Back to bathroom remodel contractors
Craig T. Cummings
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Feb 2014
- Last 24 months
- 0 permits filed
58 permits since 2000: 53 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 19 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2013 | Completed final sign-off May 2014 | 1620 Ortega St | bathroom remodel - new tile and fixtures - all work in existing footprint - no structural.Details
bathroom remodel - new tile and fixtures - all work in existing footprint - no structural. | $10,000 |
| Jul 12, 2013 | Completed final sign-off Oct 2013 | 2085 14th Av | bathroom remodel - new tile and fixtures - all work in existing footprint - no structural.Details
bathroom remodel - new tile and fixtures - all work in existing footprint - no structural. | $10,000 |
| Apr 3, 2013 | Completed final sign-off Jun 2013 | 1254 40th Av | kitchen remodel new drywall, cabinets, flooring no sturctural replace in existing footprint replace tile in bathroom shower,wall & flooring no alteration of of partition wall, kitchen 50% lighting to be h.e ,new hood fan in (e) opening .Details
kitchen remodel new drywall, cabinets, flooring no sturctural replace in existing footprint replace tile in bathroom shower,wall & flooring no alteration of of partition wall, kitchen 50% lighting to be h.e ,new hood fan in (e) opening . | $35,000 |
| Aug 3, 2012 | Completed final sign-off Sep 2012 | 1 Daniel Burnham Ct | bathroom: shower stall replacement only, remove & replace tile, shower walls and floor, all work in existing footprint, no structural/wall changes, no changes to lighting.Details
bathroom: shower stall replacement only, remove & replace tile, shower walls and floor, all work in existing footprint, no structural/wall changes, no changes to lighting. | $6,000 |
| May 31, 2012 | Completed final sign-off Jul 2012 | 1 Daniel Burnham Ct | bath remodel- partial, replace tub and shower walls, replace tile floor and toilet, all work in existing bath, no structural, no wall change, no lighting change. lighting to comply with cec150(k)Details
bath remodel- partial, replace tub and shower walls, replace tile floor and toilet, all work in existing bath, no structural, no wall change, no lighting change. lighting to comply with cec150(k) | $15,000 |
| Feb 28, 2012 | Completed final sign-off Apr 2012 | 16 Levant St | bathroom remodel - replace drywall, tile, cabinets, lighting, plumbing fixtures. all replacement in (e) foot print. no structural. all (n) lighting must comply w/cec 150(k).Details
bathroom remodel - replace drywall, tile, cabinets, lighting, plumbing fixtures. all replacement in (e) foot print. no structural. all (n) lighting must comply w/cec 150(k). | $20,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2012 | 1606 Vallejo St | bathroom#1 lower floor- replace ped lav with cabinet. bathroom #2 middle floor- replace lav cabinet, medicine cabinets, bathroom #3 middle floor- replace shower stall. all work in existing foot pronts, no structural, no new lighting.Details
bathroom#1 lower floor- replace ped lav with cabinet. bathroom #2 middle floor- replace lav cabinet, medicine cabinets, bathroom #3 middle floor- replace shower stall. all work in existing foot pronts, no structural, no new lighting. | $10,000 |
| Apr 11, 2011 | Completed final sign-off Jun 2011 | 753 18th Av | bath/water closet, remodel (no structural) new fixtures, tile, lighting. in e footpring. new lighting comply cec150kDetails
bath/water closet, remodel (no structural) new fixtures, tile, lighting. in e footpring. new lighting comply cec150k | $15,000 |
| Feb 8, 2011 | Completed final sign-off Apr 2011 | 751 18th Av | bathroom / water closet remodel. new drywall, flooring, cabinet, plumbing fixtures. no structural - replace existing as is.Details
bathroom / water closet remodel. new drywall, flooring, cabinet, plumbing fixtures. no structural - replace existing as is. | $15,000 |
