Block 5539, lot 032
229 Montcalm St
- City’s use
- Single Family Residential
- Built
- 1987
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 3,784 sq ft
- Lot
- 2,336 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2025 | Completed final sign-off Nov 2025 | 229 Montcalm St | Appetite For Construction Inc | demo 300 sq ft of water damaged siding; replace in-kind. minor dry rot repair. visible from street.Details
demo 300 sq ft of water damaged siding; replace in-kind. minor dry rot repair. visible from street. | $10,000 |
| Nov 7, 2016 | Completed final sign-off Oct 2017 | 229 Montcalm St | Jim Crone Construction | remodel master bathroom, (n) tub, tolet, vanity, lights, flooring. remodel guest bathroom - (n) tub/shower - vanity and tilet, new light fixtures. rmove (e) stair handrail, guardrail and install new. repair drywall as needed and retexture entire dwelling. extend (length only)Details
remodel master bathroom, (n) tub, tolet, vanity, lights, flooring. remodel guest bathroom - (n) tub/shower - vanity and tilet, new light fixtures. rmove (e) stair handrail, guardrail and install new. repair drywall as needed and retexture entire dwelling. extend (length only) | $75,000 |
| Jul 7, 2009 | Completed final sign-off Jul 2010 | 229 Montcalm St | Closets Van Go Inc. | revision to pa# 2009-0619-0872-infill (e) skylight location & move skylight completely inside bathroom, change 2'-8" pocket doors 2 to 2'-6" pocket doors. change window in bathroom.Details
revision to pa# 2009-0619-0872-infill (e) skylight location & move skylight completely inside bathroom, change 2'-8" pocket doors 2 to 2'-6" pocket doors. change window in bathroom. | $1,000 |
| Jun 19, 2009 | Completed final sign-off Jul 2010 | 229 Montcalm St | Closets Van Go Inc. | master bath remodel on 3rd fl. add jacuzzi tub, new vanity, tile shower, move toilet, move wall for mater closet, new lighting.Details
master bath remodel on 3rd fl. add jacuzzi tub, new vanity, tile shower, move toilet, move wall for mater closet, new lighting. | $22,000 |
| Apr 23, 2008 | Completed final sign-off Jun 2008 | 229 Montcalm St | Home Works Inc/Kitchen Work Inc | replace 20 windows. size for size. aluminum to wood composite. visible from street. u factor 0.39.Details
replace 20 windows. size for size. aluminum to wood composite. visible from street. u factor 0.39. | $49,000 |
| Jul 18, 2007 | Completed final sign-off Aug 2007 | 229 Montcalm St | Home Works Inc/Kitchen Work Inc | replace 4 windows, size for size, alum to wood composite, visible from street. no structural workDetails
replace 4 windows, size for size, alum to wood composite, visible from street. no structural work | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Closets Van Go Inc. (2), Home Works Inc/Kitchen Work Inc (2), Appetite For Construction Inc, Jim Crone Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.