Back to kitchen remodel contractors
Crime Watch Security Sys Llc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Mar 2026
- Last 24 months
- 392 permits filed
2,952 permits since 2000: 2,618 completed, 90 in progress, 214 never finaled, 30 expired or cancelled.
Of the 214 never-finaled permits, 66 are 3 to 5 years old, 112 are 5 to 10 years old, 36 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 22 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2024 | Completed final sign-off Dec 2024 | 854 Clay St | as built: replace all heat detectors with smoke detectors added 2 heat detectors in the kitchens. ref#: 202210265215Details
as built: replace all heat detectors with smoke detectors added 2 heat detectors in the kitchens. ref#: 202210265215 | |
| Oct 24, 2024 | Completed final sign-off Oct 2024 | 940 Sutter St | tenant improvement phase 2- add 1 ceiling horn strobe in the ground flr kitchen areaDetails
tenant improvement phase 2- add 1 ceiling horn strobe in the ground flr kitchen area | $700 |
| Jun 6, 2024 | Completed final sign-off Jul 2024 | 940 Sutter St | as built changes 6/5/24 - added 2 wall strobes to each of the bathrooms on the ground floor and removed the horn strobe in the ground floor kitchen. the kitchen horn strobe will be added later via another permit in pase 2 of the remodel.Details
as built changes 6/5/24 - added 2 wall strobes to each of the bathrooms on the ground floor and removed the horn strobe in the ground floor kitchen. the kitchen horn strobe will be added later via another permit in pase 2 of the remodel. | |
| Oct 5, 2023 | Completed final sign-off Nov 2023 | 550 27th St | as built to permit 202303274422. corrected room name in unit 103 from kitchen to bedroom and added 1 lf sounder in it.Details
as built to permit 202303274422. corrected room name in unit 103 from kitchen to bedroom and added 1 lf sounder in it. | |
| Sep 19, 2018 | Completed final sign-off Oct 2018 | 2525 Phelps St | modify (e) alarm to monitor the new ansul/ul300 supprression system for the new commercial kitchen ref: 201805229784, (sprinkler monitoring 201801249428), ul300 system 201807305854Details
modify (e) alarm to monitor the new ansul/ul300 supprression system for the new commercial kitchen ref: 201805229784, (sprinkler monitoring 201801249428), ul300 system 201807305854 | $1,000 |
| Jan 8, 2018 | Completed final sign-off Jan 2018 | 3250 Laguna St | fire alarm as built for pa 2017-1221-7179. added 6 smoke detectors, changed label from kitchen to bedroom on penthouse level.Details
fire alarm as built for pa 2017-1221-7179. added 6 smoke detectors, changed label from kitchen to bedroom on penthouse level. | $7,000 |