Back to bathroom remodel contractors
Closets Van Go Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jun 2009 to Dec 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 380 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2009 | Completed final sign-off Jul 2010 | 229 Montcalm St | revision to pa# 2009-0619-0872-infill (e) skylight location & move skylight completely inside bathroom, change 2'-8" pocket doors 2 to 2'-6" pocket doors. change window in bathroom.Details
revision to pa# 2009-0619-0872-infill (e) skylight location & move skylight completely inside bathroom, change 2'-8" pocket doors 2 to 2'-6" pocket doors. change window in bathroom. | $1,000 |
| Jun 19, 2009 | Completed final sign-off Jul 2010 | 229 Montcalm St | master bath remodel on 3rd fl. add jacuzzi tub, new vanity, tile shower, move toilet, move wall for mater closet, new lighting.Details
master bath remodel on 3rd fl. add jacuzzi tub, new vanity, tile shower, move toilet, move wall for mater closet, new lighting. | $22,000 |