Cmg General Contractor
- Based in
- Hayward
- On San Francisco permits
- Aug 2022 to Jun 2026
- Last 24 months
- 3 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | Completed final sign-off Jul 2026 | 208 States St | unit 4: demo ceilings in bathroom, kitchen, living room, bedroom, and closets and install soundproof insulation, 5/8 type x drywall resilent channel insulation, second layer 5/8 drywall type x. tape, mud, and paint. all work interior. keep 1hr fire rating for all penetration.Details
unit 4: demo ceilings in bathroom, kitchen, living room, bedroom, and closets and install soundproof insulation, 5/8 type x drywall resilent channel insulation, second layer 5/8 drywall type x. tape, mud, and paint. all work interior. keep 1hr fire rating for all penetration. | $12,000 |
| Oct 24, 2024 | Completed final sign-off Feb 2025 | 626 Joost Av | remove 7 windows and replace to new windows, same size no framing. the windows is on the front and back side. aluminum clad wood in frontDetails
remove 7 windows and replace to new windows, same size no framing. the windows is on the front and back side. aluminum clad wood in front | $8,400 |
| Oct 21, 2024 | Completed final sign-off Mar 2025 | 626 Joost Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,100 |
| Sep 18, 2024 | Completed final sign-off Mar 2025 | 626 Joost Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $11,200 |
| Feb 23, 2023 | Completed final sign-off May 2023 | 1447 32nd Av | to comply with nov #202303797. 16 new windows not adding just replaceing (street facing). replace 5 windows in front with aluminum clad.Details
to comply with nov #202303797. 16 new windows not adding just replaceing (street facing). replace 5 windows in front with aluminum clad. | $17,000 |
| Feb 23, 2023 | Completed final sign-off May 2023 | 1447 32nd Av | paint interior, clean out backyard, refinish floor and placement of mulch in the backyard.Details
paint interior, clean out backyard, refinish floor and placement of mulch in the backyard. | $5,200 |
| Aug 3, 2022 | Completed final sign-off Nov 2022 | 873 44th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 1st fl with 0 shower pan(s). | $54,300 |