Back to kitchen remodel contractors
Chang Chao Ming Constr
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Jun 2024
- Last 24 months
- 0 permits filed
27 permits since 2000: 25 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 86 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2024 | Completed final sign-off Nov 2025 | 3020 Kirkham St | project proposes an infill of an (e) 1st stroy courtyard/lightwell @ the interior of the property (not visible from street). interior kitchen & bathroom remodels. (n) bathroom & interior stairs. (n) finishes & fixtures throughout the area of work. mep & lighting under separate permitDetails
project proposes an infill of an (e) 1st stroy courtyard/lightwell @ the interior of the property (not visible from street). interior kitchen & bathroom remodels. (n) bathroom & interior stairs. (n) finishes & fixtures throughout the area of work. mep & lighting under separate permit | $290,000 |
| May 16, 2024 | Completed final sign-off Jul 2025 | 579 34th Av | interior kitchen and bathroom remodels. new bathroom, interior stair, and flat roof infill at main level (not visible from the street). new finishes and fixtures throughout area of work. mechanical, electrical, lighting and plumbing shall be part of a separate permit as needed.Details
interior kitchen and bathroom remodels. new bathroom, interior stair, and flat roof infill at main level (not visible from the street). new finishes and fixtures throughout area of work. mechanical, electrical, lighting and plumbing shall be part of a separate permit as needed. | $220,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2019 | 238 Alma St | front: interior upgrades to kitchen cabinets, appliances, new wood & tile floring, (n) washer/dryer, (n) appliances, (n) exhaust hood, (n) recessed led lighting, painting, upgrades to electrical & plumbing.Details
front: interior upgrades to kitchen cabinets, appliances, new wood & tile floring, (n) washer/dryer, (n) appliances, (n) exhaust hood, (n) recessed led lighting, painting, upgrades to electrical & plumbing. | $85,000 |
| Sep 22, 2016 | Completed final sign-off Nov 2016 | 1854 Vallejo St | pass-through "window" to be constructed between kitchen and dining rooms. new light fixtures installed in dining room.Details
pass-through "window" to be constructed between kitchen and dining rooms. new light fixtures installed in dining room. | |
| Nov 25, 2015 | Completed final sign-off Mar 2019 | 1854 Vallejo St | unit #f only: including 1)remodel kitchen, 2) remodel 3 extg bathrooms. 3)reconfigure hall and bedroom, 4) repair sitting room and 5) install 4 new skylights. total remodel area = 512 sq ft.Details
unit #f only: including 1)remodel kitchen, 2) remodel 3 extg bathrooms. 3)reconfigure hall and bedroom, 4) repair sitting room and 5) install 4 new skylights. total remodel area = 512 sq ft. | $61,440 |
| Sep 9, 2015 | Completed final sign-off Aug 2016 | 2578 29th Av | kitchen & 2 baths remodel, add power room, enclosed (e) courtyard with new skylight. re-build interior stair, replace window opening with new patio ddoor, add 1/f bathroom.Details
kitchen & 2 baths remodel, add power room, enclosed (e) courtyard with new skylight. re-build interior stair, replace window opening with new patio ddoor, add 1/f bathroom. | $140,000 |
| Feb 5, 2015 | Completed final sign-off May 2015 | 1854 Vallejo St | #e: remodel kitchen and adjacents bath; remove/replace cabinets -fixtures in kind.Details
#e: remodel kitchen and adjacents bath; remove/replace cabinets -fixtures in kind. | $5,000 |
| Sep 14, 2011 | Completed final sign-off May 2012 | 420 Baker St | interior remodel units 1 and 4. convert 1 bedroom to 2 bedrms, relocation of kitchen, adding a toilet and w/d. remove a wall and replacement of partial foundation in garageDetails
interior remodel units 1 and 4. convert 1 bedroom to 2 bedrms, relocation of kitchen, adding a toilet and w/d. remove a wall and replacement of partial foundation in garage | $65,000 |