Counterforce Inc.
- Based in
- Oakland
- On San Francisco permits
- Apr 2000 to Mar 2025
- Last 24 months
- 2 permits filed
71 permits since 2000: 55 completed, 6 never finaled, 10 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 212 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2021 | Completed final sign-off Jan 2022 | 4162 17th St | in kind repair of front entry stairs not to exceed 50% . replace (e) pad footings @ bay.Details
in kind repair of front entry stairs not to exceed 50% . replace (e) pad footings @ bay. | $6,500 |
| Jun 11, 2010 | Completed final sign-off Mar 2012 | 2113 Bush St | (n) interior stair between 1st & 2nd fl, replace (e) kitchen. merging (e) 2 units building into single family dwelling. (n) bedroom, bathroom and office at basement level with retaining walls and stairs to rear year. horizontal extenstion of 18 feet under (e) rear deck. remodel of bed & bath @3rd flDetails
(n) interior stair between 1st & 2nd fl, replace (e) kitchen. merging (e) 2 units building into single family dwelling. (n) bedroom, bathroom and office at basement level with retaining walls and stairs to rear year. horizontal extenstion of 18 feet under (e) rear deck. remodel of bed & bath @3rd fl | $20,000 |
| May 15, 2007 | Completed final sign-off Jan 2009 | 2125 19th St | add second floor, structural revisions at basement/garage. add stair, modify electrical & plumbing, refer to dcp 20051212evDetails
add second floor, structural revisions at basement/garage. add stair, modify electrical & plumbing, refer to dcp 20051212ev | $150,000 |