Back to kitchen remodel contractors
Commercial Fire Protection Llc
- Based in
- Newport Beach
- On San Francisco permits
- Jun 2022 to Sep 2026
- Last 24 months
- 81 permits filed
229 permits since 2000: 175 completed, 50 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 2971 Clay St | as built to pa # 202502079883: relocate smoke detector from the kitchen to attic in #2975. adding waterflow dwitch to the equipment list.Details
as built to pa # 202502079883: relocate smoke detector from the kitchen to attic in #2975. adding waterflow dwitch to the equipment list. |