Back to bathroom remodel contractors
Cornerstone Dba Ag Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2012 to Sep 2026
- Last 24 months
- 5 permits filed
107 permits since 2000: 87 completed, 3 in progress, 10 never finaled, 7 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
39 bathroom remodel permits: 31 completed, 2 in progress, 4 never finaled, 2 expired or cancelled. Typically 3 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2026 | In progress issued May 2026 | 121 Dalewood Wy | convert part of garage into condition space to include (n) bedroom, bathroom, and laundry room. add a window in place of the garage door. curb cut reduction under dpw permit.Details
convert part of garage into condition space to include (n) bedroom, bathroom, and laundry room. add a window in place of the garage door. curb cut reduction under dpw permit. | $50,000 |
| Jun 26, 2025 | Completed final sign-off Dec 2025 | 2018 42nd Av | bathroom addition (no change to footprint) in e) garage areaDetails
bathroom addition (no change to footprint) in e) garage area | $20,000 |
| Dec 18, 2024 | In progress issued Jun 2025 | 5531 Diamond Heights Bl | remodel (e) single family home to include a (n) bathroom from garage space. update rear railings. no change to structural.Details
remodel (e) single family home to include a (n) bathroom from garage space. update rear railings. no change to structural. | $8,000 |
| Oct 8, 2024 | Completed final sign-off Aug 2025 | 2042 42nd Av | interior remodel to remove internal stair and enclose an external stair. add 2 baths @ lower level. add 1/2 bath at upper level.Details
interior remodel to remove internal stair and enclose an external stair. add 2 baths @ lower level. add 1/2 bath at upper level. | $80,000 |
| Sep 3, 2024 | Completed final sign-off Dec 2024 | 5531 Diamond Heights Bl | remodel kitchen and 2 bathrooms in kind. replace 7 windows- 2 in front of the ouse and 5 facing back yard. one patio door. same size, same locations, max u-factor 0.30.Details
remodel kitchen and 2 bathrooms in kind. replace 7 windows- 2 in front of the ouse and 5 facing back yard. one patio door. same size, same locations, max u-factor 0.30. | $20,000 |
| Feb 2, 2024 | Completed final sign-off Sep 2024 | 733 Front St | remodel (2) bathrooms, new plumbing, remove (2) shower stalls and add 2 non ada lavatories.Details
remodel (2) bathrooms, new plumbing, remove (2) shower stalls and add 2 non ada lavatories. | $20,000 |
| Dec 21, 2022 | Completed final sign-off Feb 2023 | 65 Keystone Wy | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $11,000 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 3070 Market St | demo half bath, new full bath shower pan. replace kitchen cabinetsDetails
demo half bath, new full bath shower pan. replace kitchen cabinets | $10,000 |
| Apr 7, 2021 | Completed final sign-off Jun 2021 | 1363 07th Av | unit 5: replace kitchen cabinets. upgrade plumbing and electrical. add recessed lights. remodel bathroomDetails
unit 5: replace kitchen cabinets. upgrade plumbing and electrical. add recessed lights. remodel bathroom | $15,000 |
| Apr 5, 2021 | Completed final sign-off Oct 2021 | 175 Bluxome St | remodel 1 kitchen and 2 bathrooms, add recessed lights. no moving walls.Details
remodel 1 kitchen and 2 bathrooms, add recessed lights. no moving walls. | $20,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2023 | 2770 36th Av | to comply with nov 202024049/202037363/202056524: reconfig kitchen bathrooms, add one bathroom & relocated inerior stairs at 2/f. remodel bedroom &y bathroom, convert family room to bedroom, dd 1 bathroom, media room & wet bar, relocated washer/dryer at 1/f. amend to 201908290173 for additional wrkDetails
to comply with nov 202024049/202037363/202056524: reconfig kitchen bathrooms, add one bathroom & relocated inerior stairs at 2/f. remodel bedroom &y bathroom, convert family room to bedroom, dd 1 bathroom, media room & wet bar, relocated washer/dryer at 1/f. amend to 201908290173 for additional wrk | $90,000 |
| Jun 19, 2020 | Completed final sign-off Sep 2020 | 1159 Green St | remodel bathroom in-kind, replace lightwell window not street facing, plumbing, elec, showerpanDetails
remodel bathroom in-kind, replace lightwell window not street facing, plumbing, elec, showerpan | $5,000 |
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 90 Joost Av | remodeling bathroom. upgrade electrica & plumbing new tub, wc, van9ity, cabinet.Details
remodeling bathroom. upgrade electrica & plumbing new tub, wc, van9ity, cabinet. | $8,500 |
