Back to kitchen remodel contractors
Carroll Commercial Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Sep 2017
- Last 24 months
- 0 permits filed
35 permits since 2000: 23 completed, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 12 completed, 3 never finaled. Typically 0 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2015 | Completed final sign-off Apr 2017 | 263 29th St | raise roof over laundry room at rear expanding mstr bedroom roof deck above by 59 s.f. install new transome windows at kitchen & new franch doors from mstr bedroom to roof deck.Details
raise roof over laundry room at rear expanding mstr bedroom roof deck above by 59 s.f. install new transome windows at kitchen & new franch doors from mstr bedroom to roof deck. | $25,000 |
| Jul 20, 2015 | Completed final sign-off Dec 2016 | 105 Liberty St | interior renovation work of residential condo at 105 liberty street. remodel of two bathrooms and one kitchen, new light fixtures. removal of non-load bearing walls in remodeled master bedroom.Details
interior renovation work of residential condo at 105 liberty street. remodel of two bathrooms and one kitchen, new light fixtures. removal of non-load bearing walls in remodeled master bedroom. | $35,000 |
| Jun 25, 2015 | Completed final sign-off Sep 2018 | 410 Diamond St | partial demolition for dryrot inspection at bathroom and kitchen.Details
partial demolition for dryrot inspection at bathroom and kitchen. | $2,000 |
| Oct 16, 2014 | Never finaled issued Oct 2014, no final | 1777 Oak St | partial demolition of 500 sq. ft. of kitchen & bathroom for occupancy of pricing, dry rot exploration/inspection.Details
partial demolition of 500 sq. ft. of kitchen & bathroom for occupancy of pricing, dry rot exploration/inspection. | $10,000 |
| Oct 14, 2014 | Completed final sign-off Apr 2015 | 1777 Oak St | kitchen remodel, bathroom remodel, creation of new bathroom, enclose 26 sq.ft. light well, removal of non-load bearing walls, new lighting in living room, replacement of all exterior windows & doors.Details
kitchen remodel, bathroom remodel, creation of new bathroom, enclose 26 sq.ft. light well, removal of non-load bearing walls, new lighting in living room, replacement of all exterior windows & doors. | $120,000 |
| Aug 26, 2014 | Completed final sign-off Mar 2015 | 348 Arkansas St | kitchen and 2 bathrooms remodel, new bathroom fans, new lighting and electrical in kitchens and bathrooms, and removal of non-load bearing partitions. compliance with ordinance no 155-13 not reuqired.Details
kitchen and 2 bathrooms remodel, new bathroom fans, new lighting and electrical in kitchens and bathrooms, and removal of non-load bearing partitions. compliance with ordinance no 155-13 not reuqired. | $50,000 |
| Dec 13, 2013 | Completed final sign-off Oct 2018 | 410 Diamond St | renovate (e)single fam home, add basement & 3rd level, expand (e) 1st & 2nd levels, renovate (e) kitchen, family, basement: add 1 bathrm, 1/f add 1 1/2 bathrooms, 1 bedrm, 2nd floor: remove 1 bedrm, add 1/2 bath, 3/f: add 3 bedrms, 2 bathrmsDetails
renovate (e)single fam home, add basement & 3rd level, expand (e) 1st & 2nd levels, renovate (e) kitchen, family, basement: add 1 bathrm, 1/f add 1 1/2 bathrooms, 1 bedrm, 2nd floor: remove 1 bedrm, add 1/2 bath, 3/f: add 3 bedrms, 2 bathrms | $425,486 |
| Dec 5, 2013 | Never finaled issued Dec 2013, no final | 164 Delmar St | kitchen remodel with new bifold doors to backyard. install brackets with post /beam connections in garage. repaint exterior in back of bldg.Details
kitchen remodel with new bifold doors to backyard. install brackets with post /beam connections in garage. repaint exterior in back of bldg. | $70,000 |
| Sep 3, 2013 | Completed final sign-off Oct 2013 | 1020 Union St | kitchen remodel - install new appliances plumbing and electrical necessary. new cabinetry. new paint and flooring. sq. ft. 150.Details
kitchen remodel - install new appliances plumbing and electrical necessary. new cabinetry. new paint and flooring. sq. ft. 150. | $24,000 |
| May 9, 2013 | Completed final sign-off Jul 2015 | 656 Missouri St | kitchen remodel at 2nd floor, replace (e) 6x4 window with 6x62 sliding door at 1st floor living room. in (e) bathroom replace all fixtures to remain in same kitchen.Details
kitchen remodel at 2nd floor, replace (e) 6x4 window with 6x62 sliding door at 1st floor living room. in (e) bathroom replace all fixtures to remain in same kitchen. | $18,000 |
| Mar 1, 2012 | Completed final sign-off May 2012 | 647 04th Av | remodel kitchen. install new range with hood. new plumbing, new electrical. remove drywall to install services. kitchen lighting shall comply with cec 150 (k)8Details
remodel kitchen. install new range with hood. new plumbing, new electrical. remove drywall to install services. kitchen lighting shall comply with cec 150 (k)8 | $10,000 |
| Aug 5, 2009 | Never finaled issued Aug 2009, no final | 130 Langton St | unit 130a - kitchen remodel - no alteration of any wall - replace counter & cabinets.; bathroom remodel: replace plumbing fixtures and new tile on floor and wall. electrical and plumbing work under separate permit.Details
unit 130a - kitchen remodel - no alteration of any wall - replace counter & cabinets.; bathroom remodel: replace plumbing fixtures and new tile on floor and wall. electrical and plumbing work under separate permit. | $25,000 |
| Feb 17, 2009 | Completed final sign-off Apr 2009 | 66 Cleary Ct | remodel 1 kitchen and 2 bathrooms. install hardwood floor. through out.Details
remodel 1 kitchen and 2 bathrooms. install hardwood floor. through out. | $40,100 |
| Jul 17, 2008 | Completed final sign-off Jan 2009 | 224 Page St | remodel 3 kitchen & 3 bath. paint inteiror & exterior, repair of front stair in kind. less than 50% change entry door in kind @ every unit. no change to windows or existingDetails
remodel 3 kitchen & 3 bath. paint inteiror & exterior, repair of front stair in kind. less than 50% change entry door in kind @ every unit. no change to windows or existing | $53,000 |
| Jul 1, 2008 | Completed final sign-off Oct 2008 | 649 04th Av | 1 kitchen,1 bath, 1 laundry room remodel. new electrical and plumbing for each. build closet in home office room.Details
1 kitchen,1 bath, 1 laundry room remodel. new electrical and plumbing for each. build closet in home office room. | $24,750 |