Back to bathroom remodel contractors
Crown Construction San Francisco
- Based in
- San Francisco
- On San Francisco permits
- Aug 2011 to Oct 2026
- Last 24 months
- 12 permits filed
67 permits since 2000: 48 completed, 10 in progress, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 15 completed, 3 in progress. Typically 0 days from filing to permit and 371 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jul 2026 | 143 Buena Vista East Av | electrical rewire, interior remodel to include bathroom and kitchen remodel, replace (e) staircase and remove and infill secondary staircaseDetails
electrical rewire, interior remodel to include bathroom and kitchen remodel, replace (e) staircase and remove and infill secondary staircase | $275,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 143 Buena Vista East Av | interior remodel in-kind of kitchen and bathrooms; no structural work.Details
interior remodel in-kind of kitchen and bathrooms; no structural work. | $20,000 |
| Oct 23, 2025 | In progress issued Oct 2025 | 2200 Sacramento St | unit 1402: remodel kitchen, replace cabinets, counter tops, and flooring. (2) bathroom remodel tiles for shower, plumbing, vanitites, recessed cans, like for like.Details
unit 1402: remodel kitchen, replace cabinets, counter tops, and flooring. (2) bathroom remodel tiles for shower, plumbing, vanitites, recessed cans, like for like. | $150,000 |
| May 1, 2024 | Completed final sign-off Jun 2026 | 2200 Sacramento St | unit #1503: kitchen + bathroom remodel, replace kitchen cabinets & countertops, fixtures, bathroom tile + fixtures.Details
unit #1503: kitchen + bathroom remodel, replace kitchen cabinets & countertops, fixtures, bathroom tile + fixtures. | $200,000 |
| Oct 14, 2022 | Completed final sign-off Apr 2024 | 2411 Washington St | lower level improvement & structural strengthening at 1st story; main & upper level improvements kitchen cabinets, flooring, paint & bath tile, paintDetails
lower level improvement & structural strengthening at 1st story; main & upper level improvements kitchen cabinets, flooring, paint & bath tile, paint | $150,000 |
| Mar 8, 2022 | Completed final sign-off May 2023 | 2200 Sacramento St | #1206. removal of flooring, kitchen cabinets, bathroom tile and counter tops. new finishes. installed and apartment painted. install new sound barrier under new wood floor and replace sheetrock in bathrooms and kitches. removal of flooring. no layout changes.Details
#1206. removal of flooring, kitchen cabinets, bathroom tile and counter tops. new finishes. installed and apartment painted. install new sound barrier under new wood floor and replace sheetrock in bathrooms and kitches. removal of flooring. no layout changes. | $450,000 |
| Jan 3, 2022 | Completed final sign-off Jan 2023 | 3835 26th St | remodel (5) bathrooms, remodel kitchens on 1/f & 2/f, add interior door from garage to house, modify closet & opening @ lower level, remove (2) columns @ lower kitchens, replace (1) ext door w/window, add (1) new door opening replace (4) windows same size (e) openings.Details
remodel (5) bathrooms, remodel kitchens on 1/f & 2/f, add interior door from garage to house, modify closet & opening @ lower level, remove (2) columns @ lower kitchens, replace (1) ext door w/window, add (1) new door opening replace (4) windows same size (e) openings. | $70,000 |
| Mar 31, 2021 | Completed final sign-off Aug 2023 | 455 Connecticut St | convert & expand (e) storage @ attic /2nd floor. to include (2) bedrooms, (1) bathroom, side deck, skylights & roof deck. construct new connecting stairs from 1st floor to attic / 2nd floor. remove 2 walls @ living and dining room. relocate laundry room. replace garage door.Details
convert & expand (e) storage @ attic /2nd floor. to include (2) bedrooms, (1) bathroom, side deck, skylights & roof deck. construct new connecting stairs from 1st floor to attic / 2nd floor. remove 2 walls @ living and dining room. relocate laundry room. replace garage door. | $400,000 |
