Back to bathroom remodel contractors
Chapman Structural Inc.
- Based in
- San Mateo
- On San Francisco permits
- Dec 2016 to Mar 2020
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 52 days from filing to permit and 1532 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2019 | Completed final sign-off Aug 2023 | 3627 Webster St | recofigure layout of bathrooms. (n) master bathroom. convert powder room into full bath. reconfigure hallway, expand closet, new entry for master bedroom.Details
recofigure layout of bathrooms. (n) master bathroom. convert powder room into full bath. reconfigure hallway, expand closet, new entry for master bedroom. | $55,000 |
| Oct 15, 2018 | Completed final sign-off Aug 2020 | 448 Lyon St | reconfigure layout on 2nd & 3rd flrs; at 2nd floor, renovate (e) full bath, relocate master suite from 3rd to 2nd. relocate kitchen to 3rd fl; add 1/2 bath at 3rd floor w/(n) roof dormer, some (n) lighting, roof framing replacement on interior w/ (n) scissor truss system. replace 9 windows at front.Details
reconfigure layout on 2nd & 3rd flrs; at 2nd floor, renovate (e) full bath, relocate master suite from 3rd to 2nd. relocate kitchen to 3rd fl; add 1/2 bath at 3rd floor w/(n) roof dormer, some (n) lighting, roof framing replacement on interior w/ (n) scissor truss system. replace 9 windows at front. | $400,000 |
| Jun 8, 2018 | Completed final sign-off May 2024 | 15 Woodland Av | work at lwr level garage to create larger storage and workroom with new bathroom, increased width & height of (e) garage door, retrofit (e) foundationDetails
work at lwr level garage to create larger storage and workroom with new bathroom, increased width & height of (e) garage door, retrofit (e) foundation | $120,000 |