Back to bathroom remodel contractors
Carson Construction
- Based in
- San Franicsco
- On San Francisco permits
- Mar 2000 to Sep 2025
- Last 24 months
- 2 permits filed
27 permits since 2000: 19 completed, 1 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2025 | In progress issued Oct 2025 | 1898 16th Av | kitchen- remove all fixtures, kitchen wall and hallway wall. install new flooring, cabinets & fixtures. bathroom- remove all fixtures, install new fixtures. downstairs bathroom- remove all fixtures, relocate bathroom, install new fixtures. new laundry area, replace all windows (20).Details
kitchen- remove all fixtures, kitchen wall and hallway wall. install new flooring, cabinets & fixtures. bathroom- remove all fixtures, install new fixtures. downstairs bathroom- remove all fixtures, relocate bathroom, install new fixtures. new laundry area, replace all windows (20). | $80,000 |
| Sep 15, 2021 | Completed final sign-off May 2024 | 6939 Geary Bl | (3) in-kind kitchen remodel (no changes to the floor plan, layout or walls), (4) in-kind bathroom remodel (no changes to floor plan, layout, or walls) lights per cenc 150.0(k).Details
(3) in-kind kitchen remodel (no changes to the floor plan, layout or walls), (4) in-kind bathroom remodel (no changes to floor plan, layout, or walls) lights per cenc 150.0(k). | $10,000 |
| Mar 13, 2015 | Completed final sign-off Jul 2015 | 130 Morningside Dr | remodel a 1/2 bathroom, replace plumbing fixtures, relocate door & sink per plan.Details
remodel a 1/2 bathroom, replace plumbing fixtures, relocate door & sink per plan. | $7,000 |
| Mar 10, 2015 | Completed final sign-off Jul 2015 | 130 Morningside Dr | remodel 1 bathroom, replace all plumbing fixtures, cabinet, tiles. (e) exhuast fan to remain, no new lighting.Details
remodel 1 bathroom, replace all plumbing fixtures, cabinet, tiles. (e) exhuast fan to remain, no new lighting. | $9,000 |
| Jun 18, 2008 | Expired or cancelled expired Nov 2023 | 518 Gellert Dr | remodel 2 bathrooms. remove shower, replace tub, water closet, sink, window master bathroom. replace water closet, sink, tub to shower, window. add lighting to kitchen, dinning, living, bedroom, hallway. add insulation to (e) walls. no structure work.Details
remodel 2 bathrooms. remove shower, replace tub, water closet, sink, window master bathroom. replace water closet, sink, tub to shower, window. add lighting to kitchen, dinning, living, bedroom, hallway. add insulation to (e) walls. no structure work. | $17,000 |
| Apr 17, 2007 | Completed final sign-off Apr 2008 | 10 Miller Pl | unit #1701- bathroom remodel: replace tiles, lighting fixtures, sink & shower faucets, cabinet, water closet. no structural work.Details
unit #1701- bathroom remodel: replace tiles, lighting fixtures, sink & shower faucets, cabinet, water closet. no structural work. | $15,000 |
| Jul 20, 2004 | Completed final sign-off Aug 2004 | 1998 Broadway | repalce tile, plumbing fixture, cabinety and update outlet @ 6th fl in all 3 bathrooms in structureDetails
repalce tile, plumbing fixture, cabinety and update outlet @ 6th fl in all 3 bathrooms in structure | $35,000 |
| Aug 12, 2002 | Completed final sign-off Feb 2005 | 1818 48th Av | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $30,000 |
| Apr 24, 2000 | Completed final sign-off Jul 2000 | 1376 04th Av | revision to 2000/03/03/3474.add 3 1 hour fire rated fixed windows to exterior bathroom wall.Details
revision to 2000/03/03/3474.add 3 1 hour fire rated fixed windows to exterior bathroom wall. | $600 |
| Mar 3, 2000 | Completed final sign-off Jul 2000 | 1376 04th Av | remodel bathroom, fill in prop line window, replace skylight.Details
remodel bathroom, fill in prop line window, replace skylight. | $9,000 |