Back to kitchen remodel contractors
Century Design & Construction
- Based in
- Burlingame
- On San Francisco permits
- Jun 2000 to Aug 2012
- Last 24 months
- 0 permits filed
77 permits since 2000: 56 completed, 9 never finaled, 12 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 13 completed, 1 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2012 | Completed final sign-off Jan 2013 | 1051 Shotwell St | remodel kitchen & bath, new sheetrock, new floor, paint. 6 openings approx 5'x10', remove & replace sheetrock for exploratory reasons throughout house.Details
remodel kitchen & bath, new sheetrock, new floor, paint. 6 openings approx 5'x10', remove & replace sheetrock for exploratory reasons throughout house. | $18,000 |
| Feb 21, 2012 | Completed final sign-off Feb 2013 | 1508 Diamond St | project is to raise the roof 1'-1" (@ centerline) @ the front part of the house over the kitchen, dining rm & living rm. the ceiling will also be raised, a (n) skylight installed & (n) slightly larger windows installed @ the front.Details
project is to raise the roof 1'-1" (@ centerline) @ the front part of the house over the kitchen, dining rm & living rm. the ceiling will also be raised, a (n) skylight installed & (n) slightly larger windows installed @ the front. | $20,000 |
| Nov 7, 2011 | Completed final sign-off Jan 2013 | 986 Ashbury St | at 2/f(#986), remodel kitchen & bath, (n) bath, (n) laundry closet, (n) ext. windows, (n) insulation & (n) lighting.Details
at 2/f(#986), remodel kitchen & bath, (n) bath, (n) laundry closet, (n) ext. windows, (n) insulation & (n) lighting. | $42,000 |
| Nov 7, 2011 | Completed final sign-off Jan 2013 | 984 Ashbury St | at 1/f (#984), remodel kitchen & bath, (n) bath, (n) laundry closet, (n) ext. windows, (n) insulation & (n) lighting. at g/f common space: (n) flooring, (n) sheetrock in (e) storage area, (n) bedroom & footing.Details
at 1/f (#984), remodel kitchen & bath, (n) bath, (n) laundry closet, (n) ext. windows, (n) insulation & (n) lighting. at g/f common space: (n) flooring, (n) sheetrock in (e) storage area, (n) bedroom & footing. | $44,000 |
| Oct 25, 2010 | Completed final sign-off Feb 2011 | 215 Corbett Av | unit #1: remodel kitchen and bathroom with in one unit of 4 units bldg. to include new insulation and sound board. 2 replacement windows and new lights.Details
unit #1: remodel kitchen and bathroom with in one unit of 4 units bldg. to include new insulation and sound board. 2 replacement windows and new lights. | $28,000 |
| Jan 15, 2010 | Completed final sign-off Jul 2012 | 162 Landers St | three stories (n) horizontal addition, and one story (n) vertical addition , gut remodel of interior, inclulding (n) kitchen, bathroom, foundation work, rear deck, (n) electrical, mechanical, plumbing, windows, doors, insulation & roof deck.Details
three stories (n) horizontal addition, and one story (n) vertical addition , gut remodel of interior, inclulding (n) kitchen, bathroom, foundation work, rear deck, (n) electrical, mechanical, plumbing, windows, doors, insulation & roof deck. | $410,000 |
| Feb 9, 2009 | Completed final sign-off May 2011 | 140 Saint Germain Av | gut remodel of (e) living space & new ground level living space. expansion of 2nd level living space to include new foundation, kitchen, bathrooms, windows & doors. plumbing, electrical & heating. new roof, exterior deck, entry & courtyards. approved by planning-20081099vDetails
gut remodel of (e) living space & new ground level living space. expansion of 2nd level living space to include new foundation, kitchen, bathrooms, windows & doors. plumbing, electrical & heating. new roof, exterior deck, entry & courtyards. approved by planning-20081099v | $530,000 |
| May 24, 2007 | Completed final sign-off Oct 2007 | 41 Ord St | interior remodel to include n kitchen, same location. n 1/2 bath and laundry. replace windows and sliding doorDetails
interior remodel to include n kitchen, same location. n 1/2 bath and laundry. replace windows and sliding door | $21,500 |
| Apr 26, 2007 | Completed final sign-off Apr 2009 | 180 Liberty St | extend depth of garage under (e) 2nd floor. excavate at rear of garage & extend habitable space with new interior stairs from 2nd floor-all within perimeter of 2nd floor above. replace rear deck with new configuration. remodel kitchen & family room.Details
extend depth of garage under (e) 2nd floor. excavate at rear of garage & extend habitable space with new interior stairs from 2nd floor-all within perimeter of 2nd floor above. replace rear deck with new configuration. remodel kitchen & family room. | $325,000 |
| Mar 5, 2007 | Completed final sign-off Jun 2007 | 171 Pinehurst Wy | remodel one bathroom, replace an fixtures replace one window. remodel kitchen. includes cabinet & fixtures. repair front porch & steps. less than 50% of stairway. replace walkway from concrete to brick in kind on private property.Details
remodel one bathroom, replace an fixtures replace one window. remodel kitchen. includes cabinet & fixtures. repair front porch & steps. less than 50% of stairway. replace walkway from concrete to brick in kind on private property. | $9,000 |
| Aug 11, 2006 | Completed final sign-off Sep 2006 | 3342 21st St | condo convertion per 3r-report by march 10.2006 correct 3 kitchens per code & common areas per code & inspection. report #3r-4437.Details
condo convertion per 3r-report by march 10.2006 correct 3 kitchens per code & common areas per code & inspection. report #3r-4437. | $10,000 |
| Jun 24, 2004 | Expired or cancelled expired Feb 2007 | 4324 21st St | site permit appln to replace kitchen patio and to add second floor containing new bedrm bathrm closeDetails
site permit appln to replace kitchen patio and to add second floor containing new bedrm bathrm close | $99,000 |
| Jun 23, 2003 | Never finaled issued Jun 2003, no final | 1150 Lombard St | replaceone door in the kitchen and dining room, add 2 lights in 1st floor and 4 lights in 2nd floorDetails
replaceone door in the kitchen and dining room, add 2 lights in 1st floor and 4 lights in 2nd floor | $8,000 |
| May 20, 2003 | Completed final sign-off Sep 2003 | 431 Peru Av | remodel kitchen include elec,gfci plug,plug,plumbing,replace one kitchen door,cabinet.partial sheetDetails
remodel kitchen include elec,gfci plug,plug,plumbing,replace one kitchen door,cabinet.partial sheet | $19,000 |
| Oct 4, 2002 | Completed final sign-off Dec 2002 | 137 Nueva Av | kitchen remodeling. replace all kitchen cabinets.upgrade counter outlet w/ gfci per city inspection.Details
kitchen remodeling. replace all kitchen cabinets.upgrade counter outlet w/ gfci per city inspection. | $8,000 |
| Aug 29, 2001 | Expired or cancelled expired Feb 2002 | 1940 20th Av | remodel kitchen & bathroom, (replace existing fixtures), replace existing plaster for living room, dDetails
remodel kitchen & bathroom, (replace existing fixtures), replace existing plaster for living room, d | $18,000 |