Block 6663, lot 001
101 Randall St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 12, 2010 | Completed final sign-off May 2010 | 101 Randall St | Loughran Construction Inc. | voluntary plywood stiffening at residential garages of a 3-story, 3-unit mixed-use building. parital gr floor onlyDetails
voluntary plywood stiffening at residential garages of a 3-story, 3-unit mixed-use building. parital gr floor only | $5,300 |
| Mar 5, 2009 | Completed final sign-off Aug 2009 | 103 Randall St | to comply with condo conversion report #5494 including legalization of existing unpermitted addition. 527 sq ft @ 3rd floor.Details
to comply with condo conversion report #5494 including legalization of existing unpermitted addition. 527 sq ft @ 3rd floor. | $73,442 | |
| Oct 16, 2008 | Completed final sign-off Oct 2008 | 101 Randall St | R B Roofing Co Inc | reroofingDetails
reroofing | $6,500 |
| Mar 18, 2008 | Completed final sign-off Sep 2008 | 101 Randall St | Occidental Express | opening ceiling and walls for installation of(9) recessed lights, then patching & painting.Details
opening ceiling and walls for installation of(9) recessed lights, then patching & painting. | $1,800 |
| Oct 11, 2007 | Completed final sign-off Oct 2007 | 101 Randall St | Pegasus Building/Castle Construction | replace existing handreail on second existing stair to bring to code.Details
replace existing handreail on second existing stair to bring to code. | $500 |
| Jul 3, 2007 | Completed final sign-off Aug 2007 | 101 Randall St | Craig T. Cummings | work @ unit# b only. master bedroom, bath remodel. new shower pan & walls. new drywall & tile. new fixtures & lighting. 50% lighting fluorescent o.s. in bath. no structural. no moving of doors / walls or windows.Details
work @ unit# b only. master bedroom, bath remodel. new shower pan & walls. new drywall & tile. new fixtures & lighting. 50% lighting fluorescent o.s. in bath. no structural. no moving of doors / walls or windows. | $20,000 |
| Jun 29, 2007 | Never finaled issued Jun 2007, no final | 100 Chenery St | verify/add address #100 chenery (com'l)(#101 randall- lower) (#103 randall-upper)(2 residential)Details
verify/add address #100 chenery (com'l)(#101 randall- lower) (#103 randall-upper)(2 residential) | ||
| Jun 20, 2007 | Completed final sign-off Aug 2007 | 101 Randall St | Craig T. Cummings | kitchen remodel new cabinets, drywall, flooring in (e) footprint no structural. new lighting. at least 50% lighting wattage must be fluorescent. exhaust connect to (e) duct. r-13 wall insulation.Details
kitchen remodel new cabinets, drywall, flooring in (e) footprint no structural. new lighting. at least 50% lighting wattage must be fluorescent. exhaust connect to (e) duct. r-13 wall insulation. | $20,000 |
| May 29, 2007 | Completed final sign-off Aug 2007 | 101 Randall St | Craig T. Cummings | unit b. bath remodel. master bath only. no structural in existing footprint. new tile shower walk and floor. new shower value. new electric outlet.Details
unit b. bath remodel. master bath only. no structural in existing footprint. new tile shower walk and floor. new shower value. new electric outlet. | $5,000 |
| May 17, 2007 | Never finaled issued May 2007, no final | 101 Randall St | Craig T. Cummings | unit #b - kitchen remodel - in existing work at top floor unit #b foot print. new drywall, cabinets, flooring. no structural. min 50% of kitchen lighting wattage must be flourescent.Details
unit #b - kitchen remodel - in existing work at top floor unit #b foot print. new drywall, cabinets, flooring. no structural. min 50% of kitchen lighting wattage must be flourescent. | $20,000 |
| Mar 3, 2003 | Completed final sign-off May 2003 | 100 Chenery St | revise structural plans due to conditions discovered in the fieldDetails
revise structural plans due to conditions discovered in the field | $400 | |
| Feb 4, 2003 | Completed final sign-off May 2003 | 100 Chenery St | repair e roof and e roof deckDetails
repair e roof and e roof deck | $18,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Craig T. Cummings (4), Loughran Construction Inc., Occidental Express, Pegasus Building/Castle Construction, R B Roofing Co Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.