| Nov 22, 2019 | Completed final sign-off Jun 2020 | 375 09th St | interior fill out of existing building into a pottery and wood turning studio. renovations include addition of an ada bathroom, additional lights/outlets, leveling floor, and additional sinksDetails
interior fill out of existing building into a pottery and wood turning studio. renovations include addition of an ada bathroom, additional lights/outlets, leveling floor, and additional sinks | $73,300 |
| Nov 5, 2019 | Completed final sign-off Feb 2020 | 240 Lombard St | unit #434: kitchen and bathroom remodel. replace tub with shower pan, upgrade electrical, replace kitchen cabinets, upgrade electrical and plumbing, change lightsin the kitchen to led.Details
unit #434: kitchen and bathroom remodel. replace tub with shower pan, upgrade electrical, replace kitchen cabinets, upgrade electrical and plumbing, change lightsin the kitchen to led. | $20,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2021 | 2406 Polk St | accessible barrier removal including addition of bathroom and alteration to front entry to comply with abe program per ordinance 51-16.Details
accessible barrier removal including addition of bathroom and alteration to front entry to comply with abe program per ordinance 51-16. | $5,000 |
| Oct 5, 2018 | Never finaled issued Feb 2019, no final | 215 Baden St | add a full bath of first floor. the slab will be loweredDetails
add a full bath of first floor. the slab will be lowered | $60,000 |
| Jul 2, 2018 | Completed final sign-off Sep 2018 | 190 Castro St | unit 3: remodel 1 bathroom & 1 kitchen in-kind.no walls moved. no change in (e) floor plan.Details
unit 3: remodel 1 bathroom & 1 kitchen in-kind.no walls moved. no change in (e) floor plan. | $40,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 190 Castro St | unit 2: remodel 1 bathroom in-kind.Details
unit 2: remodel 1 bathroom in-kind. | $15,000 |
| Apr 17, 2018 | Completed final sign-off Jul 2018 | 2912 Fillmore St | remodel bathroom in kind. no wall moving, no alteration of wall, window and door.Details
remodel bathroom in kind. no wall moving, no alteration of wall, window and door. | $12,000 |
| Jul 13, 2017 | Completed final sign-off Dec 2017 | 55 Exeter St | kitchen & bathroom remodel. add new stairs to garage.Details
kitchen & bathroom remodel. add new stairs to garage. | $50,000 |
| Apr 28, 2017 | Completed final sign-off Jun 2018 | 718 Joost Av | remodel interior 1 bath, kitchen, 1 bedroom, 1 dining rm & 1 living room. repair missing drywall. repair doors, windows if needed not visible from street. repair & update electrical & plumbing.Details
remodel interior 1 bath, kitchen, 1 bedroom, 1 dining rm & 1 living room. repair missing drywall. repair doors, windows if needed not visible from street. repair & update electrical & plumbing. | $40,000 |
| Apr 11, 2017 | Completed final sign-off Oct 2017 | 300 03rd St | remodel kitchen & bathroom in-kind. n/a for maher.Details
remodel kitchen & bathroom in-kind. n/a for maher. | $30,000 |
| Nov 16, 2016 | Completed final sign-off Feb 2017 | 2188 15th St | remodel of extg bathroom and washer and dryer. extension of extg wall to property line in lightwell. addition of new plumbing fixtures and finishes. structural work. replace an overhead (dryrot) beam between (e) kitchen & dining room in kind. revision to pa#201609289093Details
remodel of extg bathroom and washer and dryer. extension of extg wall to property line in lightwell. addition of new plumbing fixtures and finishes. structural work. replace an overhead (dryrot) beam between (e) kitchen & dining room in kind. revision to pa#201609289093 | $20,000 |
| Oct 7, 2016 | Completed final sign-off Apr 2017 | 744 29th Av | improve ground floor area to include adding a bedroom, den and full bathroom.Details
improve ground floor area to include adding a bedroom, den and full bathroom. | $50,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 1273 Mcallister St | remodel to (e) kitchen and bathroom. fixtures relocated in kitchen, new doors, new finishes, new outlets and kitchen task lighting. no structural work. all work located on second floor.Details
remodel to (e) kitchen and bathroom. fixtures relocated in kitchen, new doors, new finishes, new outlets and kitchen task lighting. no structural work. all work located on second floor. | $24,000 |
| Feb 4, 2016 | Completed final sign-off Aug 2019 | 2350 Market St | extension of upper residential unit on the westside. updating commercial space & leveling storefront ceiling. updating kitchen & bathrooms.Details
