Back to kitchen remodel contractors
Ceap Construction Inc.
- Based in
- Danville
- On San Francisco permits
- Aug 2021 to Sep 2026
- Last 24 months
- 4 permits filed
7 permits since 2000: 3 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 2 in progress. Typically 134 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Nov 2026 | 1608 Fulton St | top floor unit: interior renovation to include kitchen relocation, adding one bathroom, installation of a new hvac system, electrical service upgrade, new skylight, insulation improvements, replacement of 5 (e) rear windows with new, like for like. no change to occupancy, bldg height, footprint.Details
top floor unit: interior renovation to include kitchen relocation, adding one bathroom, installation of a new hvac system, electrical service upgrade, new skylight, insulation improvements, replacement of 5 (e) rear windows with new, like for like. no change to occupancy, bldg height, footprint. | $197,000 |
| Dec 15, 2025 | In progress issued Jun 2026 | 433 Oak Park Dr | comply nov#202545166. interior remodel includes kitchen renovation, bathroom remodeling, garage conversion to habitable space, recessed lighting upgrades, replacement of windows, electrical panel upgrade to 125amp. no structural work, no wall removal, no roof modification. legalize 1st flr bathroom.Details
comply nov#202545166. interior remodel includes kitchen renovation, bathroom remodeling, garage conversion to habitable space, recessed lighting upgrades, replacement of windows, electrical panel upgrade to 125amp. no structural work, no wall removal, no roof modification. legalize 1st flr bathroom. | $92,000 |
| Aug 19, 2021 | Completed final sign-off Oct 2021 | 38 Aztec St | remodel kitchen, guest bath and master bath with walls, floor plan with changes to walls and floor plans, reface gas fire place, replace recessed light fixturesDetails
remodel kitchen, guest bath and master bath with walls, floor plan with changes to walls and floor plans, reface gas fire place, replace recessed light fixtures | $40,000 |