Back to kitchen remodel contractors
Capron Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jan 2015
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 1 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2014 | Completed final sign-off Aug 2014 | 224 Bowdoin St | kitchen renovation with new double hung window to replace existing in kind. new appliances, cabs, counters, sink/faucet, dishwasher and flooringDetails
kitchen renovation with new double hung window to replace existing in kind. new appliances, cabs, counters, sink/faucet, dishwasher and flooring | $15,000 |
| Oct 28, 2013 | Completed final sign-off Jan 2014 | 4425 Balboa St | unit 5: remove old cainets and replace with new ones at kitchen onlyDetails
unit 5: remove old cainets and replace with new ones at kitchen only | $10,000 |
| May 3, 2012 | Completed final sign-off Aug 2012 | 95 Duboce Av | interior kitchen remodel, no new habitable space , no changes to envelope.Details
interior kitchen remodel, no new habitable space , no changes to envelope. | $50,000 |
| Feb 18, 2011 | Completed final sign-off Dec 2011 | 1909 Alemany Bl | kitchen remodel. plumbing/gas stay in place. new cabinets. add gfci outlets and high efficacy lighting. replace uninsulated winode in kind. new flooring. new cased opening to dining room and new pocket doorDetails
kitchen remodel. plumbing/gas stay in place. new cabinets. add gfci outlets and high efficacy lighting. replace uninsulated winode in kind. new flooring. new cased opening to dining room and new pocket door | $10,000 |
| Dec 30, 2010 | Completed final sign-off Apr 2012 | 1216 19th St | interior renovation. ground fl: remodel(e)full bath, widen interior stair. 2nd fl: remodel kitchen. 3rd fl: relocate full bath, add (n) laundryDetails
interior renovation. ground fl: remodel(e)full bath, widen interior stair. 2nd fl: remodel kitchen. 3rd fl: relocate full bath, add (n) laundry | $135,000 |
| Feb 10, 2010 | Completed final sign-off May 2010 | 63 Albion St | work in unit 63 albion street only. replacing kitchen cabinets and appliances, new flooring. remodel only.Details
work in unit 63 albion street only. replacing kitchen cabinets and appliances, new flooring. remodel only. | $12,000 |