Block 3534, lot 048
226 Clinton Park
- City’s use
- Single Family Residential
- Built
- 1885
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,784 sq ft
- Lot
- 1,873 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 8, 2026 | Completed final sign-off Sep 2026 | 226 Clinton Pk | Be Home Remodeling Inc | like for like replacement of e) deck, wood board and stais on the 1st/f. no work on 2nd/fDetails
like for like replacement of e) deck, wood board and stais on the 1st/f. no work on 2nd/f | $8,000 |
| Aug 3, 2021 | Completed final sign-off Aug 2021 | 226 Clinton Pk | Highland Construction S F Inc. | reroofingDetails
reroofing | $16,000 |
| Feb 21, 2014 | Never finaled filed Feb 2014, never issued | 226 Clinton Pk | Sf Construction Services | remove damaged concrete slab/driveway between garage & sidewalk, partial removal of concrete slab btwn garage door & (e) floor drain (approx 200 sq. ft.). install driveway concrete channel drain in front of garage door, connect to (e) floor drain. install new concrete slab, pitched toward drains.Details
remove damaged concrete slab/driveway between garage & sidewalk, partial removal of concrete slab btwn garage door & (e) floor drain (approx 200 sq. ft.). install driveway concrete channel drain in front of garage door, connect to (e) floor drain. install new concrete slab, pitched toward drains. | $8,250 |
| Oct 21, 2004 | Never finaled issued Oct 2004, no final | 226 Clinton Pk | Critical Path Planning | kitchen and bathroom remodel - replacement of two windowsDetails
kitchen and bathroom remodel - replacement of two windows | $44,000 |
| Jul 31, 2003 | Completed final sign-off Feb 2004 | 226 Clinton Pk | repair floor in upstairs bath, replace tiles, sheetrock bdrm ceiling, remove cracked plaster, gravitDetails
repair floor in upstairs bath, replace tiles, sheetrock bdrm ceiling, remove cracked plaster, gravit | $7,100 | |
| Jul 11, 2003 | Completed final sign-off Feb 2004 | 226 Clinton Pk | elect: new service, wiring, upgrade. replace sheetrock for above (1 kitchen wall) 2 windows. retrofiDetails
elect: new service, wiring, upgrade. replace sheetrock for above (1 kitchen wall) 2 windows. retrofi | $5,700 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.