Conneely Construction
- Based in
- Daly City
- On San Francisco permits
- Apr 2013 to Jan 2026
- Last 24 months
- 6 permits filed
33 permits since 2000: 18 completed, 7 in progress, 8 never finaled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 67 days from filing to permit and 468 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2022 | Completed final sign-off Feb 2024 | 478 04th Av | remove and replace rear stairs in kind. add new foundation under rear of building.Details
remove and replace rear stairs in kind. add new foundation under rear of building. | $15,000 |
| Oct 17, 2019 | Never finaled issued Aug 2023, no final | 349 Banks St | repair of front stairs steps (less than 50% replacement).Details
repair of front stairs steps (less than 50% replacement). | $20,000 |
| Feb 16, 2018 | Completed final sign-off Jun 2019 | 2755 35th Av | existing sfd remodel to include 1st fl bedrm, rec room, bar area, laundry, 1 full bath. extend rear wall under 2nd fl overhang. 2nd fl bath remodel, relocation of interior stair, addition of rear wood deckDetails
existing sfd remodel to include 1st fl bedrm, rec room, bar area, laundry, 1 full bath. extend rear wall under 2nd fl overhang. 2nd fl bath remodel, relocation of interior stair, addition of rear wood deck | $80,000 |
| Oct 3, 2014 | Completed final sign-off Dec 2014 | 1452 24th Av | dry rot in front left side of building at stairway entry. new 2x6 framing, plywood, and stucco. not to exceed 150 square feet.Details
dry rot in front left side of building at stairway entry. new 2x6 framing, plywood, and stucco. not to exceed 150 square feet. | $4,000 |