Chapman Structural Inc.
- Based in
- San Mateo
- On San Francisco permits
- Dec 2016 to Mar 2020
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2020 | Expired or cancelled expired Dec 2023 | 15 Woodland Av | to comply with nov 202013811 add new front door access for garage and window for extra natural light at front elevationDetails
to comply with nov 202013811 add new front door access for garage and window for extra natural light at front elevation | $7,500 |
| Nov 21, 2019 | Completed final sign-off Sep 2022 | 442 Lyon St | replace existing foundation, renovate existing first floor, new windows & sliding glass door. renew bpa 200712100015 for final inspection - all work is complete.Details
replace existing foundation, renovate existing first floor, new windows & sliding glass door. renew bpa 200712100015 for final inspection - all work is complete. | $300,000 |
| Sep 10, 2019 | Completed final sign-off Aug 2020 | 448 Lyon St | revision to app#201810153233 structural roof/truss plan no longer applies. we are using existing roof raftersDetails
revision to app#201810153233 structural roof/truss plan no longer applies. we are using existing roof rafters | $500 |
| Jun 20, 2019 | Completed final sign-off Aug 2020 | 448 Lyon St | rev 201810153233, powder room/level 3Details
rev 201810153233, powder room/level 3 | |
| Jun 12, 2019 | Completed final sign-off Aug 2023 | 3627 Webster St | recofigure layout of bathrooms. (n) master bathroom. convert powder room into full bath. reconfigure hallway, expand closet, new entry for master bedroom.Details
recofigure layout of bathrooms. (n) master bathroom. convert powder room into full bath. reconfigure hallway, expand closet, new entry for master bedroom. | $55,000 |
| Oct 15, 2018 | Completed final sign-off Aug 2020 | 448 Lyon St | reconfigure layout on 2nd & 3rd flrs; at 2nd floor, renovate (e) full bath, relocate master suite from 3rd to 2nd. relocate kitchen to 3rd fl; add 1/2 bath at 3rd floor w/(n) roof dormer, some (n) lighting, roof framing replacement on interior w/ (n) scissor truss system. replace 9 windows at front.Details
reconfigure layout on 2nd & 3rd flrs; at 2nd floor, renovate (e) full bath, relocate master suite from 3rd to 2nd. relocate kitchen to 3rd fl; add 1/2 bath at 3rd floor w/(n) roof dormer, some (n) lighting, roof framing replacement on interior w/ (n) scissor truss system. replace 9 windows at front. | $400,000 |
| Sep 25, 2018 | Expired or cancelled expired May 2024 | 15 Woodland Av | revision to pa 201806081436. revision to geotech temp shoring and structural for sectional pours required at property line.Details
revision to pa 201806081436. revision to geotech temp shoring and structural for sectional pours required at property line. | |
| Sep 7, 2018 | Expired or cancelled withdrawn Apr 2024 | 15 Woodland Av | temporary shoring to complete work on permit #201806081436 at garageDetails
temporary shoring to complete work on permit #201806081436 at garage | $1,000 |
| Jun 8, 2018 | Completed final sign-off May 2024 | 15 Woodland Av | work at lwr level garage to create larger storage and workroom with new bathroom, increased width & height of (e) garage door, retrofit (e) foundationDetails
work at lwr level garage to create larger storage and workroom with new bathroom, increased width & height of (e) garage door, retrofit (e) foundation | $120,000 |
| Dec 7, 2016 | Completed final sign-off Apr 2017 | 1357 Masonic Av | strengthen (e) cantilevered framingDetails
strengthen (e) cantilevered framing | $8,000 |