Back to kitchen remodel contractors
Continuum Construction
- Based in
- Novato
- On San Francisco permits
- Jun 2016 to May 2026
- Last 24 months
- 13 permits filed
33 permits since 2000: 24 completed, 6 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 3 in progress. Typically 28 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2026 | In progress issued Feb 2026 | 2745 Kirkham St | remodel of lower level; install new kitchenette, replace bathroom finishes, and addition of walk in closet.Details
remodel of lower level; install new kitchenette, replace bathroom finishes, and addition of walk in closet. | $24,000 |
| Nov 20, 2025 | In progress issued Dec 2025 | 359 Lexington St | revision to permit 202503273136. revise scope - reconfiguring the kitchen, dining room, bathroom, and laundry in unit 359 on 3/f.Details
revision to permit 202503273136. revise scope - reconfiguring the kitchen, dining room, bathroom, and laundry in unit 359 on 3/f. | |
| Mar 27, 2025 | In progress issued May 2025 | 359 Lexington St | 1/fl- (n) bathroom and interior stairs for unit 361 to first floor. remodel and reconfig of (e) kitchen, livng and dining and bathroom area in unit 359. (n) window and door openings at rear elevation. replacmeent in kind of (e) exterior egress stairs, and reconfig 8 windows and doors at rear.Details
1/fl- (n) bathroom and interior stairs for unit 361 to first floor. remodel and reconfig of (e) kitchen, livng and dining and bathroom area in unit 359. (n) window and door openings at rear elevation. replacmeent in kind of (e) exterior egress stairs, and reconfig 8 windows and doors at rear. | $88,000 |
| Feb 27, 2025 | Completed final sign-off Jun 2025 | 2 Corwin St | revision to pa# 202409251589: eliminate a post and beam as part of a kitchen remodel. creaste a storage room.Details
revision to pa# 202409251589: eliminate a post and beam as part of a kitchen remodel. creaste a storage room. | $5,000 |
| Sep 25, 2024 | Completed final sign-off Apr 2025 | 2 Corwin St | demo existing window and replace with larger at the rear of the kitchen.Details
demo existing window and replace with larger at the rear of the kitchen. | $1,500 |
| Sep 25, 2024 | Completed final sign-off Jun 2025 | 2 Corwin St | kitchen and pantry remodel. extend (e) pantry to back storage area. no structural work or expansion of building envelope.Details
kitchen and pantry remodel. extend (e) pantry to back storage area. no structural work or expansion of building envelope. | $47,435 |
| Sep 17, 2024 | Completed final sign-off Jan 2025 | 492 Bartlett St | revision to 202206176631 (2nd floor) and 202206136184 [which revised 201807114267](1st floor) including new configuration of existing interior partition walls and new bath and kitchen fixtures at existing locations. no exterior work, no additional sqft.Details
revision to 202206176631 (2nd floor) and 202206136184 [which revised 201807114267](1st floor) including new configuration of existing interior partition walls and new bath and kitchen fixtures at existing locations. no exterior work, no additional sqft. | $100,000 |
| May 17, 2023 | Completed final sign-off Dec 2023 | 289 Douglass St | revision to pa 2023-0222-2396 to include a new skylight; new (interior) guardrail in vreakfast area; new opening between kitchen & dining, shower & sinks in new primary bath.Details
revision to pa 2023-0222-2396 to include a new skylight; new (interior) guardrail in vreakfast area; new opening between kitchen & dining, shower & sinks in new primary bath. | $10,000 |
| Feb 22, 2023 | Completed final sign-off Oct 2023 | 289 Douglass St | interior remodel includes a new storage room, kitchen remodel, new primary closet and bath and a new shower tub in a existing bathroom.Details
interior remodel includes a new storage room, kitchen remodel, new primary closet and bath and a new shower tub in a existing bathroom. | $55,000 |
| May 3, 2022 | Completed final sign-off Feb 2023 | 1315 Minna St | remove structural wall in kitchen at top level. new fixtures and finishes in kitchen.Details
remove structural wall in kitchen at top level. new fixtures and finishes in kitchen. | $40,000 |