Cormican Plastering Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Mar 2025
- Last 24 months
- 1 permit filed
20 permits since 2000: 17 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2012 | Never finaled issued Jul 2012, no final | 823 46th Av | remove stucco at staris 2 feet high by 15 feet long on left & right side of stairs to repair leak. repair wood if necessary. replace stucco & flash stairs to prevent leaking. replace in kind less than 50%Details
remove stucco at staris 2 feet high by 15 feet long on left & right side of stairs to repair leak. repair wood if necessary. replace stucco & flash stairs to prevent leaking. replace in kind less than 50% | $3,000 |