Back to kitchen remodel contractors
Clayton Valley Construction, Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Apr 2014
- Last 24 months
- 0 permits filed
25 permits since 2000: 20 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2014 | Completed final sign-off Jun 2014 | 3626 Ulloa St | kitchen remodel --remove (e) cabinets & drywall, install insulation , new drywall, dabinets, counters, fixtures. to comply with cec 150(k) 8Details
kitchen remodel --remove (e) cabinets & drywall, install insulation , new drywall, dabinets, counters, fixtures. to comply with cec 150(k) 8 | $28,000 |
| May 23, 2012 | Never finaled issued Jun 2012, no final | 3432 Ulloa St | remodel (e) kitchen & change (e) closet to be bathroom & cover partial patio at 2nd floor per planDetails
remodel (e) kitchen & change (e) closet to be bathroom & cover partial patio at 2nd floor per plan | $20,000 |
| Apr 22, 2009 | Completed final sign-off Jan 2010 | 65 Cuvier St | replace shingle roof with new 3/4" plywood, new flashings and shingles, replace kitchen cabinets and counters, new electrical and drywall, nailing: 4" on edge & 6" in field with common nailsDetails
replace shingle roof with new 3/4" plywood, new flashings and shingles, replace kitchen cabinets and counters, new electrical and drywall, nailing: 4" on edge & 6" in field with common nails | $32,600 |
| Mar 3, 2009 | Completed final sign-off Nov 2009 | 2271 Bay St | demo e kitchen and baths at 2nd flr,enlarge opening to dining room, fill in e 4x12 west light/roof court with new 48 sq ft addition, new prop line walls with 45min rated glass block (masonry) panels, kitchen and bath remodel, 1 new full bathDetails
demo e kitchen and baths at 2nd flr,enlarge opening to dining room, fill in e 4x12 west light/roof court with new 48 sq ft addition, new prop line walls with 45min rated glass block (masonry) panels, kitchen and bath remodel, 1 new full bath | $45,000 |
| Feb 16, 2007 | Completed final sign-off Nov 2007 | 711 Lincoln Wy | replace kitchen avinets and applian es to five units replace bathroom fkixtures and tile to four unkts replace windows sashes to one unit to match surroundings #2, add new hardwood floors to one unit #1Details
replace kitchen avinets and applian es to five units replace bathroom fkixtures and tile to four unkts replace windows sashes to one unit to match surroundings #2, add new hardwood floors to one unit #1 | $60,000 |