Ces Controlled Environmental Services
- Based in
- Oakley
- On San Francisco permits
- Mar 2003 to Aug 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 11 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2017 | Completed final sign-off Nov 2017 | 1095 Indiana St | replacement of 3 existing fuel dispensers. installtion of new dispensers will include modification of existing under dispenser containment system is connected to existing underground storage tanksDetails
replacement of 3 existing fuel dispensers. installtion of new dispensers will include modification of existing under dispenser containment system is connected to existing underground storage tanks | $10,000 |
| Aug 30, 2017 | Completed final sign-off Jun 2018 | 1399 Marin St | replacement of (e) fuel dispenser. installation of new dispenser will include new under dispenser containment (udc) system is connected to existing above ground diesel tanksDetails
replacement of (e) fuel dispenser. installation of new dispenser will include new under dispenser containment (udc) system is connected to existing above ground diesel tanks | $10,000 |
| Apr 7, 2017 | Completed final sign-off May 2017 | 151 Beach St | relocation of one (1) existing diesel fuel dispenser #6 from under canopy to outside in tank enclosed area due prep for future tank and dispenser upgrade work in 2018, associated plumbing/wiring. n/a ordinance #155-13Details
relocation of one (1) existing diesel fuel dispenser #6 from under canopy to outside in tank enclosed area due prep for future tank and dispenser upgrade work in 2018, associated plumbing/wiring. n/a ordinance #155-13 | $25,000 |
| Feb 8, 2017 | Expired or cancelled cancelled Sep 2023 | 2301 Stockton St | relocate (e) 8,000 gal. ast empty & disconnect (e) 8,000 gallon above ground diesel storage tank. construct new concrete foundation tank pad with crash bollards. extend (e) fuel piping to new ast location. reinstall 8,000 gallon ast on new concrete foundation pad in new location.Details
relocate (e) 8,000 gal. ast empty & disconnect (e) 8,000 gallon above ground diesel storage tank. construct new concrete foundation tank pad with crash bollards. extend (e) fuel piping to new ast location. reinstall 8,000 gallon ast on new concrete foundation pad in new location. | $60,000 |
| Sep 1, 2015 | Never finaled issued Sep 2015, no final | 1301 Cesar Chavez St | repair of damaged existing fiberglass double wall fuel oil piping because of fuel weep on (e) underground diesel storage tank piping. maher naDetails
repair of damaged existing fiberglass double wall fuel oil piping because of fuel weep on (e) underground diesel storage tank piping. maher na | $12,500 |
| Sep 12, 2013 | Completed final sign-off Oct 2013 | 1095 Indiana St | remove and replace 6 ea 5 gallon spill buckets, concrete and rebar, per engineer specsDetails
remove and replace 6 ea 5 gallon spill buckets, concrete and rebar, per engineer specs | $85,000 |
| Sep 9, 2011 | Completed final sign-off Dec 2011 | 151 Beach St | remove and replace 5 gallon deisel fuel spill buckets on two - 20,000 gallon tanks, concrete and rebar.Details
remove and replace 5 gallon deisel fuel spill buckets on two - 20,000 gallon tanks, concrete and rebar. | $25,396 |
| Feb 8, 2010 | Completed final sign-off Aug 2010 | 1940 Harrison St | replace existing diesel fuel dispensing units (4) each. replace/reoute portions of existing steel fuel piping. remove piping from trench and relocate to overhead. replace concrete covers.Details
replace existing diesel fuel dispensing units (4) each. replace/reoute portions of existing steel fuel piping. remove piping from trench and relocate to overhead. replace concrete covers. | $140,000 |
| Feb 8, 2006 | Never finaled issued Feb 2006, no final | 1095 Indiana St | removal and installation of fuel piping at the turbine sump of muri wood facility amnufacturerDetails
removal and installation of fuel piping at the turbine sump of muri wood facility amnufacturer | $110,000 |
| Apr 21, 2004 | Expired or cancelled cancelled Mar 2007 | 151 Beach St | alterrations to (e) diesel fuel piping from underground storage tanks to dispensers, install new 3"Details
alterrations to (e) diesel fuel piping from underground storage tanks to dispensers, install new 3" | $18,000 |
| Dec 12, 2003 | Completed final sign-off Apr 2004 | 1298 Ocean Av | demolish a auto repair garageDetails
demolish a auto repair garage | |
| May 28, 2003 | Completed final sign-off Jun 2003 | 99 Harding Rd | demolish one story maintenance buildingDetails
demolish one story maintenance building | |
| May 28, 2003 | Completed final sign-off Jun 2003 | 99 Harding Rd | demolish one story restaurantDetails
demolish one story restaurant | |
| May 28, 2003 | Completed final sign-off Jun 2003 | 99 Harding Rd | to demolish a bathroomDetails
to demolish a bathroom | |
| Mar 6, 2003 | Completed final sign-off Jun 2003 | 99 Harding Rd | demolish a one story golf course club houseDetails
demolish a one story golf course club house |