Back to kitchen remodel contractors
Car Construction
- Based in
- San Bruno
- On San Francisco permits
- Apr 2007 to Jun 2025
- Last 24 months
- 1 permit filed
41 permits since 2000: 32 completed, 3 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 never finaled. Typically 1 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2020 | Completed final sign-off Nov 2020 | 1337 Vallejo St | rev to0 201910295913 to comply with bid c/n, replaced 2 windows at laundry and 1 kitchen not visible to street. in-kind in (e) openings. no size changes. max u-factor .32 or better.Details
rev to0 201910295913 to comply with bid c/n, replaced 2 windows at laundry and 1 kitchen not visible to street. in-kind in (e) openings. no size changes. max u-factor .32 or better. | $1,100 |
| Oct 29, 2019 | Completed final sign-off Nov 2020 | 1337 Vallejo St | remodel kitchen and bathroom. remove and replace kitchen cabinets, add dishwasher and update electrical. remodel bathroom replace tub, vanity tile and update lighting. half bath sink replacement kitchen size 11' x 8.5".Details
remodel kitchen and bathroom. remove and replace kitchen cabinets, add dishwasher and update electrical. remodel bathroom replace tub, vanity tile and update lighting. half bath sink replacement kitchen size 11' x 8.5". | $52,000 |
| Mar 16, 2018 | Completed final sign-off Dec 2018 | 1337 Vallejo St | 1) kitchen remodel. 2)install new door at dining room. 3)widen door opening at laundry roomDetails
1) kitchen remodel. 2)install new door at dining room. 3)widen door opening at laundry room | $15,000 |
| Sep 21, 2017 | Completed final sign-off May 2018 | 346 Highland Av | 2/f: remodel (e) bathroom. relocate (e) kitchen with (e) bedroom. convert (e) bedroom into kitchen. install new non-bearing interior wall.Details
2/f: remodel (e) bathroom. relocate (e) kitchen with (e) bedroom. convert (e) bedroom into kitchen. install new non-bearing interior wall. | $45,000 |
| Dec 29, 2016 | Completed final sign-off Sep 2017 | 31 Ruth St | remodel kitchen add 96 sf deck at upper level. add 246 concrete patio at lower levelDetails
remodel kitchen add 96 sf deck at upper level. add 246 concrete patio at lower level | $40,000 |
| Aug 5, 2016 | Completed final sign-off Oct 2016 | 2242 Leavenworth St | work on #2242 leavenworkth - remodel kitchen with replacement of existing cabinet and updating electrical plugs and water lines to sink. layout to remain the same as existing. no wall relocation. cec 150.0(k)3.Details
work on #2242 leavenworkth - remodel kitchen with replacement of existing cabinet and updating electrical plugs and water lines to sink. layout to remain the same as existing. no wall relocation. cec 150.0(k)3. | $22,500 |
| Jun 30, 2015 | Never finaled issued Jul 2015, no final | 541 Hill St | unit c: remodel (e) kitchen, remove wall btwn kitchen & living rm, install new pocket dr at study, relocate electrical panel.Details
unit c: remodel (e) kitchen, remove wall btwn kitchen & living rm, install new pocket dr at study, relocate electrical panel. | $10,000 |
| Oct 8, 2009 | Completed final sign-off Mar 2011 | 313 Parnassus Av | remodel kitchen & bathroom; 1st floor remove window @ rear & istall french door, convert existing bath/laundry room into office. 2nd floor: convert sunroom into new deck w/french doors domming out of bedroom, enlarge bathroom @ 2nd floor.Details
remodel kitchen & bathroom; 1st floor remove window @ rear & istall french door, convert existing bath/laundry room into office. 2nd floor: convert sunroom into new deck w/french doors domming out of bedroom, enlarge bathroom @ 2nd floor. | $44,000 |
| Sep 26, 2008 | Completed final sign-off Feb 2009 | 20 Colby St | replace kitchen cabinets, appliances. install dishwasher, update plumbing and electrical to current codeDetails
replace kitchen cabinets, appliances. install dishwasher, update plumbing and electrical to current code | $30,000 |
| Apr 3, 2008 | Completed final sign-off Jul 2008 | 127 Lobos St | repair damage cause by roof leak-repl plaster, gut walls down to framing, install new insulation in attic & all exterior walls. install new 5/8 drywall & (e) doors to remain. kitchen cabinets to remain, install new counter top/casing w/baseboard. new tile in bathrm, fixtures remain. open kitchen walDetails
repair damage cause by roof leak-repl plaster, gut walls down to framing, install new insulation in attic & all exterior walls. install new 5/8 drywall & (e) doors to remain. kitchen cabinets to remain, install new counter top/casing w/baseboard. new tile in bathrm, fixtures remain. open kitchen wal | $28,000 |
| Nov 29, 2007 | Completed final sign-off May 2008 | 373 Lombard St | remove (e) tub in master bath. remove tile and vanity tub, (not vanity). remove and dispose of carpets and counter tops on kitchen cabinets. replace tub w/shower stall. tempered glazing at shower stall. bathroom remodel. no structural work.Details
remove (e) tub in master bath. remove tile and vanity tub, (not vanity). remove and dispose of carpets and counter tops on kitchen cabinets. replace tub w/shower stall. tempered glazing at shower stall. bathroom remodel. no structural work. | $12,000 |
| May 24, 2007 | Completed final sign-off Oct 2007 | 1747 Larkin St | remove carpets and tile from kitchen and bathroom. countertops only, n toilets and tubs, paint. 5 baths. carpet through apartment. existing lighting to remainDetails
remove carpets and tile from kitchen and bathroom. countertops only, n toilets and tubs, paint. 5 baths. carpet through apartment. existing lighting to remain | $50,000 |
| Apr 11, 2007 | Completed final sign-off Jul 2007 | 2111 Hyde St | kitchen: new appliances, cabinet modification, new countertopss, floors, & paint. bathroom: new tile to replace the old.Details
kitchen: new appliances, cabinet modification, new countertopss, floors, & paint. bathroom: new tile to replace the old. | $17,300 |