| Oct 19, 2009 | Completed final sign-off Feb 2010 | 333 West Portal Av | work on top floor.rev. to pa# 2009.09.29.7577. move doorway in laundry partition wall. remove 8' partition wall at dining rm. open breakfast nook wall to (e) arech way. remove telephone alcove and replace with wall for closet. bathroom remodel- new tile and fixtures.Details
work on top floor.rev. to pa# 2009.09.29.7577. move doorway in laundry partition wall. remove 8' partition wall at dining rm. open breakfast nook wall to (e) arech way. remove telephone alcove and replace with wall for closet. bathroom remodel- new tile and fixtures. | $20,000 |
| Feb 25, 2008 | Completed final sign-off Aug 2008 | 55 Ventura Av | kitchen remodel. bath remodel 1st floor, 2 bath remodels second floor. remove two non bearing partitians walls at dining room (1st fl).Details
kitchen remodel. bath remodel 1st floor, 2 bath remodels second floor. remove two non bearing partitians walls at dining room (1st fl). | $80,000 |
| Jul 3, 2007 | Completed final sign-off Aug 2007 | 101 Randall St | work @ unit# b only. master bedroom, bath remodel. new shower pan & walls. new drywall & tile. new fixtures & lighting. 50% lighting fluorescent o.s. in bath. no structural. no moving of doors / walls or windows.Details
work @ unit# b only. master bedroom, bath remodel. new shower pan & walls. new drywall & tile. new fixtures & lighting. 50% lighting fluorescent o.s. in bath. no structural. no moving of doors / walls or windows. | $20,000 |
| May 29, 2007 | Completed final sign-off Aug 2007 | 101 Randall St | unit b. bath remodel. master bath only. no structural in existing footprint. new tile shower walk and floor. new shower value. new electric outlet.Details
unit b. bath remodel. master bath only. no structural in existing footprint. new tile shower walk and floor. new shower value. new electric outlet. | $5,000 |
| Mar 26, 2007 | Completed final sign-off May 2007 | 146 Duncan St | bath room remodel. fluorescent lighting. new tile fixxtures, wndw rplacemtnt in kind u factor max= 0.67Details
bath room remodel. fluorescent lighting. new tile fixxtures, wndw rplacemtnt in kind u factor max= 0.67 | $15,000 |
| Nov 1, 2005 | Completed final sign-off Jan 2006 | 2945 Ulloa St | bath remodel- no structural/new drywall and tile new lav cabinet, new tub and shower fixtures/replacement wndw side work on 2nd floorDetails
bath remodel- no structural/new drywall and tile new lav cabinet, new tub and shower fixtures/replacement wndw side work on 2nd floor | $18,000 |
| Jul 5, 2005 | Completed final sign-off Nov 2005 | 256 Presidio Av | kitchen & bath remodel.Details
kitchen & bath remodel. | $55,000 |
| Jun 3, 2005 | Completed final sign-off Aug 2005 | 325 Oak Park Dr | 2 bathroom remodel, no structural, replace fixtures, tub, toilet, vanities, electrical,plumbing upgrDetails
2 bathroom remodel, no structural, replace fixtures, tub, toilet, vanities, electrical,plumbing upgr | $35,000 |
| May 17, 2004 | Expired or cancelled expired Jun 2005 | 148 Duncan St | bath remodel-no structural install new sink, toilet, new drywall and flooring tile shower walls,Details
bath remodel-no structural install new sink, toilet, new drywall and flooring tile shower walls, | $15,000 |
| Apr 15, 2003 | Completed final sign-off Jun 2003 | 2 Turquoise Wy | existing bath remodel.new tub,toilet,vanity & new tile walls & flr electrical & plumbing upgrades.noDetails
existing bath remodel.new tub,toilet,vanity & new tile walls & flr electrical & plumbing upgrades.no | $20,000 |
| Nov 6, 2001 | Completed final sign-off Jan 2002 | 256 Presidio Av | bathroom remodel: new fixtures, plumbing & electrical upgrade, dry wall in kind replacementDetails
bathroom remodel: new fixtures, plumbing & electrical upgrade, dry wall in kind replacement | $20,000 |