing fixtures, insulate drywall and paint. | $14,000 |
| Feb 13, 2017 | Completed final sign-off Jun 2017 | 2530 Fillmore St | D C S Construction Services Inc | apt 9: kitchen remodel - r/r cabinets, upgrade electric, new plumbing fixtures, insulate drywall and paint. non-structural work.Details
apt 9: kitchen remodel - r/r cabinets, upgrade electric, new plumbing fixtures, insulate drywall and paint. non-structural work. | $14,000 |
| Feb 8, 2017 | Expired or cancelled cancelled Aug 2017 | 2530 Fillmore St | D C S Construction Services Inc | unit # 6 remove & replace kitchen cabinets, upgrade electric new plumbing fixtures, insulate drywall & paintDetails
unit # 6 remove & replace kitchen cabinets, upgrade electric new plumbing fixtures, insulate drywall & paint | $10,000 |
| Feb 8, 2017 | Expired or cancelled cancelled Aug 2017 | 2530 Fillmore St | D C S Construction Services Inc | unit # 2 remove & replace kitchen cabinets, upgrade electric new plumbing fixtures, insulate drywall & paintDetails
unit # 2 remove & replace kitchen cabinets, upgrade electric new plumbing fixtures, insulate drywall & paint | $10,000 |
| Dec 29, 2016 | Completed final sign-off Apr 2022 | 2530 Fillmore St | addition of two dwelling units per ordinance no 162-16. reference soft story permit #2016-1213-4804.Details
addition of two dwelling units per ordinance no 162-16. reference soft story permit #2016-1213-4804. | $400,000 | |
| Dec 13, 2016 | Completed final sign-off Apr 2022 | 2530 Fillmore St | to comply with sf wood frame seismic retrofit program (soft story) per sfbc ch 34b iebc appx a4 ab107Details
to comply with sf wood frame seismic retrofit program (soft story) per sfbc ch 34b iebc appx a4 ab107 | $50,000 | |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 2530 Fillmore St | street spaceDetails
street space | ||
| Jan 15, 2016 | Completed final sign-off Jun 2017 | 2530 Fillmore St | D C S Construction Services Inc | remove and replace dry rotted boards from 6 decks located in the back of the building approx 3x6sf on each deck less than 50%.Details
remove and replace dry rotted boards from 6 decks located in the back of the building approx 3x6sf on each deck less than 50%. | $3,500 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 2530 Fillmore St | street spaceDetails
street space | ||
| Dec 2, 2015 | Never finaled issued Dec 2015, no final | 2530 Fillmore St | sidewalk repair onlyDetails
sidewalk repair only | ||
| Nov 25, 2015 | Never finaled issued Nov 2015, no final | 2530 Fillmore St | street spaceDetails
street space | ||
| Oct 14, 2005 | Never finaled issued Oct 2005, no final | 2530 Fillmore St | no additional/new devices to be installed. full life safety test required. submit verification that existing devices are listed to be compatible with new panel fa panel repair replace the fire alarm panel with a new one. all field devices are compatible & will remain in placeDetails
no additional/new devices to be installed. full life safety test required. submit verification that existing devices are listed to be compatible with new panel fa panel repair replace the fire alarm panel with a new one. all field devices are compatible & will remain in place | $3,200 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.