Chen Herman Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2022 to Oct 2025
- Last 24 months
- 4 permits filed
16 permits since 2000: 13 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 14 days from filing to permit and 411 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2023 | Completed final sign-off Oct 2024 | 648 16th Av | to comply with nov 202308445. replace fire damaged wood siding and remove wood (interior) stairway at lightwell south side of bldg. 1/f: remodel (e) bar area, 2 bathrooms, family room, and replace ceiling joists at family room, bar area and baths. 2/f: replace fire damaged plumbing pipes, gas pipeDetails
to comply with nov 202308445. replace fire damaged wood siding and remove wood (interior) stairway at lightwell south side of bldg. 1/f: remodel (e) bar area, 2 bathrooms, family room, and replace ceiling joists at family room, bar area and baths. 2/f: replace fire damaged plumbing pipes, gas pipe | $80,000 |