Crow Works
- Based in
- San Pablo
- On San Francisco permits
- Dec 2011 to Dec 2011
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2011 | Completed final sign-off Mar 2012 | 507 Dellbrook Av | kitchen remodel/remove all cabinets & appliances replace with new , upgrade all electrical, replace surface flooring material, tile back splash install microwave w/hood to be connected to existing ventDetails
kitchen remodel/remove all cabinets & appliances replace with new , upgrade all electrical, replace surface flooring material, tile back splash install microwave w/hood to be connected to existing vent | $32,000 |