Back to kitchen remodel contractors
Creative Spaces
- Based in
- Berkeley
- On San Francisco permits
- Mar 2000 to Feb 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 19 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2017 | Completed final sign-off May 2018 | 150 Carnelian Wy | remodel kitchen, den, master bath. replace cabinets, countertops (work on 2nd fl only. no rough framing, no change of e layout of kitchen and bathDetails
remodel kitchen, den, master bath. replace cabinets, countertops (work on 2nd fl only. no rough framing, no change of e layout of kitchen and bath | $65,000 |
| Oct 6, 2010 | Completed final sign-off Mar 2011 | 1030 Sacramento St | unit #1030 - remodel kitchen & one bathroom including new cabinets, counters, fixtures & appliances. new washer & dryer @ laundry area. no wall relocation. dryer exhaust through sidewall, terminate 3' min. from property line and bldg. opening. exhaust length 14' max.Details
unit #1030 - remodel kitchen & one bathroom including new cabinets, counters, fixtures & appliances. new washer & dryer @ laundry area. no wall relocation. dryer exhaust through sidewall, terminate 3' min. from property line and bldg. opening. exhaust length 14' max. | $20,000 |
| May 14, 2009 | Completed final sign-off Jun 2010 | 999 Green St | apt 2302 - interior alterations to existing unit # 2302 , 23rd fl. no exterior work. no work to heating. work incl. lighting, plumb, fixtures, appliances, finishes and kitchen and bathrooms. no structural alterations.Details
apt 2302 - interior alterations to existing unit # 2302 , 23rd fl. no exterior work. no work to heating. work incl. lighting, plumb, fixtures, appliances, finishes and kitchen and bathrooms. no structural alterations. | $310,000 |
| Mar 4, 2009 | Completed final sign-off Sep 2009 | 1050 Green St | remodel 2nd floor unit with new opening in (e) interior walls. remodel 2 bathrooms-fixtures & finishes, remodel kitchen-sink, countertop, cabinets & lights. new finishes throughout floor, paint baseboardDetails
remodel 2nd floor unit with new opening in (e) interior walls. remodel 2 bathrooms-fixtures & finishes, remodel kitchen-sink, countertop, cabinets & lights. new finishes throughout floor, paint baseboard | $192,000 |
| Oct 22, 2004 | Completed final sign-off Feb 2005 | 575 Myra Wy | alteration to upstairs bath (tile,fixtures,lights).alteration to kitchen(counters,lights,flooring)Details
alteration to upstairs bath (tile,fixtures,lights).alteration to kitchen(counters,lights,flooring) | $42,000 |