City Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2012
- Last 24 months
- 0 permits filed
56 permits since 2000: 50 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2012 | Expired or cancelled expired Apr 2015 | 1009 Irving St | repair/replace broken and deteriorated rear exit stairs approx. 5 broken steps and 1 handrail. less than 50% in kind. complaint #201206702. same for same.Details
repair/replace broken and deteriorated rear exit stairs approx. 5 broken steps and 1 handrail. less than 50% in kind. complaint #201206702. same for same. | $950 |
| Sep 4, 2007 | Completed final sign-off Nov 2007 | 226 Holloway Av | repair the cover for the extg wndw where mission in the front bedroom/repair the wndw in the front living rm.repair the water damage on the top & middle of stringer. secure handguard at the rear stairway and inside stairway/to comply with his nov #200706341 dated 6/25/2007 & nov #200709676 6/25/07Details
repair the cover for the extg wndw where mission in the front bedroom/repair the wndw in the front living rm.repair the water damage on the top & middle of stringer. secure handguard at the rear stairway and inside stairway/to comply with his nov #200706341 dated 6/25/2007 & nov #200709676 6/25/07 | $600 |
| Jun 5, 2006 | Completed final sign-off Aug 2006 | 806 42nd Av | repair dry rot at the left side of the front stairway approx. 3 ft by 10 ft.Details
repair dry rot at the left side of the front stairway approx. 3 ft by 10 ft. | $1,800 |
| Jul 6, 2004 | Completed final sign-off Jul 2004 | 6031 California St | as built drawing for final inspection for rear stairs at 6031-6033 california st see app200406146332Details
as built drawing for final inspection for rear stairs at 6031-6033 california st see app200406146332 | |
| Dec 31, 2001 | Completed final sign-off Feb 2002 | 2294 Filbert St | repair rear stairs, dryrot, repair in kind less than 50% replacementDetails
repair rear stairs, dryrot, repair in kind less than 50% replacement | $5,000 |
| Sep 6, 2001 | Completed final sign-off Mar 2002 | 1263 45th Av | revision 9908435 remove interior stairs betwn 1st/ 2nd floor. 4th floor interior rooms revisionDetails
revision 9908435 remove interior stairs betwn 1st/ 2nd floor. 4th floor interior rooms revision |