Back to kitchen remodel contractors
Central Valley Family Construction Inc.
- Based in
- So. Sf
- On San Francisco permits
- Jun 2012 to Aug 2013
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 expired or cancelled. Typically 4 days from filing to permit and 272 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2013 | Completed final sign-off Sep 2014 | 515 20th Av | 1st fl: lower slab by 1'. add family rm and full bath. 2nd fl relocate kitchen add 1/2 bath. remodel living rm,dining rm. 3rd fl: convert 2 bedrooms/1 bath,den to 3 bedrooms, 3 baths. remove entire house plaster/lath and replace with 5/8" type x gyp boardDetails
1st fl: lower slab by 1'. add family rm and full bath. 2nd fl relocate kitchen add 1/2 bath. remodel living rm,dining rm. 3rd fl: convert 2 bedrooms/1 bath,den to 3 bedrooms, 3 baths. remove entire house plaster/lath and replace with 5/8" type x gyp board | $150,000 |
| Apr 3, 2013 | Completed final sign-off Mar 2014 | 1710 17th Av | ground floor: add hall area, 2nd floor: in -fill light well area, add full bath, relocate (e) bath & remodel kitchen.legalize (e) bedroom and bath on ground flr.Details
ground floor: add hall area, 2nd floor: in -fill light well area, add full bath, relocate (e) bath & remodel kitchen.legalize (e) bedroom and bath on ground flr. | $115,000 |
| Nov 20, 2012 | Expired or cancelled cancelled Jan 2026 | 535 Teresita Bl | remodel of an existing kitchen and four bathrooms within an existing residential bldg. work includes installation of new railings along a rear deck and reconstruction of a set on interior stairs. new recessed lighting.Details
remodel of an existing kitchen and four bathrooms within an existing residential bldg. work includes installation of new railings along a rear deck and reconstruction of a set on interior stairs. new recessed lighting. | $96,000 |
| Nov 9, 2012 | Completed final sign-off Jun 2013 | 3730 Quintara St | kitchen and bath remodel. add 2 new baths, 1 new bedroom, replace all flooring,painting,add new tile to front stairs. remove wall between kitchen and living room. new hvac unitDetails
kitchen and bath remodel. add 2 new baths, 1 new bedroom, replace all flooring,painting,add new tile to front stairs. remove wall between kitchen and living room. new hvac unit | $70,000 |
| Jun 26, 2012 | Completed final sign-off Mar 2013 | 2176 15th Av | add 1 bedroom, 1 family room & 1 full bathroom on ground floor. remodel kitchen & bathroom, add 1 new full bathroom on 2nd floorDetails
add 1 bedroom, 1 family room & 1 full bathroom on ground floor. remodel kitchen & bathroom, add 1 new full bathroom on 2nd floor | $60,000 |
| Jun 4, 2012 | Completed final sign-off Jun 2012 | 355 Buena Vista East Av | replace kitchen cabinets, counter tops, sink, install gfi's (one kitchen). replace bath vanity, bath sink and new flooring (one bath) to comply with complaint #201224422Details
replace kitchen cabinets, counter tops, sink, install gfi's (one kitchen). replace bath vanity, bath sink and new flooring (one bath) to comply with complaint #201224422 | $15,000 |