Back to kitchen remodel contractors
Chun Sheng Huang
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Aug 2022
- Last 24 months
- 0 permits filed
21 permits since 2000: 15 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 6 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2015 | Completed final sign-off Nov 2015 | 2638 47th Av | remodel kitchen and bathroom on 2nd floor. add family room, a bedroom and a full bathroom on 1st floor. legalize rear deck and construct new stair for the deck. reduce extg storage shed to under 100 sq ft.Details
remodel kitchen and bathroom on 2nd floor. add family room, a bedroom and a full bathroom on 1st floor. legalize rear deck and construct new stair for the deck. reduce extg storage shed to under 100 sq ft. | $50,000 |
| Jul 29, 2014 | Completed final sign-off Jun 2015 | 214 Broad St | to add 2 bedroom, 2 full bathroom, one laundry room & one storage on (e) ground floor per plan. remodel existing kitchen & 2 full bathroom on 2nd flr, replace existing 4 windows in kind at rear on ground floor per plan.Details
to add 2 bedroom, 2 full bathroom, one laundry room & one storage on (e) ground floor per plan. remodel existing kitchen & 2 full bathroom on 2nd flr, replace existing 4 windows in kind at rear on ground floor per plan. | $70,000 |
| Jan 27, 2014 | Never finaled issued Jan 2014, no final | 2331 33rd Av | remove illegal kitchen on ground floor playroom area. (remove cabinet, counter, stove, sink to source) per plan.Details
remove illegal kitchen on ground floor playroom area. (remove cabinet, counter, stove, sink to source) per plan. | $1,000 |
| Sep 10, 2012 | Completed final sign-off Dec 2012 | 4024 Moraga St | remodel the kitchen: replace the electrical panel and repair the front stairwell, both side stucco.Details
remodel the kitchen: replace the electrical panel and repair the front stairwell, both side stucco. | $15,000 |
| Nov 3, 2009 | Never finaled issued Nov 2009, no final | 226 Saint Charles Av | add 16 recessed lights in living room, kitchen dining room 2nd flr. constrolled by dimmer and hg. replace drywallDetails
add 16 recessed lights in living room, kitchen dining room 2nd flr. constrolled by dimmer and hg. replace drywall | $4,500 |
| Nov 2, 2009 | Completed final sign-off Apr 2010 | 226 Saint Charles Av | add 2 bedrooms, 2 full bathrooms & one storage @ existing ground floor, add one full bathroom & remodel existing kitchen & bathroom on 2nd floor. replace plumbing, lighting, counter top, cabinets, bath tub, toilet & sink.Details
add 2 bedrooms, 2 full bathrooms & one storage @ existing ground floor, add one full bathroom & remodel existing kitchen & bathroom on 2nd floor. replace plumbing, lighting, counter top, cabinets, bath tub, toilet & sink. | $60,000 |
| Aug 28, 2007 | Expired or cancelled cancelled Feb 2016 | 945 Corbett Av | unit#307.remodel kitchen (floor tile and cabinets) remodel bathroom (change vanity ,floor tile, shower tile). min 50% of kitchen lighting wattage must be fluorescent. provide fluorescent lights or occupancy sensor in bathroom.Details
unit#307.remodel kitchen (floor tile and cabinets) remodel bathroom (change vanity ,floor tile, shower tile). min 50% of kitchen lighting wattage must be fluorescent. provide fluorescent lights or occupancy sensor in bathroom. | $10,000 |
| Mar 28, 2007 | Completed final sign-off Aug 2007 | 533 Elizabeth St | remodel one kitchen, two bathrooms, install eight recess lights in living room. comply with energy code title 24.Details
remodel one kitchen, two bathrooms, install eight recess lights in living room. comply with energy code title 24. | $20,900 |
| Feb 24, 2006 | Completed final sign-off Apr 2006 | 280 28th St | replace cabinet, counter top in 1 bathroom & 6 recesses light in living room. 1 kitchen & 1 bath remodel.Details
replace cabinet, counter top in 1 bathroom & 6 recesses light in living room. 1 kitchen & 1 bath remodel. | $12,000 |