Permit GraphShortlistSan Francisco building permits since 2000

Critical Path Planning

Contractor license
818966
State license record
Based in
Fairfax
On San Francisco permits
Jan 2004 to Jan 2006
Last 24 months
0 permits filed

17 permits since 2000: 11 completed, 2 never finaled, 4 expired or cancelled.

Of the 2 never-finaled permits, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllKitchen remodel 6Bathroom remodel 4
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 24, 2006Never finaled
issued Jan 2006, no final
357 Collingwood Stinstall 8-18" 0 drilled piers in existing swimming pool to stabilize pool. pool to be infilled and decomissioned
Details
Permit
200601242889
Permit issued
Jan 24, 2006

install 8-18" 0 drilled piers in existing swimming pool to stabilize pool. pool to be infilled and decomissioned

Open the permit page

$30,000
Nov 21, 2005Completed
final sign-off Apr 2006
4096 17th Stupgrade kitchen cabinets and appliances on 2nd floor
Details
Permit
200511218674
Permit issued
Nov 21, 2005
Final sign-off
Apr 17, 2006

upgrade kitchen cabinets and appliances on 2nd floor

Open the permit page

$6,500
Aug 15, 2005Completed
final sign-off Jan 2006
1446 08th Avkitchen remodel, update cabinetry, new floorfinish, new lighting, move fridge and add wter line for
Details
Permit
200508150259
Permit issued
Aug 15, 2005
Final sign-off
Jan 20, 2006

kitchen remodel, update cabinetry, new floorfinish, new lighting, move fridge and add wter line for

Open the permit page

$30,000
Jun 15, 2005Completed
final sign-off Sep 2005
366 Arguello Blupdate plumbing fixtures, tiles, shower doors in 3 bathrooms
Details
Permit
200506155105
Permit issued
Jun 15, 2005
Final sign-off
Sep 28, 2005

update plumbing fixtures, tiles, shower doors in 3 bathrooms

Open the permit page

$30,000
Jun 8, 2005Completed
final sign-off Apr 2006
668 Elizabeth Stkitchen and dining area remodel update kitchen counters and cabinets new windows (replace old) in
Details
Permit
200506084521
Permit issued
Jun 8, 2005
Final sign-off
Apr 10, 2006

kitchen and dining area remodel update kitchen counters and cabinets new windows (replace old) in

Open the permit page

$47,000
Jun 8, 2005Completed
final sign-off Jun 2005
1114 Clay Strenew 200407269771, 200407138666, 200408030487 for final insp.
Details
Permit
200506084512
Permit issued
Jun 8, 2005
Final sign-off
Jun 15, 2005

renew 200407269771, 200407138666, 200408030487 for final insp.

Open the permit page

Oct 21, 2004Never finaled
issued Oct 2004, no final
226 Clinton Pkkitchen and bathroom remodel - replacement of two windows
Details
Permit
200410217405
Permit issued
Oct 21, 2004

kitchen and bathroom remodel - replacement of two windows

Open the permit page

$44,000
Aug 24, 2004Completed
final sign-off Oct 2005
1120 Clay Stmerge unit a-2&b-2 to 1 unit.remove 2 hallway doors,kitchen.built bedroom closet.
Details
Permit
200408242334
Permit issued
Mar 10, 2005
Final sign-off
Oct 4, 2005

merge unit a-2&b-2 to 1 unit.remove 2 hallway doors,kitchen.built bedroom closet.

Open the permit page

$6,000
Jul 26, 2004Expired or cancelled
expired Jun 2007
1114 Clay Sttake at propsd beam because it is unecesssary and replace with 2x10 ceiling joists @ flr above grg
Details
Permit
200407269771
Permit issued
Jul 26, 2004

take at propsd beam because it is unecesssary and replace with 2x10 ceiling joists @ flr above grg

Open the permit page

Jul 13, 2004Expired or cancelled
expired Jun 2005
1114 Clay Stremove extg interior wall and replace with steel i beam and wood posts
Details
Permit
200407138666
Permit issued
Jul 13, 2004

remove extg interior wall and replace with steel i beam and wood posts

Open the permit page

$2,000
Jul 12, 2004Expired or cancelled
expired Apr 2007
271 Laidley Stalt of existing plans including app #200404050487 elimination of underpinning of (e) wall due to
Details
Permit
200407128476
Permit issued
Jul 12, 2004

alt of existing plans including app #200404050487 elimination of underpinning of (e) wall due to

Open the permit page

Apr 22, 2004Completed
final sign-off Jun 2005
1120 Clay Stremodel/uppdate 2 bthrm and 1 kchn in unit #1/no strct./nw fixtures installation
Details
Permit
200404222001
Permit issued
Apr 22, 2004
Final sign-off
Jun 10, 2005

remodel/uppdate 2 bthrm and 1 kchn in unit #1/no strct./nw fixtures installation

Open the permit page

$36,000
Apr 22, 2004Completed
final sign-off Sep 2004
2379 46th Avbedroom and bathroom addition in 1st floor adjacent to garage
Details
Permit
200404221997
Permit issued
Apr 22, 2004
Final sign-off
Sep 28, 2004

bedroom and bathroom addition in 1st floor adjacent to garage

Open the permit page

$20,400
Apr 5, 2004Expired or cancelled
expired Apr 2007
271 Laidley Stexcavation of excess soil egainst walls in basement to make increased storage space. construction of
Details
Permit
200404050487
Permit issued
Apr 5, 2004

excavation of excess soil egainst walls in basement to make increased storage space. construction of

Open the permit page

$11,500
Feb 23, 2004Completed
final sign-off Jul 2004
155 Colon Avkitchen & bath remodel, change cabs & countertops, replace fixtures (plumbing & electrical) redo flo
Details
Permit
200402236961
Permit issued
Feb 23, 2004
Final sign-off
Jul 8, 2004

kitchen & bath remodel, change cabs & countertops, replace fixtures (plumbing & electrical) redo flo

Open the permit page

$14,500
Feb 6, 2004Completed
final sign-off Feb 2004
1120 Clay Strenew expired permit for final inspection on app 200211141411
Details
Permit
200402065807
Permit issued
Feb 6, 2004
Final sign-off
Feb 20, 2004

renew expired permit for final inspection on app 200211141411

Open the permit page

Jan 21, 2004Completed
final sign-off Apr 2005
1114 Clay Stconnect 1st fl w/basement to form 2-story dwelling place and additional storage
Details
Permit
200401214531
Permit issued
Apr 22, 2004
Final sign-off
Apr 25, 2005

connect 1st fl w/basement to form 2-story dwelling place and additional storage

Open the permit page

$60,000