Back to kitchen remodel contractors
Csi Customer Service General Contracting
- Based in
- Richmond
- On San Francisco permits
- May 2001 to Mar 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 4 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 45 Cleary Ct | at existing kitchen interior ceiling and walls, replace sheetrock damaged by water leak from unit above. all sheetrock to be 5/8" 1 hour. no structural work. replace cabinets to existing configuration. install appliances, install new flooring, relocate existing electrical subpanel from closet toDetails
at existing kitchen interior ceiling and walls, replace sheetrock damaged by water leak from unit above. all sheetrock to be 5/8" 1 hour. no structural work. replace cabinets to existing configuration. install appliances, install new flooring, relocate existing electrical subpanel from closet to | $45,000 |