Back to bathroom remodel contractors
Cmg General Contractor
- Based in
- Hayward
- On San Francisco permits
- Aug 2022 to Jun 2026
- Last 24 months
- 3 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | Completed final sign-off Jul 2026 | 208 States St | unit 4: demo ceilings in bathroom, kitchen, living room, bedroom, and closets and install soundproof insulation, 5/8 type x drywall resilent channel insulation, second layer 5/8 drywall type x. tape, mud, and paint. all work interior. keep 1hr fire rating for all penetration.Details
unit 4: demo ceilings in bathroom, kitchen, living room, bedroom, and closets and install soundproof insulation, 5/8 type x drywall resilent channel insulation, second layer 5/8 drywall type x. tape, mud, and paint. all work interior. keep 1hr fire rating for all penetration. | $12,000 |
| Oct 21, 2024 | Completed final sign-off Mar 2025 | 626 Joost Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,100 |
| Aug 3, 2022 | Completed final sign-off Nov 2022 | 873 44th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 1st fl with 0 shower pan(s). | $54,300 |