Back to kitchen remodel contractors
Canyon Construction
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2019 to Aug 2022
- Last 24 months
- 0 permits filed
9 permits since 2000: 6 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 6 days from filing to permit and 1137 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2021 | Completed final sign-off Aug 2024 | 1232 Cortland Av | one kitchen & one bathroom remodel. new cabinets,flooring,and finishes. add outlets per code, add angel stop for ice maker. install 9 additional can lights. replace all existing angle stops. replace shower valve. install new baseboard & trim. non structuralDetails
one kitchen & one bathroom remodel. new cabinets,flooring,and finishes. add outlets per code, add angel stop for ice maker. install 9 additional can lights. replace all existing angle stops. replace shower valve. install new baseboard & trim. non structural | $20,000 |
| May 27, 2021 | Completed final sign-off Jun 2024 | 264 Mullen Av | remove kitchen cabinets, disconnect (e) wh. remove flooring, expose remaining foundation. remove (e) foundation in section & replace foundation in sections. replace (e) finishes. no exterior work.Details
remove kitchen cabinets, disconnect (e) wh. remove flooring, expose remaining foundation. remove (e) foundation in section & replace foundation in sections. replace (e) finishes. no exterior work. | $40,000 |