Back to kitchen remodel contractors
Carlos & Brothers Construction
- Based in
- Fremont
- On San Francisco permits
- May 2023 to Aug 2025
- Last 24 months
- 6 permits filed
12 permits since 2000: 7 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 2 completed, 2 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2025 | In progress issued Aug 2025 | 779 20th Av | 3rd flr - interior model: combine(e) sunroom(room 308), with (e) bedroom (306) to master bedroom w/full bathroom and walk in closet remodel (307) convert (e) utility room to (n) full bathroom, conver (e) kitchen and breakfast nook to media storage room and laundry room. convertDetails
3rd flr - interior model: combine(e) sunroom(room 308), with (e) bedroom (306) to master bedroom w/full bathroom and walk in closet remodel (307) convert (e) utility room to (n) full bathroom, conver (e) kitchen and breakfast nook to media storage room and laundry room. convert | $150,000 |
| Feb 10, 2025 | In progress issued Feb 2025 | 779 20th Av | kitchen and bathroom remodel units (779 and 782) no wall removal. in kind remodels, all fixtures to remain in the same location. each unit (779, 781) to have 2 bathrooms and 1 kitchen remodeled. total of 4 bathrooms and 2 kitchens. each bath approx 48 sq ft. each kitchen approx. 120 sq ft.Details
kitchen and bathroom remodel units (779 and 782) no wall removal. in kind remodels, all fixtures to remain in the same location. each unit (779, 781) to have 2 bathrooms and 1 kitchen remodeled. total of 4 bathrooms and 2 kitchens. each bath approx 48 sq ft. each kitchen approx. 120 sq ft. | $150,000 |
| Feb 10, 2025 | Completed final sign-off Sep 2025 | 1449 Hyde St | unit 2 - 6. revison to permit: 202412277455 adding 5 kitchens remodel. like for like. (units 2-6). each kitchen approx. 200 sq ft.Details
unit 2 - 6. revison to permit: 202412277455 adding 5 kitchens remodel. like for like. (units 2-6). each kitchen approx. 200 sq ft. | $160,000 |
| Oct 1, 2024 | Expired or cancelled cancelled Apr 2025 | 1922 Bush St | unit b: 1)one kitchen and one bath remodel. 2)plumbing and electrical.Details
unit b: 1)one kitchen and one bath remodel. 2)plumbing and electrical. | $25,000 |
| Jul 31, 2024 | Completed final sign-off Aug 2024 | 1922 Bush St | unit a: replace kitchen cabinets; replace electrical trim/ fixtures throughout; replace flooring, paint and retrofit windows (all windows except living room); replace bathroom floor tiles. (no front windows, total 5 windows)Details
unit a: replace kitchen cabinets; replace electrical trim/ fixtures throughout; replace flooring, paint and retrofit windows (all windows except living room); replace bathroom floor tiles. (no front windows, total 5 windows) | $38,675 |