extension of upper residential unit on the westside. updating commercial space & leveling storefront ceiling. updating kitchen & bathrooms. | $200,000 |
| Feb 4, 2016 | Completed final sign-off Jul 2016 | 1422 Thomas Av | proposed remodel existing kitchen in kind on 2nd floor. add a new office & a new 1/2 bathroom on the existing attic area. rebuild existing damaged stairs at rear deck, interior stair replace 8 (e) windowsDetails
proposed remodel existing kitchen in kind on 2nd floor. add a new office & a new 1/2 bathroom on the existing attic area. rebuild existing damaged stairs at rear deck, interior stair replace 8 (e) windows | $80,000 |
| Dec 18, 2015 | Never finaled issued Dec 2015, no final | 1466 Revere Av | remodel existing bathroom in kind.Details
remodel existing bathroom in kind. | $10,000 |
| Sep 22, 2015 | Completed final sign-off Jan 2016 | 743 Ellsworth St | bathroom remodel. replace tub with shower pan, upgrade electrical & plumbing. to comply with nov 2015 67581Details
bathroom remodel. replace tub with shower pan, upgrade electrical & plumbing. to comply with nov 2015 67581 | $9,000 |
| Jun 15, 2015 | Expired or cancelled expired Jun 2021 | 2306 Castro St | revision to app#201310189745. new interior stair, coner window at facade, new skylights. 1st floor: excavate to increase ceiling hight. convert extg unconditoin space to habitable. master bed & bath. 2nd fl: structural & non-structural partition changes. remodel entire flr including kitchenDetails
revision to app#201310189745. new interior stair, coner window at facade, new skylights. 1st floor: excavate to increase ceiling hight. convert extg unconditoin space to habitable. master bed & bath. 2nd fl: structural & non-structural partition changes. remodel entire flr including kitchen | $70,000 |
| May 22, 2015 | Never finaled issued Jun 2015, no final | 47 Panorama Dr | reomdel existing bathroom in kind, (n) exhaust fan replacement. replace one damaged window on first floor in front to match existing aluminum window in kind, max. u-factor 0.32Details
reomdel existing bathroom in kind, (n) exhaust fan replacement. replace one damaged window on first floor in front to match existing aluminum window in kind, max. u-factor 0.32 | $9,000 |
| Mar 12, 2015 | Completed final sign-off Oct 2015 | 2642 40th Av | demo of ground floor walls + slab portions. construction of ground floor bedroom, full bath & rec. room, construction of 215 sq ft of new ground flr area under exist extension as a fam room. ground floor apppliance & fixture upgrades.Details
demo of ground floor walls + slab portions. construction of ground floor bedroom, full bath & rec. room, construction of 215 sq ft of new ground flr area under exist extension as a fam room. ground floor apppliance & fixture upgrades. | $90,000 |
| Dec 18, 2014 | Completed final sign-off Sep 2015 | 63 Topaz Wy | renovate kitchen, relocate bathroom, renovate full bath to full bath, new partition & door at family room.Details
renovate kitchen, relocate bathroom, renovate full bath to full bath, new partition & door at family room. | $40,000 |
| Sep 9, 2014 | Completed final sign-off Nov 2014 | 221 Lake St | bathroom remodel in same kind, remove finishes in bedroom, insulation, drywall, new lighting, new gas line.Details
bathroom remodel in same kind, remove finishes in bedroom, insulation, drywall, new lighting, new gas line. | $20,000 |
| Jan 3, 2014 | Completed final sign-off Apr 2014 | 1145 Pine St | unit #43: kitchen and bathroom remodel, replace in kindDetails
unit #43: kitchen and bathroom remodel, replace in kind | $10,000 |
| Dec 6, 2013 | Expired or cancelled expired Jan 2016 | 637 Powell St | kitchen remodel, master bathroom remodel, new electrical wiring. lighting to comply with cec 150 (k)Details
kitchen remodel, master bathroom remodel, new electrical wiring. lighting to comply with cec 150 (k) | $20,000 |
| Nov 6, 2013 | Completed final sign-off Jan 2014 | 567 27th St | unit # 3: remodel master bathroom, demo/replace new shower pan, tub, faucet, fan, outlets, toilet, vanity. no structural work.Details
unit # 3: remodel master bathroom, demo/replace new shower pan, tub, faucet, fan, outlets, toilet, vanity. no structural work. | $8,500 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 839 Garfield St | install fan in the bathroom. new lighting to be high efficiency.Details
install fan in the bathroom. new lighting to be high efficiency. | $1,500 |