| Dec 17, 2020 | Completed final sign-off Nov 2021 | 1067 De Haro St | replace kitchen cabinets & appliances. repalce bathroom tiles, sinks, tub, showers & fixtures. new windows and deck doors (non street visible). new flooring w/ hydronic heating. new interior stairs and railigs.Details
replace kitchen cabinets & appliances. repalce bathroom tiles, sinks, tub, showers & fixtures. new windows and deck doors (non street visible). new flooring w/ hydronic heating. new interior stairs and railigs. | $128,000 |
| Jan 28, 2019 | Completed final sign-off Jul 2019 | 1214 Fulton St | revision to 201810163375 for the reconfiguration of bath and bedroom areas and new closet at master bedroom, reconfigure bath door at 2nd fl unit 1214a fultonDetails
revision to 201810163375 for the reconfiguration of bath and bedroom areas and new closet at master bedroom, reconfigure bath door at 2nd fl unit 1214a fulton | $30,000 |
| Oct 16, 2018 | Completed final sign-off Jul 2019 | 1214 Fulton St | work in addition to 201802141326, repair and reconstruction of fire and water damage throughout units 1214 and 1214a including restoration of plaster work and details, replacement of masonry fireplaces, 2nd fl bath, front bdrm finishes and mech system 1214 aDetails
work in addition to 201802141326, repair and reconstruction of fire and water damage throughout units 1214 and 1214a including restoration of plaster work and details, replacement of masonry fireplaces, 2nd fl bath, front bdrm finishes and mech system 1214 a | $60,000 |
| Sep 18, 2018 | Completed final sign-off Jun 2020 | 1312 Pacific Av | remove finish surfaces from kitchen & bathroomDetails
remove finish surfaces from kitchen & bathroom | $2,000 |
| Sep 6, 2018 | Completed final sign-off Jul 2019 | 10 Rayburn St | bathroom remodel, lighting, plumbing, tiling & cabinetry. replace in-like location. approx 60 sq ft.Details
bathroom remodel, lighting, plumbing, tiling & cabinetry. replace in-like location. approx 60 sq ft. | $20,000 |
| Aug 16, 2018 | Completed final sign-off Mar 2019 | 739 Kansas St | cosmetic kitchen & bathroom remodel. lighting/fixtures & tile & stone & painting. in-kind, no structural work. comply w/ec150.0(k)3 & cec150.0(k)5.Details
cosmetic kitchen & bathroom remodel. lighting/fixtures & tile & stone & painting. in-kind, no structural work. comply w/ec150.0(k)3 & cec150.0(k)5. | $30,000 |
| May 14, 2018 | Completed final sign-off Oct 2018 | 2409 Vallejo St | bathroom remodel: replace fixtures and fittings.Details
bathroom remodel: replace fixtures and fittings. | $20,000 |
| Apr 10, 2018 | Completed final sign-off Nov 2021 | 1754 Fell St | basement: new foundation, replace (e) rear ratining walls; new ext. openings/int. layout; 1/f: new ext. door @ kitchen, new wood deck/stone patio, new ext. stair to basement; 2/f: new bathroom & closets, remove (e) brick chimney @ rear - not visible from street.Details
basement: new foundation, replace (e) rear ratining walls; new ext. openings/int. layout; 1/f: new ext. door @ kitchen, new wood deck/stone patio, new ext. stair to basement; 2/f: new bathroom & closets, remove (e) brick chimney @ rear - not visible from street. | $100,000 |
| Feb 17, 2015 | Completed final sign-off Oct 2020 | 2728 Green St | no walls to be mvoed|fixtures & finishes: remove kitchen cabinets and countertops, install new and repair kitchen, all plumbing & electrical in existing locations. remove tub and tile in bathroom 1st floor, countertop & vanity & repaint bathroom; maher n/aDetails
no walls to be mvoed|fixtures & finishes: remove kitchen cabinets and countertops, install new and repair kitchen, all plumbing & electrical in existing locations. remove tub and tile in bathroom 1st floor, countertop & vanity & repaint bathroom; maher n/a | $30,000 |
| Feb 9, 2015 | Completed final sign-off May 2015 | 95 26th Av | #f: remodel of 3 bathrooms replacing plumbing fixutres, adding electrical fan in each and replacing tile. no alteration of wall, window and door.Details
#f: remodel of 3 bathrooms replacing plumbing fixutres, adding electrical fan in each and replacing tile. no alteration of wall, window and door. | $45,000 |